| permit required | yes | s. 6.8.2 |
scout note
Within the required setback from the top of a coulee, ravine or valley, land must stay in its natural state: existing vegetation/tree removal is prohibited unless a registered engineer's geotechnical study shows removal won't harm slope stability; retained vegetation must be protected by a registered covenant.