{
 "answer": "The Village of Beiseker, Alberta has 2 adopted bylaws on file: Bylaw 2024-01 Permit Bylaw (rescinds Bylaw 2003-09); Bylaw 2026-04 Fees and Schedule Bylaw, verified 2026-09-27.",
 "municipality_id": "gx-000183",
 "municipality": "Beiseker",
 "status_type": "Village",
 "jurisdiction": "Alberta",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://www.beiseker.com",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw 2024-01 Permit Bylaw (rescinds Bylaw 2003-09)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-05-27",
   "document_url": "https://beiseker.com/wp-content/uploads/2024/05/2024-01-PERMIT-BYLAW-RESCIND-BYLAW-2003-09-draft.pdf",
   "summary": "Village of Beiseker Safety Codes Act permit bylaw: a valid permit is required before use, occupancy, relocation, construction or demolition of a building, or installing electrical/gas/plumbing/heating equipment; sets application, plan-review, inspection and revocation rules; fees per the current Fees and Schedules Bylaw.",
   "discovered_by": "ab-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "2e3030777869cb467d8d8cfe9d1462496777051463d05bd10a54d1b35dd704f8",
   "captured_at": "2026-09-25T01:52:39+00:00",
   "capture_http_status": 200,
   "document_number": "2024-01",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/2e3030777869cb467d8d8cfe9d1462496777051463d05bd10a54d1b35dd704f8.pdf",
   "link_dead": false,
   "transcript_url": "/ca/ab/beiseker/building-permits/bylaw-2024-01/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw 2026-04 Fees and Schedule Bylaw",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2026-01-26",
   "document_url": "https://beiseker.com/wp-content/uploads/2026/01/Bylaw-2026-04-Fees-and-Schedules-2026.pdf",
   "summary": "Same 2026 Fees and Schedule Bylaw recorded again under building_permits: sets the dollar fees (per sq ft / per fixture / per outlet) that Permit Bylaw 2024-01 Section 7 refers to for building, electrical, gas, plumbing and private-sewage-disposal permits.",
   "discovered_by": "ab-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "dab1ca538ce757938d27c7a10d2a7d5f7768174c42f13f7d2d7320cafabe275e",
   "captured_at": "2026-09-25T01:52:39+00:00",
   "capture_http_status": 200,
   "document_number": "2026-04",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/dab1ca538ce757938d27c7a10d2a7d5f7768174c42f13f7d2d7320cafabe275e.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Residential, commercial, industrial and assembly construction for new buildings/structures and alterations, additions and repairs to existing buildings/structures.",
    "fee_basis": "$6.00/$1,000 of Project Value (minimum $150.00); $0.40/sq. ft. (minimum $150.00); $0.35/sq. ft. (minimum $150.00); $6.00/$1,000 construction value (minimum $175.00); plus SCC Levy 4% of permit fee (min $4.50, max $560)."
   },
   "fact_citations": {
    "permit_required_for": "Schedule \"I\"",
    "fee_basis": "Schedule \"I\" a)"
   },
   "transcript_url": "/ca/ab/beiseker/building-permits/bylaw-2026-04/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/ab/beiseker/building-permits/"
}