(Effective: January 1, 2025)
BUILDING PERMIT FEE SCHEDULE
RESIDENTIAL/DWELLING UNITS/FARM
New Construction - Building Permit Levy (main level)
$0.52 per sq. ft.
- Upper/Lower Floors
$0.41 per sq. ft.
Additions/renovations/basement development
$0.41 per sq. ft.
$131.25 (minimum fee)
Accessory Buildings
Garages (attached or detached) (flat rate) (under 624 sq. ft.)
$131.25
Shops, garages, storage buildings (over 624 sq. ft.)
$0.41 per sq. ft.
Decks or garden storage sheds (sheds under 150 sq. ft.)
$105.00
Relocation of Home (set-up on basement or foundation)
$0.39 per sq. ft.
(min $131.25)
Placement of home (only)
$341.25 (minimum fee)
Fireplaces/Wood Stove (if not included in new construction) (flat rate)
$109.20
Demolitions Residential (flat rate)
$109.20
Geothermal Heating
$262.50
COMMERCIAL/INDUSTRIAL/INSTITUTIONAL
First $1,000,000.00 construction value
$6.56 per $1,000 construction value
Over $1,000,000.00 construction value
$6,560.00 + ($5.25 per $1,000 construction
value portions over $1,000,000.00)
(Minimum Fee)
$367.50
Demolitions Commercial (flat rate)
$157.50
MANUFACTURED AND MODULAR HOME
Modular Home (RTM's, etc)
$351.75
Basement Development
$0.41 sq. ft. (min. $150.00)
Manufactured Home Set-up
$210.00
Basement Development (if on foundation)
$0.41 sq. ft. (min. $150.00)
NOTE: Add applicable 'Safety Codes Council' levy to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater!
A minimum cancellation fee of $35.00 will be retained when a permit is cancelled or 25% up to a max of $250 of the fee if a drawing review has been
completed or an inspection has been carried out.
When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $500.00 surcharge per
permit.
Re-Inspections will be charged a rate of $150.00 (plus levy) per inspection.
Re-opening a previously closed permit will be charged at a rate of $75.00 (plus levy) per permit.
Permit extensions will be charges at a flat rate of $150.00 (plus levy) for a maximum of 1 year.
Variances will be charged at a rate of $120 (plus levy) per hour, minimum 2 hours.
Revision of Plans Reviews will be charged at a rate of $125.00 (plus levy) per hour, minimum 2 hours.
Site Consultations
Residential consultation/meeting charged at a rate of $125.00 (plus GST) per hour, minimum 2 hours . Commercial / Industrial consultation/meeting
charged at a rate of $150.00 (plus GST) per hour, minimum 2 hours
(Effective: January 1, 2025)
GAS PERMIT FEE SCHEDULE
Residential Installations
Non-Residential Installations
# of Outlets
Permit Fee
B.T.U. Input
Permit Fee
1 - 3
$105.00
10,000 - 30,000
$99.75
4 - 6
$136.50
30,001 - 60,000
$99.75
7 - 9
$173.25
60,001 - 90,000
$105.00
10 - 12
$199.50
90,001 - 120,000
$110.25
13 - 15
$225.75
120,001 - 150,000
$110.25
16 - 18
$246.75
150,001 - 180,000
$115.50
19 - 20
$273.00
180,001 - 210,000
$120.75
210,001 - 300,000
$131.25
300,001 - 450,000
$147.00
450,001 - 600,000
$162.75
600,001 - 750,000
$178.50
750,001 - 900,000
$194.25
900,001 - 2,000,000
$246.75
Over 2,000,000Add $ 15.75 per 100,000 BTU
Propane and Small Installations
Propane Tank Sets (New or Replacements)
$94.50 Per Appliance
Temporary Propane/Natural Gas Heating (Includes Tank Set)
$94.50 Per Appliance
Gas/Propane Cylinder Refill Centers
$299.25 Per Appliance
Replacement Commercial or Industrial Appliances (per unit)
1 - 400,000 BTU Input
$131.25 per Unit
400,001 - 3,000,000 BTU Input
$183.75 per Unit
Over 3,000,000 BTU Input
$341.25 per Unit
* Note
NOTE: Add applicable 'Safety Codes Council' levy to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater!
A minimum cancellation fee of $35.00 will be retained when a permit is cancelled or 25% up to a max of $250 of the fee if a drawing review has been
completed or an inspection has been carried out.
When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $500.00 surcharge per
permit.
Re-Inspections will be charged a rate of $150.00 (plus levy) per inspection.
Re-opening a previously closed permit will be charged at a rate of $75.00 (plus levy) per permit.
Permit extensions will be charges at a flat rate of $150.00 (plus levy) for a maximum of 1 year.
Variances will be charged at a rate of $120 (plus levy) per hour, minimum 2 hours.
Revision of Plans Reviews will be charged at a rate of $125.00 (plus levy) per hour, minimum 2 hours.
Site Consultations
Residential consultation/meeting charged at a rate of $125.00 (plus GST) per hour, minimum 2 hours . Commercial / Industrial consultation/meeting
charged at a rate of $150.00 (plus GST) per hour, minimum 2 hours
(Effective: January 1, 2025)
PLUMBING PERMIT FEE SCHEDULE (RESIDENTIAL)
# of Fixtures
Permit Fee
# of Fixtures
Permit Fee
1 - 3
$99.75
22 - 24
$210.00
4 - 6
$115.50
25 - 27
$225.75
7 - 9
$131.25
28 - 30
$241.50
10 - 12
$147.00
31 - 33
$257.25
13 - 15
$162.75
34 - 36
$273.00
16 - 18
$178.50
37 - 40
$294.00
19 - 21
$194.25
Add $3.67 per fixture over 40
PRIVATE SEWAGE PERMITS
Private Sewage System - $350.00
Holding Tanks - $150.00
PLUMBING PERMIT FEE SCHEDULE (COMMERCIAL)
# of Fixtures
Permit Fee
# of Fixtures
Permit Fee
1 - 3
$99.75
52 - 54
$367.50
3 - 6
$115.50
55 - 57
$383.25
7 - 9
$131.25
58 - 60
$399.00
10 - 12
$147.00
61 - 63
$414.75
13 - 15
$162.75
64 - 66
$430.50
16 - 18
$178.50
67 - 69
$446.25
19 - 21
$194.25
70 - 72
$462.00
22 - 24
$210.00
73 - 75
$477.75
25 - 27
$225.75
76 - 78
$493.50
28 - 30
$241.50
79 - 81
$509.25
31 - 33
$257.25
82 - 84
$525.00
34 - 36
$273.00
85 - 87
$540.75
37 - 39
$288.75
88 - 90
$556.50
40 - 42
$304.50
91 - 93
$572.25
43 - 45
$320.25
94 - 96
$593.25
46 - 48
$336.00
97 - 100
$614.25
49 - 51
$351.75
Add $3.67 each fixture over 100
NOTE: Add applicable 'Safety Codes Council' levy to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater!
A minimum cancellation fee of $35.00 will be retained when a permit is cancelled or 25% up to a max of $250 of the fee if a drawing review has been
completed or an inspection has been carried out.
When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $500.00 surcharge per
permit.
Re-Inspections will be charged a rate of $150.00 (plus levy) per inspection.
Re-opening a previously closed permit will be charged at a rate of $75.00 (plus levy) per permit.
Permit extensions will be charges at a flat rate of $150.00 (plus levy) for a maximum of 1 year.
Variances will be charged at a rate of $120 (plus levy) per hour, minimum 2 hours.
Revision of Plans Reviews will be charged at a rate of $125.00 (plus levy) per hour, minimum 2 hours.
Site Consultations
Residential consultation/meeting charged at a rate of $125.00 (plus GST) per hour, minimum 2 hours . Commercial / Industrial consultation/meeting
charged at a rate of $150.00 (plus GST) per hour, minimum 2 hours
(Effective: January 1, 2025)
ELECTRICAL PERMIT FEE SCHEDULE
(For "Other Than" New Single Family Residential)
Installation Cost $
Permit Fee
Installation Cost $
Permit Fee
Under 2,000
$99.75
39,000.01 - 42,000
$435.75
2,000.01 - 3,500
$115.50
42,000.01 - 45,000
$456.75
3,500.01 - 5,000
$136.50
45,000.01 - 48,000
$472.50
5,000.01 - 6,500
$152.25
48,000.01 -60,000
$488.25
6,500.01 - 8,000
$168.00
60,000.01 - 90,000
$561.75
8,000.01 - 9,500
$183.75
90,000.01 - 120,000
$651.00
9,500.01 - 12,000
$199.50
120,000.01 - 150,000
$740.25
12,000.01 - 15,000
$215.25
150,000.01 - 180,000
$834.75
15,000.01 - 18,000
$231.00
180,000.01 - 210,000
$929.25
18,000.01 - 21,000
$288.75
210,000.01 - 240,000
$1,029.00
21,000.01 - 24,000
$320.25
240,000.01 -350,000
$1,275.75
24,000.01 - 27,000
$341.25
350,000.01 - 500,000
$1,590.75
27,000.01 - 30,000
$357.00
500,000.01 - 650,000
$1,905.75
30,000.01 - 33,000
$367.50
650,000.01 - 800,000
$2,241.75
33,000.01 - 36,000
$383.25
800,000.01 - 1,000,000
$2,640.75
36,000.01 - 39,000
$399.00
Add $84.00 for every $50,000 over $1,000,000
ELECTRICAL PERMIT FEE SCHEDULE
(For "NEW" Single Family Residential)
Based on Size of Dwelling (Square Footage)
Permit Fee
Contractor
Homeowner
Up to 1200 square feet
$168.00
$252.00
1201 to 1500 square feet
$194.25
$291.38
1501 to 2000 square feet
$220.50
$330.75
2001 to 2500 square feet
$246.75
$370.13
Over 2500 square feet
$315.00
$472.50
Attached Garage
Include square footage of garage with house
Basement development wiring - new home - if done at time of initial
construction (otherwise as per above)
Include square footage of basement with house
Mobile home connection
$105.00
$157.50
Manufactured, Modular and RTM Homes (on foundation or
basement)
$120.75
$181.13
Detached Residential Garage
$0.21/ Sq. Ft.
$0.31/ Sq. Ft.
Minimum Fee
$99.75
$149.62
NOTE: Add applicable 'Safety Codes Council' levy to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater!
A minimum cancellation fee of $35.00 will be retained when a permit is cancelled or 25% up to a max of $250 of the fee if a drawing review has been completed or an
inspection has been carried out.
When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $500.00 surcharge per permit.
Re-Inspections will be charged a rate of $150.00 (plus levy) per inspection.
Re-opening a previously closed permit will be charged at a rate of $75.00 (plus levy) per permit.
Permit extensions will be charges at a flat rate of $150.00 (plus levy) for a maximum of 1 year.
Variances will be charged at a rate of $120 (plus levy) per hour, minimum 2 hours.
Revision of Plans Reviews will be charged at a rate of $125.00 (plus levy) per hour, minimum 2 hours.
Site Consultations
Residential consultation/meeting charged at a rate of $125.00 (plus GST) per hour, minimum 2 hours . Commercial / Industrial consultation/meeting charged at a rate of
$150.00 (plus GST) per hour, minimum 2 hours
(Effective: January 1, 2025)
ANNUAL ELECTRICAL PERMIT FEE SCHEDULE
(Based On Cost of Installation)
Total Cost of Installation
Permit Fee
$2,000 or Less
$450.00 (maximum 2 hours inspection time thereafter $95.00
per hour or portion thereof)
$2,000 to $5,000
$450 plus $3.25 each $100 cost or fraction of $100 over
$2,000.
$5,000.01 to $50,000
$600 plus $1.60 each for $100 cost or fraction of $100 over
$5,000.
$50,000.01 to $1,000,000
$1,200 plus $1.10 each $100 cost or fraction of $100 over
$50,000.
$1,000,000.01 and over
Contact The Inspections Group Inc. for cost.
NOTE: Add applicable 'Safety Codes Council' levy to each permit; $ 4.50 each permit or 4% of permit levy, whichever is greater!
A minimum cancellation fee of $35.00 will be retained when a permit is cancelled or 25% up to a max of $250 of the fee if a drawing review has been
completed or an inspection has been carried out.
When work has commenced without first obtaining the required permit(s); the permit fees will be doubled up to a maximum of $500.00 surcharge per
permit.
Re-Inspections will be charged a rate of $150.00 (plus levy) per inspection.
Re-opening a previously closed permit will be charged at a rate of $75.00 (plus levy) per permit.
Permit extensions will be charges at a flat rate of $150.00 (plus levy) for a maximum of 1 year.
Variances will be charged at a rate of $120 (plus levy) per hour, minimum 2 hours.
Revision of Plans Reviews will be charged at a rate of $125.00 (plus levy) per hour, minimum 2 hours.
Site Consultations
Residential consultation/meeting charged at a rate of $125.00 (plus GST) per hour, minimum 2 hours . Commercial / Industrial consultation/meeting
charged at a rate of $150.00 (plus GST) per hour, minimum 2 hours