New Single Family Dwelling
$150
New Multi Unit Dwelling (duplex/townhouse/
$150 for the first unit plus
apartment)
$100 for each additional unit
to a maximum of four (4)
Accessory Building/Structure over 10m2
$150
Additions/Secondary Suites
$100
Home Occupation 2
$100
Home Occupation 3
$200
Demolition Permit
$150
Discretionary Uses (includes variances)
in addition to any other fee
$200
Minor Variance for permitted uses (includes all)
in addition to any other fee
$75
Major Variance for permitted uses (includes all)
in addition to any other fee
$200
New Construction/Additions
< 5,000 sqft (gfa)
$250
5,001 - 20,000 sqft
$350
20,001 - 50,000 sqft
$550
> 50,000 sqft
$1,000
Intensification of Use
$250
Shipping Container
$100
Demolition Permit
$150
Discretionary Uses (including variances)
in addition to any other fee
$200
Minor Variance for permitted uses (includes all)
in addition to any other fee
$75
Major Variance for permitted uses (includes all)
in addition to any other fee
$200
Change in Use
$100
New Use
$100
Sign Permits
$80
LUB Amendment
$800
Outline Plan Adoption
$1,000
ASP Amendment
$800
ASP Adoption
$1,500
MDP/IMDP Amendment
$800
SDAB Appeal
$150 (if appellant is successful, fee is refunded)
Subdivision Application
$750 plus $350 per new lot
Subdivision Time Extension (1st Request)
$350
Subdivision Time Extension (2nd Request)
$450
Subdivision Time Extension (3rd Request)
$550
Subdivision Endorsement
$220 per lot
Condominium Application
$40 per unit
Land Title Search
$25
Certificate of Compliance
$75
Records Search
$125
Request for Extension
6 months
$0
Additional 6 months
10% of permit fee, minimum $125
Alternative Solutions / Variances
$150/hour, minimum 2 hour charge
Additional Work Found During Inspection
$75
Changes to Drawings or Design After Permit Issuance
$150
Planning and Permitting Application Fee Schedule (effective January 1 2026)
Residential Development Permits
Non-Residential Development Permits
Planning Applications
Records Searches
Miscellaneous Building, Gas, Electrical Fees
Minimum Fee
$225
New Construction
$7.00 per $1000 of Project Value
Additions
$7.00 per $1000 of Project Value
Accessory Structures
$7.00 per $1000 of Project Value
Structural Alterations/Basement Development/Decks/Secondary
Suites
$7.00 per $1000 of Project Value
Wood Burning Stove/Fire Place
$225
Hot Tub/Swimming Pool
$225
Alternate Energy Permits
$225
Demolition Permit
$225
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of building permit fee up to a maximum of $560
Minimum Fee
$300
New Construction/Additions/Structural Alterations
$7.00 per $1000 of Project Value
Shipping Container
$300
Change in Classification/Occupancy
in addition to any other fee
$260
Demolition Permit
$300
Alternate Energy Permits
$7.00 per $1000 of Project Value
Fire Supression/Sprinkler System/HVAC Installation
$7.00 per $1000 of Project Value
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of building permit fee to a maximum of $560
Single Family Dwellings, Additions
Up to 1000 sqft
$225
1001-1200 sqft
$250
1201-1500 sqft
$275
1501-2000 sqft
$300
2001-2500 sqft
$325
Over 2500 sqft
$325 plus $0.10 per sqft
Temporary Power/ Underground Service
$225
Permanent Service Connection
$225
Alternate Energy (Solar, Wind)
$225
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of electrical permit fee up to a maximum of $560
Other than Single Family Dwellings, Additions and Residential
$0.00 - $2,500 Installation Cost
$225
$2,501 - $5,000 Installation Cost
$250
$5,001 - $7,500 Installation Cost
$300
$7,501 - $10,000 Installation Cost
$350
$10,001 - $20,000 Installation Cost
$475
$20,001 - $30,000 Installation Cost
$600
$30,001 - $40,000 Installation Cost
$725
$40,001 - $50,000 Installation Cost
$875
$50,001 - $100,000 Installation Cost
$1,100
$100,001 - $250,000 Installation Cost
$1,300
$250,001 - $350,000 Installation Cost
$1,650
$350,001 - $500,000 Installation Cost
$1,900
$500,001 - $750,000 Installation Cost
$2,500
$750,001 - $1,000,000 Installation Cost
$3,000
Greater than $1,000,000
Divide total installation cost by $1,000 and
then multiply by 3.000
Annual Electrical Maintenance
$375
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of electrical permit fee up to a maximum of $560
Residenital and Non-Residential Installations
Up to 20 fixtures
$225
Over 20 fixtures
$225 plus $5.00 per fixture
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of plumbing permit fee up to a maximum of $560
Residential Installations
1-5 Outlets
$225
Non-Residential Building Permits
Residential Electrical Permits
Plumbing Permits
Residential Gas Permits
Non-Residential Electrical Permits
Residential Building Permits
6-10 Outlets
$250
11-15 Outlets
$275
16-20 Outlets
$325
Over 20 Outlets
$325 plus $10 per outlet over 20
Propane Tank Set
In addition to permit fee for number of outlets
$225
Temporary Heat
$225
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of gas permit fee up to a maximum of $560
New and Replacement Installations
0 - 400,000 BTU
$225
400,001 - 750,000 BTU
$275
750,001 - 1,000,000 BTU
$350
1,000,001 - 2,000,000 BTU
$375
Over 2,000,000 BTU
$375 plus $7 per 100,000 (or portion
of) over 2,000,000 BTU
Propane Tank Set
In addition to permit fee for BTU input
$225
Temporary Heat (Propane Installation)
$250
Propane Cylinder Refill Centre
$250
Additional Inspection Requested or Re-Inspection Required
$125
Safety Code Council Levy
4% of gas permit fee up to a maximum of $560
Where development commences before a permit is issued, the permit fee is doubled.
Non-Residential Gas Permits (Mutli-Family, Commercial, Industrial, Institutional)