Policy 643 – Service Fee Schedule (2024)

Chestermere, Alberta · No. 643 · adopted 2024-06-01 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 6d49004fd7b1 · verified 2026-09-27 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

CITY OF CHESTERMERE SERVICE FEE SCHEDULE POLICY HANDBOOK EFFECTIVE DATE: SECTION: 600 POLICY: 643 December 7th, 2009 APPROVED BY: SUBJECT: Service Fee Schedule COUNCIL REVISED DATE: Previous revision: February 21, 2017 Previous revision: January 17, 2023 Previous revision: September 1, 2023 Effective date of revision: June 1, 2024 PAGE NO.: 21 pages NOTE: GST DOES NOT APPLY UNLESS NOTED FEE TYPE FEE Plans Area Structure Plan $7,500 plus $100 per ha Re-development Plan Application (same as ASP) $3000 plus $300 per ha Outline Plan Application Tech report review submissions (TIA, BIA, Storm reports. Water reports. Sanitary-etc.). 3rd Party cost plus 10% NOTE: Fees are for general administration review process as posted online in relating specifications. Amendments (cost per amendment) Area Structure Plan Amendment $5000 Area Re-development Plan Amendment $5000 Municipal Development Plan Amendment and Land Use Amendment $5000 NOTE: Fees are for general administration review process as posted online in relating specifications. Subdivision Requests $1750 for 2 lot subdivision plus $200 per lot for 3 or more lots. Subdivision (Tentative) Plan Application Except for MR & ER lots. Bare land Condo: $1150 for >10 units. Land Redivision $1150 plus $150 per unit for > 10 units $50 per unit Building Redivision Linen Endorsements and Discharge of Caveats Except for MR and ER lots. $150 per ioi $5000 Road Closure $1500 Stripping and Grading $400 Subdivision time extension request Subdivision Other Fees $15,000 per ha Administration fees Public Facilities $45,000 per ha Commercial/Industrial lands $4,000 per residential unit Residential lands The Public Facility fee for multi-family lot shall be calculated and paid at the approval of Comprehensive Development Permit. $45,000 per ha plus $4,000 per residential unit Mixed-Use (Commercial & Residential) $45,000 per ha Others (e.g. roads, excluding MR/ER/PUL) NOTE: if the land is rezoned after subdivision, the developer shall pay for the increased amount from the recalculation; However, the original fee will remain if the recalculation results in a reduction of the fees. Residential Development Permits/ Land Use Compliance/Development Reviews Single Family Dwelling / Semi-Detached- per unit (Permitted Development Review) $300 $800 DC & Infill Development (pre-& post site inspection) $850 plus $75 per unit Multi-Unit Dwelling Minor Residential (All Discretionary Uses in the Residential District except Home Business and Accessory Building between 10 to 30 sq. m) Admin fee may apply at the description of the Development Officer for additional work outside the scope of a general development review for infills or more than minimum pre- application meetings. $400 All Accessory Buildings >10 sq. m. $100 plus $1.00 per sq. m. Addition Minor Residential (Permitted Uses and addition to structures that are listed under Permitted Use) $100 plus $1.00 persq. m. Demolition/Relocation (All buildings) $250 $150 and 50% of DP fee plus admin fee at the discretion of the Development Authority Revisions after Development review or issued Development Permit (Complexity of revision to be determined by Development Authority) Home Business Permits (this does not include annual licensing fees) $250 Minor $300 plus Advertising fee Major (3-year permit) $150 plus Advertising fee Major Renewal Commercial / Industrial / Institutional Development & Use Permits $800 plus $0.75 per sq. m New Development $250 Permitted Uses $100 Change of Tenancy $500 Discretionary Uses Revision of Issued Development Permit (complexity of revision to be determined by Development Authority) $350 $350 Residential Show Home/Sales Centre/Spec Home $250 Exterior Renovation $250 Development Completion Certificate (DCC) Inspect. DCC additional inspections (same project) $100 per additional inspection Sign Requests $350 Freestanding $350 Freestanding (2 or more) $200 Fascia, Canopy, Awning $350 Fascia, Canopy, Awning (2 or more) Temporary/Portable $300 61 days to 90 Days $200 31 days to 60 Days $100 Up to and including 30 Days $150 Certificate of Sign Conformance $150 All other signs / not otherwise listed Variance Request (Plus advertising fee for approval) Single Family/Duplex/Semi-Detached/Multi-Unit Dwelling (principal building incl. eaves, cantilevers & front porch) - Admin fee may apply for legal non-confirming - Per type of variance $400 Other Residential Uses (deck, accessory building, stairs, fence, etc.) $250 - Admin fee may apply for legal non-confirming Per type of variance Commercial/Industrial/Institutional- per variance $500 Home business $150 Sign $150 Certificate of Compliance Residential (Regular Service) $150 Residential (Rush Service) $300 Commercial & All Others (Regular Service) $350 Commercial & All Others (Rush Service) $450 Amendments to compliance letter (within a year) Admin fee Compliance review after refusal addressing a non-compliant issue will be performed at no cost to the applicant as long as compliance is obtained within a year of the date of the RPR, Appeal as Permit Applicant $400 Appeal as Affected Neighbour $200 Subdivision Appeal $350 Encroachment Agreements (originally established by policy 316) Letter of Consent; encroachments not requiring an encroachment agreement (Schedule 'A'; Policy 316) Basic Admin Fee Encroachment Agreement; non-circulation (Schedule 'B'; Policy 316) $300 Encroachment Agreement Application (Utility ROW & ODRW) $100 Application for Encroachment Agreement; to be circulated (outside of Schedule 'A' & 'B'; Policy 316) $200 Encroachment Agreement Less than 10 m2, and Approved by the circulation process $500 Encroachment Agreement more than 10 m2, and Approved by the circulation process $1000 Third Party Agreements: Crossings and Proximities Fee must be attached to this Application for New Application $500 Fee must be attached to this Application for Amendments (GST exempt) $250 Large Application/Requests there is a minimum of $2,000.00 for new requests and a $1,000.00 for Amendments $2000 Approach Approval Fee must be attached to this Application for New Application $500 Fee must be attached to this Application for Amendments (GST exempt) $250 Performance Deposit $1,500 Demolition (residential) To the discretion of Development Officer (Minimum $1500) Demolition (commercial) $7,500 New Home Construction $2,500 Landscaping Deposit NOTE: Deposits are returned when completed and inspected for compliance. Uthers Advertising for Permit Approval $100 Advertising for Public Hearing (excl. SDAB hearing) $250 Basic Administration Fee Note: Basic admin fees are not returned. Discretionary Use approvals and Variance approvals are subject to the advertising fee. $100 per hour Basic Administration Fee applies to the following applications: i. Statutory Declaration to prove removal of non- compliance issues, ii. Applicant withdraws application, iii. Other administrative work considered necessary by Development Officer. Land filling (existing acreage) $525 Zoning Letters $100 per address, $200 for rush service Discharge of Caveat $100 per title Important Notes: - Permits applied for after Stamp of Compliance are subject to doubling the building permit fee, at the discretion of the Building Safety Codes Officer - SDAB Fee Refunds: Successful appeals by an affected adjacent residential property owner shall be refunded $100. - Development Services may consider the application inactive and return the application if: - If an applicant does not communicate with Development Services Staff their intentions for the application for 6 months after the ASP, OP, Amendments, Subdivision, or Commercial/Industrial / Institutional application has been received by the CITY; - If a residential development permit application is not deemed complete within 40 days after the application has been received by the City. Development Services may consider the application inactive and return the application. The application fee will not be refunded. Should a new application be submitted after return of the original application the new application fee shall apply. Building P©rmit F©6 (note: fees are calculated by set rates, times sq. area, divided by $1000, or by prevailing market value (PMV) times by set rates, divided by $1000) Residential Construction (Single & Semi-detached $9.93 per $1000 value (cost estimation), Minimum fee $100 Refer to Exhibit "A" for the calculation of cost estimation Residential home waste management fees- Three bins (one bin per service) per address, includes delivery and kitchen catcher. $250.00 $10.45 per $1000 value (cost estimation*), Minimum fee $250 Commercial, Industrial, Institutional & Multi-family Construction Partial Building Permit to Subfloor Only (Single & Semi-detached residential only) $95 $1.47per sq. meter of building area ($200 minimum to $4,516 maximum) Partial building permit to grade (Commercial, Industrial, Institutional & Multi-family) Accessory Building between 10 to 30 sq. m (not including hot tubs/pools). Renovations (Residential) Refer to Exhibit "R" (Residential Cost Estimate- Renovation) for the calculation of cost estimation $115 9.93 per $1000 value (cost estimation) Minimum fee $100 $10.45 per $1000 value (cost estimation*), Minimum $200 Renovations (Non-residential) Retaining Walls (supporting over 1.2m of backfill or over 1.2m in height) $200 $110 Hot Tubs $120/ above ground Swimming Pool $170/ below ground $1.44 per m2 minimum fee $100 Demolition/Relocation Permits $40.69 per m2 minimum fee $100 Secondary Suite(new) Pre-Application Inspection (Home Business-Bed and breakfast, Hair salon, and Secondary Suite) $100/discipline Extra requested inspections above required set out in plans review, QMP, or out of sequence, at the discretion of the Safety Codes Officer. (minimum fee must be paid prior to Inspection, additional hours to be paid prior to final inspection Commercial/Residential $150.00 per inspection, per discipline $2500 plus $9.93 per $1000 (cost estimate), minimum of $100 plus Plumbing, Electrical, Gas & HVAC permit if required Environmental Restoration Permit Safety Inspection Fee (minimum fee must be paid prior to inspection, additional hours to be paid prior to final inspection) $150 per hr (Minimum 2 hours) Failure to File a Verification of Compliance (within time requested by a Safety Codes Officer) Failure to Call for an inspection or to recall an Inspection (must pay prior to next inspection) $300 per offence $300 per offence Occupying a Building Prior to Final inspection, or at the discretion of the Safety Codes Officer. $750 per day of occupancy, up to a maximum of $10,000 Unauthorized Work, including excavation, started prior to issuance of a Permit, shall have double fees Double Building Permit Fee (At the discretion of BSCO) Plan Re-Examination (where requested by a Safety Codes Officer due to inaccuracies or lack of information in the plans or specifications originally submitted or revisions submitted by the applicant after the plans review has been completed) Residential $150 Comm., Industrial, Institutional and Multi- Family $350 If, in the opinion of the Safety Codes Officer, more than one inspection is necessitated by the failure of the contractor/owner to complete any of the following: a) ensure safe access to a site for an inspection, b) ensure the deficiencies are corrected for the next inspection, c) work not ready for the inspection, d) no address posted on the building during all stages of construction; additional fees may be charged for re-inspection. $300 Failure to ensure construction bins are fully placed on the construction site, emptied in a timely fashion, or used as required $1000 NOTE: Permits applied for after Stamp of Compliance are subject to doubling the building permit fee, at the discretion of the BSCO. Gas Permit Fees Residential Base Permit Fee $90 0-2000ft2 $150 Plus base permittee 2000ft2-3500ft2 $175 Plus base permit fee Over 3500 ft2 $250 Plus base permit fee Com, Ind, Ins, Accessory Permit $200 Plus base permit fee 0 - 400,000 BTU 400,001 - 1,000,000 BTU $250 Plus base permit fee $350 Plus base permit fee 1,000,001 - 2,000,000 BTU Over 2,000,000 BTU $450 plus base permit fee Base Fee = $90 Replacement Fee for Com, Ind appliance Base Fee plus $40 per unit 0 - 400,000 BTU Base Fee plus $110 per unit 400, 001 - 5,000,000 Base Fee plus $340 per unit over 5,000,000 BTU $90 per unit Propane Tank Sets (Commercial) $90 per unit Gas Fireplace Installation (Residential) Base Fee of $90 plus $80 per unit Gas Fireplace Installation (non-residential) Gas Air Test - 1 per unit required including Commercial & Residential (reinspection fee will apply for reinspection of failed gas air test) $90 $90 Appliance replacement $120 Temporary Gas Permit or Propane Plumbing Permit Fees Residential All Plumbing permit fees are calculated at $9.00 per $1,000.00 of estimated construction costs (minimum $100) plus $90.00 base permittee. If the calculated fee is less than $100, use $100 (minimum) plus $90.00 base permittee. Com, Ind, Ins, Multi-family & Accessory Permit All Plumbing permit fees are calculated at $9.75 per $1,000.00 of estimated construction costs per unit plus processing fee of $120.00 per unit. $250 Private Sewage Water and Sewer Connection (New house construction) $110 Ground works Inspection (mandatory for new house construction) $110 $100 Special Event (connection only) $125 Hydronic heating Mechanical (HVAC) Permit Fees Included in building permit fee Residential $9.00 per $1000 of estimated construction value plus a minimum processing fee of $120.00) Comm. Ind. Ins. Multi-family & Accessory Permits Air Conditioning Unit As per Cost Estimate Exhibit tiectricai Hermit t-ees Residential $90 Base Permit Fee Less than 2000ft2 $180 Plus base permittee $225 Plus base permit fee 2000ft2 - 3500 ft2 $275 Plus base permit fee over 3500 ft2 Com, Ind, Ins, Multi-Family & Accessory Permit (Value of Material/Labour) $0 -$500 $90 $500.01 - $1,000 $150 Plus base permit fee $1,000.01 - $5,000 $165 Plus base permittee $5,000.01 - $10,000 $225 Plus base permit fee $10,000.01 -$20,000 $350 Plus base permit fee $20,000.01 - $40,000 $500 Plus base permit fee $40,000.01 - $60,000 $700 Plus base permit fee $60,000.01- $80,000 $900 Plus base permit fee $80,000.01 - $100,000 $1,100 Plus base permit fee $100,000.01 - $120,000 $1,400 Plus base permit fee $1400.00 plus for each $5000 in construction value add $50 $120,000.01 plus Utility for Residential units (water meter) $822 per unit Annual maintenance permit $150 Safety Council Fee: $4.50 per permit issued or 4% of permit cost, whichever is greater to a maximum of $560 For other building permits not listed in this fee schedule, $80/hour will be charged. Permit Extensions Single & Semi-detached, Multi-family residential and Commercial/Industrial/Institution Building Permit Extension al) 25% of original building permit fee Minimum $100 Others; 25% of original building permit fee Minimum $50 Utility Permit Extension (Plumbing, Gas, Electrical and HVAC) 50% of the original permit fee, Min $100 Admin Fee at the discretion of the Development Authority Development Application Extension Agreement Development Permit Extension 50% of DP fee/min $100 Permit Refund No refund on the Safety Codes Fee BP REFUND DP REFUND STAGES DP Fee Minus $100 Full Refund if Paid Submitted application Development Permit is currently being reviewed. Full Refund if Paid NO REFUND Full Refund if Paid NO REFUND Development Permit is Approved. Total of BP minus $100 (per hour) Building Permit is in Plans Examination Stage and/or Issued. NO REFUND Building Inspection (at least one) has been done and completed. NO REFUND NO REFUND Permit Fee Minus $100 Permit is reviewed and issued. Utility Permit Permit is Issued and at least 1 inspection is done or at the Final stage. (Plumbing, Electrical, Gas and Hvac) NO REFUND Subdivision Additional Inspection Fee $150/hr Subdivision additional inspections (Engineering or Landscape inspections) NOTE: City staff reserves the right to refuse inspection due to unsatisfactory site conditions. At the discretion of the inspector, additional inspection charges/fees may apply. Photo Copying & Faxing Fees Colour Black & White Copies per page 1.00 .50 8.5 x 11 1.00 2.00 8.5 x 14 3.00 2.00 11 x 17 oio ot flapping i-ees (plus o51) Map Products- Hard Copy $35 Civic Addressing Map (42" x 55") $28 Subdivision Phase Map (34" x 42") $28 Land Use Map (34" x 42") $28 Map Book Digital Data (Imagery, GIS or CAD Lavers) $800 Orthophoto- City Extent $25 Orthophoto- Per!4 Section $25 GIS and CAD Layers - Per % Section $85 Digital Data Processing Fee per Hour - Please contact us for more information on available GIS and CAD Data Custom GIS Analysis/Map Requests Custom Mapping & GIS Analysis Per Hour [ $85 RCMP & Community Safety Fees RCMP Fees Criminal Records Check $40 Criminal Record Checks - Volunteer with letter Free Criminal Record Checks - Students with letter Free Adoptive, Foster, Guardianship Families (per family) $50.00 Family Rate Fingerprinting who have already paid for a Criminal record Check and require prints for Vulnerable Sector Check $10 (for employment) Fingerprinting - Non-Residents (outside jurisdiction) $50 Insurance Letters and Criminal Reports - Basic $40 (each) Fire Services Fees File Search $100 plus Copy Charges Fire Safety Plan Review $150 Emergency Response Plan Review $150 Free $200 Initial Fire Inspection Second Fire Inspection, if required Third or more Fire Inspections $500 Free $200 Initial Occupancy Fire Inspection Second Occupancy Fire Inspection, if required Third or more Fire Inspections $500 $100 Special Event Permit Fire Inspection $100 Copies of Provincial Fire Report NOTE: The cost for the re-issuance of documents will be equal to the original fee charged. Business License Fee After Oct 1 Annual (Jan 1- Dec 31) After July 1 License Type $75 $150 $300 Non-Chestermere Business $40 $150 $75 Commercial Premise Major Home Business Minor Home Business $25 $100 $50 $15 $50 $25 Other License Types 1 Day 3 Consecutive Days 7 Consecutive Days 30 Consecutive Days Seasonal 4-month License (Consecutive) Change of Business Type, ownership or name Appeal or Refusal, Revocation, or Suspension $50 $70 $90 $120 $150 $50 $50 Finance Service Fee $30 Tax Certificate $30 Tax recovery filing notification As per Bylaw 019-10 Assessment Fee $30 N.S.F. Charge Interest Charged on Outstanding Invoices (per month) 2% Administration Charge for goods or services (per invoice) Plus GST 10% Environmental Services Fees Monthly rates must be a minimum of a full calendar year. Replacement residential recycle collection cart (360L) $96.00 Replacement residential compost or garbage collection cart (240L) $82.00 Replacement residential recycle, compost or garbage collection cart (120L) $56.00 Additional kitchen catcher $6.00 Excess collection cart monthly fee (Lake weeds carts excluded- no charge) $8.00 Delivery charge $10 per request Eco centre monthly fee $5.00 Base rate (monthly) $24.00 per dwelling unit Parks Department Fees Monthly rates must be a minimum of a full calendar year. Application to plant a tree on Municipal Property $75 Memorial bench/Honorary bench (delivery and installation only maintenance fees are not included) $2000 Birth place forest for children born to residential family $50 Birth place forest for children born to non- residents. $85 Dog Permits Annual fee for spayed and neutered dogs $35 Annual fee for intact dogs $55 Freedom of Information and Protection of Privacy (FOIP) requests Note: Alberta's FOIP legislation and regulations set out the services that a public body may charge when processing a request for access and the maximum fees that may be charged for each service. The City of Chestermere's fee schedule is in accordance with Schedule 2 of the FOIP Regulation. FOIP request fees are set by the Alberta Government- in the event of inconsistency, the fees under the FOIP Regulation shall prevail. Request for access to a record other than the applicant's own personal information $25 for a one-time request $50 for a continuing request Continuing request for access to a record other than the applicant's own personal information $10 Request for an applicant's own personal information is free, however the City may assess fees only for producing a copy of the record- only if the costs are estimated to exceed $10 When estimated fees exceed $150 for a general request The full amount is charged to the applicant When estimated fees exceed $10 for a personal information request The full amount is charged to the applicant Searching for, locating and retrieving records $6.75 per % hour Computer processing and related charges Actual cost to the City of Chestermere Actual cost to the City of Chestermere up to $20.00 per 14 hour Computer programming Black and white up to 8 14" x 14" - $0.25 per page Other formats $0.50 per page Producing a paper copy of the record (photocopies and computer printouts) Actual cost to the City of Chestermere Producing a paper copy of a record (from plans and blueprints) Actual cost to the City of Chestermere Producing a copy of a record by duplication of audio and video tapes Producing a photographic copy (colour or black and white) printed on photographic paper from a negative, slide or digital image 1. 4"x6" $3.00 2. 5"x7" $6.00 3. 8"x10" $10.00 4. 11"x14" $20.00 5. 16''x20" $30.00 Actual cost to the City of Chestermere Producing a copy of a record by any process or in any medium or format not listed above $6.75 per % hour Preparing and handling a record for disclosure Actual cost to the City of Chestermere Shipping records to the applicant $6.75 per 14 hour Supervising examination of records by an applicant Recreation Visitor Daily Rate Monday - Friday Boat Launch Fees $35 Motorized $25 Personalize watercraft $10 Open bow boat (under 10 horsepower) Non-motorized Free Visitor Daily Rate Weekends and Holidays. Boat Launch Fees $65 Motorized Boat Personal Motorized Watercraft $45 Open bow boat (under 10 horsepower) $10 Non-motorized Watercraft Free Resident Season Pass $25.00 Sports Field Rental Local Rate $10.00/Hour $20.00/Hour Non-Local Rate Events All events require a non-refundable Booking Fee of $25.00 plus GST prior to the event. Also, depending on the size and scope of the event, a $500 damage deposit may also be required by organizers. This applies to any event with the potential of park, road, venue or environmental damage or significant levels of maintenance. The damage assessment is based on a review of the site by City staff immediately before and after the event. All fee's must be paid 7 business days prior to the event. Max # of Participants Under 1 hr 1-2 2-3 4-5 5-6 7-8 8+ Parks hrs hrs hrs hrs hrs hrs John Peake Park (Includes pavilion) Sunset Beach $100 $150 1000+ $250 $350 $500 $700 $1,500 200 $100 $150 $250 $350 $500 $700 $1,500 Cove Beach $100 50 $150 $250 $350 $500 $700 $1,500 Rainbow Falls $100 100 $150 $250 $350 $500 $700 $1,500 John Peake Pavilion Only Sunset Beach Volleyball Courts FLAT FEE- 100 $25 $50 $75 $150 $100 $200 $400 $50 20 $25 N/A N/A N/A N/A N/A $25 (per court per hour) Maximum 2- hour rental * For events with more than 1000 people, please contact the events department directly. * Non residents must pay an additional $25 per hour fee Non-Profit/Charitable Organizations may receive a 50% discount on park rentals, conditions may apply. Non-Profit/Charitable Organizations wishing to have their fees waived must: 1. Provide their charitable donation number. 2. Provide proof that they are a registered non-profit organization; and 3. Ensure that their event is open to the public. EQUIPMENT AND PERSONNEL CHARGE OUT RATES (Plus GST) Equipment and personnel charge outs shall have a two (2) hour minimum applied. Any charge outs of equipment and personnel over the two (2) hour minimum shall be rounded up to the nearest half hour. TRUCKS & TRANSPORTING EQUIPMENT Unit # Rate Per PK046, Pk257 PK279 $32 Crew Cab 1 Ton Truck hour $24 Half Ton - 3/4 Ton Truck hour $27 Half Ton - 3/4 Truck - 4-wheel drive hour PK176, PK180, PK236, PK324 PK334 $95 1 Ton Single Axle Dump Truck hour PW028.PW184 PW165 $120 Tandem Axle Dump Truck hour $176 hour 1 Ton Truck with Plow and Sander - single axle PW134 $18 Slide in Sander PW138 hour PW128 PW167 PW028, PW165, PW126, PW184 $191 Tandem Axle Truck with Sander and Plow hour PK347, PW157 PK248 $131 International 7300 Truck Roll Off Truck hour $127 Water Tank Truck 3001- 3600 imperial gallons PK262 hour $104 Remote Mower PK238 hour $95 Rough Cut Mower PK335 hour $94 Tractor w/Mower PK121 hour Add $10/hr to tractor rate above $104 hour Rear Boom Flail Mower A I .I #t» x4 4 /1 - MUU q> 1 -4/111 LU tractor rate above $108 Rock Picker hour $94 Riding Mower hour $27 Side by Side hour $223 Tractor w/Trailer PW108, PW146 hour $9 Utility Trailer hour COMPACTION EQUIPMENT $122 Packer - Single Drum- 3307p PW064 hour Sakai Pneumatic Roller - TW320-1 $68 PW076 hour LOADERS John Deere Loader 624K $142 PW137 hour John Deere Loader 204L $90 PK336 hour John Deere Loader 624P $149 PW198 hour $112 Bobcat Skid Steer PW152, PK292 hour $95 Cat 242 Skid Steer PK007 hour $108 John Deere Skid Steer CT332 PK087 hour $104 Backhoe 310SG PW005 hour John Deere Hydraulic Excavator 220D $181 PW109 hour $85$68 Compact Excavator - Bobcat 324 PK183 hour Wheel Loader - Wacker Neuson WL30 $98 PK181 hour PK092, PK280, PK301, PW158 $95 Trackless hour PW042, PW197 PW169 $206 Sweeper (High Dump) hour MOTOR GRADERS $183 Cat Grader - 140M PW106 hour John Deere Grader 770GP $183 PW136 hour VACUUM, HYDRO EXCAVATION TRUCKS $160 Bucket Truck /w 2 Operators PK091 hour $273 Vac Truck PW065 hour Timber Salvage & Land Clearing Equipment Tree Chipper 12 "with 1 operator $132 PK232, PK343 hour NOTE: 2 Operators are required M1SCELLANOUS EQUIPMENT Unit # Rate Per $388 Air Compressor 375 CFM day PW057 $68 day Arc Welder $49 Gas Drive Self Priming Pump - 2" day $61 Gas Drive Self Priming Pump - 3" day $49 Generator - 3000 Watt day PK114 $40 Generator - 2500 Watt day $333 Light Tower 8 kw day PW066 $8 hour Post Pounder $55 Pressure Washer/Steamer hour $8 Push Lawn Mower PK011 hour $25 Roll off Bin day $100 EZ Screen Screener 1200 XL PK188 hour $100 Shop Rate hour $127 hour Signs - Labour per Sign $200 each Signs - Hardware per Sign PW129, PW133, PW151, PW178, PW193, PW194, PW195 $165 day Solar Message Board $8 Weed Sprayer hour $7 Weed Whip hour $20 bag Ice Melt Unit # Rate Per Lasers. Level. Locators & Camera $100 Digital Pushrod Inspection Camera PW-071 day $70 Pipe & Cable Locator Multi Frequency PK-260 day $30 day Construction Laser $15 Construction Auto Level day Public Works Personnel Rate Per $49.21 Labourer hour $71.81 Equipment Operator hour $84.27 Coordinator hour $yu.25 Manager hour Technical Personnel Rate Per $150 Prof. hour $200 Senior Prof. $140 Senior Technologist hour $115 Technologist hour $150 Project Manager hour $120 Project Coordinator hour Mayor Director Previous Signatures: February 2nd, 2023 Date February 2nd, 2023 --lEAv'ti FUXTKL Date Director Director Director Previous approvals: Adopted by Council; Resolution No. h\> MAYOR s.on. ocwin 05A-17 CAO Revisions with LUB 020-24 Date Mayor: Date CAO: Date Director: Date Director: Date Director: Adopted by Council; Resolution No.