Building permits — Millet, Alberta

Do I need a building permit? What does it cost?

In the Town of Millet, Alberta, building permit rules are set by 2020 03 Development And Safety Codes Fee Bylaw, verified 2026-09-27. Permit required for: Basement Development. Exemptions: Detached retaining wall. Fines: up to a maximum of $100.00 surcharge per permit.

2020 03 Development And Safety Codes Fee Bylaw adopted bylaw
permit required for Basement Development Building Permit also required for Basement Development
exemptions Detached retaining wall Detached retaining wall, no building permit required
fee basis Residential: $0.50 per sq. ft main level, $0.39 per sq. ft upper/lower floors; Commercial: $6.00 per $1,000 construction value up to $1,000,000, then $6,000 plus $4.50 per $1,000 over $1,000,000; minimum commercial $300. Schedule B
fine range up to a maximum of $100.00 surcharge per permit doubled up to a maximum of $100.00 surcharge per permit
scout note

Establishes fees for development permits and safety codes inspections in the Town of Millet.

Machine-readable: building-permits.json · Official website: http://www.millet.ca · Last verified 2026-09-27 · Building permits across Alberta · Building permits in other municipalities