| permit required for | Building permit fees for single family residential; multi-family, commercial, industrial, institutional; decks; solid fuel appliances; solar panels; shipping containers; prefab sheds; swimming pools/hot tubs/DIY sheds; accessory buildings; additions; renovations. | Building Permit Fees - Single Family Residential; Flat Rate Permits; Building Permit Fees - Multi-Family, Commercial, Industrial, Institutional |
| fee basis | Single family: Agency max of (estimated construction cost * 0.006) or minimum; Town max of (estimated construction cost * 0.0014) or minimum; SCC max of ((Agency + Town) * 0.04) or minimum. Multi-family/commercial/industrial/institutional: Town max of (estimated construction cost * 0.00195) or minimum. Minimum totals $228.80 and $332.80. | Building Permit Fees - Single Family Residential; Building Permit Fees - Multi-Family, Commercial, Industrial, Institutional |
| fine range | Double Permit Fees | WORK STARTED BEFORE PERMIT ISSUANCE SUBJECT TO DOUBLE PERMIT FEES |
scout note
Same bylaw recorded under building_permits: its Safety Codes Permit Fees schedule sets building/electrical/gas/plumbing/private-sewage permit fees; permits are applied for at the Town Office (self-administered, not a private agency).