Building Permit Fee Schedule (County of Thorhild)

Thorhild County, Alberta · summary & facts

This is the exact embedded text of the captured official document. Snapshot a57c414cdb2c · verified 2026-09-27 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

COUNTY OF THORHILD Building Permit Fee Schedule Residential Installations Description New Construction (Single Family Dwelling, Duplex) Relocation of a Building (on crawlspace or basement) Garage, Shop, Sheds, Addition, Renovation, Basement Development Manufactured / Mobile Home (on blocking or piles) Solar Panels Mounted on Roof (not required for ground mounted panels) Decks, Solid Fuel Burning Appliances, Hot Tubs, Demolition Permit Fee - not including SCO levy* $0.40/sq. ft. main floor $0.30/sq. ft. additional storeys $0.20/sq. ft. for developed basement (if developing at time of construction) $0.30 per square foot of main floor $150.00 minimum permit fee $p^persqyare_foot $150.00 minimum permit fee $150.00 $150.00 $150.00 Commercial, Industrial, Institutional, Oil & Gas New, Renovation, Addition Change of Occupancy (no structural changes) Demolition $5.50 per $1000 of Project Value ** $300.00 minimum permit fee $150.00 $150.00 **NOTE: Project Value is based on the actual cost of material and labour Verification of cost may be requested prior to permit issuance. * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Electrical Permit Fee Schedule Residential Installations Single Family Dwellings, Additions Square Footage Up to 1200 1201-1500 1501-2000 2001-2500 2501 - 3500 Over 3500 Permit Fee $130.00 $150.00 $170,00 $190.00 $250.00 SCC Levy $5.20 $6.00 $6.80 $7.60 $10.00 Total Fee $135.20 $156.00 $176.80 $197.60 $260.00 $250.00 plus $0.10 per square foot Homeowner Permits - add $50.00 Other than New Single Family Residential (basement development, garage, renovation, minor work) Installation Cost $0 -$500 $501 -$1000 $1001 -$2000 $2001 - $3000 $3001 - $4000 $4001 - $5000 Permit Fee $100.00 $130.00 $150.00 $160.00 $170.00 $180.00 SCO Levy $4.50 $5.20 $6.00 $6.40 $6.80 $7.20 Total Fee $104.50 $135.20 $156.00 $166.40 $176.80 $187.20 Homeowner Permits - add $50.00 (for installations greater than $500) Installation costs greater than $5000 use the square footage fee schedule above Description Permanent Service Connection Only Temporary Power/Underground Service Permit Fee $85.00 $85.00 SCC Levy $4.50 $4.50 Total Fee $89.50 $89.50 * SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Electrical Permit Fee Schedule Commercial, Industrial, Institutional (Contractors Only) Farm Buildings (Owners & Contractors) Installation Cost 3-1,000.00 1,001-1,500.00 1,500.01 -2,000.00 ?,000.01 - 2,500.00 ?,500.01 - 3,000.00 3,000.01 - 3,500.00 5,500.01-4,000.00 t,000.01 - 4,500.00 1,500.01 - 5,000.00 5,000.01 - 5,500.00 5,500.01 - 6,000.00 3,000.01 - 6,500.00 3,500.01-7,000.00 i',000.01 - 7,500.00 7,500.01 - 8,000.00 3,000.01 - 8,500.00 3,500.01-9,000.00 9,000.01 - 9,500.00 3,500.01 -10,000.00 10,000.01 -11,000.00 11,000.01 -12,000.00 12,000.01-13,000.00 13,000.01 -14,000.00 14,000.01 -15,000.00 15,000.01 -16,000.00 16,000.01 -17,000.00 17,000.01-18,000.00 18,000.01 -19,000.00 19,000.01 -20,000.00 20,000.01 -21,000.00 21,000.01 -22,000.00 22,000.01 - 23,000.00 23,000.01 - 24,000.00 24,000.01-25,000.00 25,000.01 - 26,000.00 26,000.01 -27,000.00 27,000.01 - 28,000.00 28,000.01 - 29,000.00 29,000.01 - 30,000.00 30,000.01 -31,000.00 31,000.01 -32,000.00 32,000.01 - 33,000.00 33,000.01 - 34,000.00 34,000.01 - 35,000.00 35,000.01 - 36,000.00 36,000.01 - 37,000.00 37,000.01 - 38,000.00 Permit Fee $75.00 $80.00 $85.00 $90.00 $95.00 $100.00 $105.00 $110.00 $115.00 $120.00 $125.00 $130.00 $135.00 $140.00 $145.00 $150.00 $155.00 $160.00 $165.00 $170.00 $175.00 $180.00 $185.00 $190.00 $195.00 $200.00 $205.00 $210.00 $215.00 $220.00 $225.00 $230.00 $235.00 $240.00 $245.00 $250.00 $255.00 $260.00 $265.00 $270.00 $275.00 $280.00 $285.00 $290.00 $295.00 $300.00 $305.00 3CC Levy $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.60 $4.80 $5.00 $5.20 $5.40 $5.60 $5,80 $6.00 $6.20 $6.40 $6.60 $6.80 $7.00 $7.20 $7.40 $7.60 $7.80 $8.00 $8.20 $8.40 $8.60 $8.80 $9.00 $9.20 $9.40 $9.60 $9.80 $10.00 $10.20 $10.40 $10.60 $10.80 $11.00 $11.20 $11.40 $11.60 $11.80 $12.00 $12.20 Total Fee $79.50 $84.50 $89.50 $94.50 $99.50 $104.50 $109.50 $114.50 $119.60 $124.80 $130.00 $135.20 $140.40 $145.60 $150.80 $156.00 $161.20 $166.40 $171.60 $176.80 $182.00 $187.20 $192.40 $197.60 $202.80 $208.00 $213.20 $218.40 $223.60 $228.80 $234.00 $239.20 $244.40 $249.60 $254.80 $260.00 $265.20 $270.40 $275.60 $280.80 $286.00 $291.20 $296.40 $301.60 $306.80 $312.00 $317.20 Installation Cost 38,000.01 - 39,000.00 39,000.01 - 40,000.00 40,000.01 -41,000.00 41,000.01 -42,000.00 42,000.01 -43,000.00 43,000.01 - 44,000.00 44,000.01 -45,000.00 45,000.01 - 46,000.00 46,000.01 - 47,000.00 47,000.01 - 48,000.00 48,000.01 -49,000.00 49,000.01 - 50,000.00 50,000.01 - 60,000.00 60,000.01 - 70,000.00 70,000.01 - 80,000.00 80,000.01 - 90,000.00 90,000.01 -100,000.00 100,000.01 -110,000.00 110,000.01 -120,000.00 120,000.01 -130,000.00 130,000.01 -140,000.00 140,000.01 -150,000.00 150,000.01 -160,000.00 160,000.01 -170,000.00 170,000.01 -180,000.00 180,000.01 -190,000.00 190,000.01 -200,000.00 200,000.01 -210,000.00 210,000.01 -220,000.00 220,000.01 - 230,000.00 230,000.01 - 240,000.00 240,000.01 - 250,000.00 250,000.01 - 300,000.00 300,000.01 - 350,000.00 350,000.01 - 400,000.00 400,000.01 -450,000.00 450,000.01 - 500,000.00 500,000.01 - 550,000.00 550,000.01 - 600,000.00 600,000.01 -650,000.00 650,000.01 - 700,000.00 700,000.01 - 750,000.00 750,000.01 - 800,000.00 800,000.01 - 850,000.00 850,000.01 - 900,000.00 900,000.01 - 950,000.00 950,000.01 -1,000,000.00 Permit Fee $310.00 $320.00 $330.00 $340.00 $350.00 $360.00 $370.00 $380.00 $390.00 $400.00 $410.00 $420.00 $430.00 $440.00 $465.00 $590.00 $630.00 $655.00 $680.00 $705.00 $730.00 $755.00 $780.00 $805.00 $830.00 $855.00 $880.00 $905.00 $955.00 $1,005.00 $1,055.00 $1,105.00 $1,155.00 $1,205.00 $1,280.00 $1,355.00 $1,470.00 $1,545.00 $1,620.00 $1,720.00 $2,070.00 $2,170.00 $2,270.00 $2,370.00 $2,520.00 $2,670.00 $2,820.00 3CC Levy $12.40 $12.80 $13.20 $13.60 $14.00 $14.40 $14.80 $15.20 $15.60 $16.00 $16.40 $16.80 $17.20 $17.60 $18.60 $23.60 $25.20 $26.20 $27.20 $28.20 $29.20 $30.20 $31.20 $32.20 $33.20 $34.20 $35.20 $36.20 $38.20 $40.20 $42.20 $44.20 $46.20 $48.20 $51.20 $54.20 $58.80 $61.80 $64.80 $68.80 $82.80 $86.80 $90.80 $94.80 $100.80 $106.80 $112.80 Total Fee $322.40 $332.80 $343.20 $353.60 $364.00 $374.40 $384.80 $395.20 $405.60 $416.00 $426.40 $436.80 $447.20 $457.60 $483.60 $613.60 $655.20 $681.20 $707.20 $733.20 $759.20 $785.20 $811.20 $837.20 $863.20 $889.20 $915.20 $941.20 $993.20 $1,045.20 $1,097.20 $1,149.20 $1,201.20 $1,253.20 $1,331.20 $1,409.20 $1,528.80 $1,606.80 $1,684.80 $1,788.80 $2,152.80 $2,256.80 $2,360.80 $2,464.80 $2,620.80 $2,776.80 $2,932.80 For installations greater than $1 ,000,000.00 please contact Superior Safety Codes for a quote. * SCC Levy /s 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Electrical Permit Fee Schedule Annual Electrical Permits Description Annual Electrical Maintenance Permit Fee $350.00 SCC Levy $14.00 Total Fee $364.00 SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Gas Permit Fee Schedule Residential Installations Number of Outlets 1 2 3 4 5 6 7 8 9 10 Over 10 Permit Fee $75.00 $85.00 $95.00 $105.00 $125,00 $135.00 $150.00 $180.00 $190.00 $200.00 SCO Levy $4.50 $4.50 $4.50 $4.50 $5.00 $5.40 $6.00 $7.20 $7.60 $8.00 Total Fee $79.50 $89.50 $99.50 $109.50 $130.00 $140.40 $156.00 $187.20 $197.60 $208.00 $200.00 plus $10.00 per outlet over 10 Description Propane Tank Set (does not include connection to appliance) Temporary Heat Permit Fee $100.00 $100.00 SCC Levy $4.50 $4.50 Total Fee $104.50 $104.50 SCC Levy /s 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Gas Permit Fee Schedule Non-Residential Installation (including Farm Buildings) BTU Input 0 to 150,000 150,001 to 250,000 250,001 to 350,000 350,001 to 500,000 500,001 to 750,000 750,001 to 1,000,000 Over 1,000,000 Permit Fee $75.00 $100.00 $130.00 $175.00 $200.00 $225.00 SCC Levy $4.50 $4.50 $5.20 $7.00 $8.00 $9.00 Total Fee $79.50 $104.50 $135.20 $182.00 $208.00 $234.00 $275.00 plus $5.00 per 100,000 (or portion of) over 1,000,000 BTU Propane Tank Sets (does not include connection to appliance) Description Propane Tank Sets Permit Fee $100.00 SCC Levy $4.50 Total Fee $104.50 Add $50.00 for each additional tank set Propane Cylinder Refill Centre Grain Dryers $175.00 $250.00 $7.00 $10.00 $182.00 $260.00 Temporary Heat BTU's 0 to 500,000 5000,001 to 1,000,000 Over 1,000,000 Permit Fee $85.00 $125.00 SCO Levy $4.50 $5.00 Total Fee $89.50 $130.00 $125.00 plus $10.00 per 100,000 BTU (or portion of) over 1,000,000 BTU ; SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Plumbing Permit Fee Schedule Residential & Non-Residential Installations Number of Fixtures 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Over 20 Permit Fee $75.00 $85.00 $95.00 $100.00 $105.00 $110.00 $115.00 $120.00 $125.00 $130.00 $135.00 $140.00 $145.00 $150.00 $155.00 $160.00 $165.00 $170.00 $175.00 $180.00 SCC Levy $4.50 $4.50 $4,50 $4.50 $4.50 $4.50 $4.60 $4.80 $5.00 $5.20 $5.40 $5.60 $5.80 $6.00 $6.20 $6.40 $6.60 $6.80 $7.00 $7.20 Total Fee $79.50 $89.50 $99.50 $104.50 $109.50 $114.50 $119.60 $124.80 $130.00 $135.20 $140.40 $145.60 $150.80 $156.00 $161.20 $166.40 $171.60 $176.80 $182.00 $187.20 $200.00 plus $5.00 per fixture over 20 Homeowner Permits - add $50.00 for greater than 5 fixtures SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Private Sewage Permit Fee Schedule Description Holding Tank Septic Fields, Open Discharge, Mounds, Lagoons Any system with Treatment Plant Permit Fee $150.00 $250.00 $300.00 SCC Levy $6.00 $10.00 $12.00 Total Fee $156.00 $260.00 $312.00 ' SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Plumbing Permit Fee Schedule Residential & Non-Residential Installations Number of Fixtures 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Over 20 Permit Fee $75.00 $85.00 $95.00 $100.00 $105.00 $110.00 $115.00 $120.00 $125.00 $130.00 $135.00 $140.00 $145.00 $150.00 $155.00 $160.00 $165.00 $170.00 $175.00 $180.00 SCO Levy $4.50 $4.50 $4.50 $4.50 $4.50 $4.50 $4.60 $4.80 $5.00 $5.20 $5.40 $5.60 $5.80 $6.00 $6.20 $6.40 $6.60 $6.80 $7.00 $7.20 Total Fee $79.50 $89.50 $99.50 $104.50 $109,50 $114.50 $119.60 $124.80 $130.00 $135.20 $140.40 $145.60 $150.80 $156.00 $161.20 $166.40 $171.60 $176.80 $182.00 $187.20 $200.00 plus $5.00 per fixture over 20 Homeowner Permits - add $50.00 for greater than 5 fixtures SCC Levy is 4% of the permit fee with a minimum of $4.50 and a maximum of $560 COUNTY OF THORHILD Private Sewage Permit Fee Schedule Description Holding Tank Septic Fields, Open Discharge, Mounds, Lagoons Any system with Treatment Plant Permit Fee $150.00 $250.00 $300.00 SCC Levy $6.00 $10.00 $12.00 Total Fee $156.00 $260.00 $312.00 ' SCC Levy /s 4% of the permit fee with a minimum of $4.50 and a maximum of $560