Building permits — 100 Mile House, British Columbia

Do I need a building permit? What does it cost?

In the District Municipality of 100 Mile House, British Columbia, building permit rules are set by Building Bylaw No. 695, 1996 (Consolidated, incl. amendments to Bylaw No. 1403, 2023), verified 2026-09-24. Permit required for: Construction of any building or structure or part of a building or structure. Exemptions: Storage buildings <=10m2, temporary trailers, buildings <$4000 or <=15m2, minor repairs up to $4000, re-roofing, decks <=600mm high, plumbing repairs. Permit fees: based on the value of the building.

Building Bylaw No. 695, 1996 (Consolidated, incl. amendments to Bylaw No. 1403, 2023) adopted bylaw
permit required for Construction of any building or structure or part of a building or structure. s. 2.2
exemptions Storage buildings <=10m2, temporary trailers, buildings <$4000 or <=15m2, minor repairs up to $4000, re-roofing, decks <=600mm high, plumbing repairs. s. 5.1.2
fee basis based on the value of the building s. 5.2
fees location District of 100 Mile House Fees and Charges Bylaw s. 5.3(f)
authority Building Inspector s. 3.1
fine range not more than TWO THOUSAND ($2,000.00) DOLLARS s. 12.2
scout note

Requires a Building Inspector-issued permit before constructing, altering, repairing, moving or demolishing any building or structure; exempts small accessory buildings, low farm buildings and low decks. Part 5 sets a plan-processing fee and a building permit fee for the permit.

Bylaws index — District of 100 Mile House

Municipal bylaws landing page listing the most-requested bylaws including the Building Bylaw, Zoning Bylaw, and Fees and Charges Bylaw, each with a PDF link.

Machine-readable: building-permits.json · Official website: https://www.100milehouse.com/ · Last verified 2026-09-24 · Building permits across British Columbia · Building permits in other municipalities