Village of Lumby's building bylaw, adopted October 21, 2019, consolidated with amendments (839/2020, 863/2021, 882/2023, 889/2023). Requires a permit before regulated construction; sets BC Energy Step Code requirements; permit fees are set in the bylaw's own Schedule A (Fees and Charges).
Building permits — Lumby, British Columbia
Do I need a building permit? What does it cost?
The Village of Lumby, British Columbia has 1 adopted bylaw on file: Building Bylaw No. 834, 2019 (Consolidated to November 2023), verified 2026-09-24.
Village of Lumby's civicweb document library listing all current bylaws, including the Building Bylaw.