Building permits — New Denver, British Columbia

Do I need a building permit? What does it cost?

In the Village of New Denver, British Columbia, building permit rules are set by Building Bylaw (Consolidated), verified 2026-08-28. Exemptions: Buildings <9.33m2, retaining walls <1.5m, decks <600mm high, existing chimneys, plumbing repairs without piping changes, seasonal greenhouses <28m2. Permit fees: current building permit fees of the Regional District of Central Kootenay. Administered by: Building Official.

Building Bylaw (Consolidated) adopted bylaw
permit required for Construction, alteration, demolition, removal, relocation, occupancy change of buildings, structures, plumbing systems, pools, manufactured homes, solid fuel appliances. s. 6.1, s. 8.1
exemptions Buildings <9.33m2, retaining walls <1.5m, decks <600mm high, existing chimneys, plumbing repairs without piping changes, seasonal greenhouses <28m2. s. 5.2
fee basis current building permit fees of the Regional District of Central Kootenay Schedule "A"
authority Building Official s. 7.1.1
fine range not less than $100.00 (One Hundred Dollars) and not more than the maximum penalty prescribed by law s. 22.1
scout note

Sets standards for construction, alteration, and demolition of buildings within the Village; requires permits and inspections.

Machine-readable: building-permits.json · Official website: https://newdenver.ca/ · Last verified 2026-08-28 · Building permits across British Columbia · Building permits in other municipalities