| permit required for | Construction, alteration, demolition, relocation, occupancy, change of use of buildings/structures, pools, retaining walls, plumbing, fire sprinklers, fireplaces. | s. 6.1, 9.1, 13.1, 14.2, 14.12, 17.1 |
| exemptions | Fences (except Part 17), accessory buildings under 10 square metres, landscape walls under 1.2 metres, Canadian Standards Association Z240 MH/Z241 series. | s. 5.3 |
| fees location | City of Port Moody Fees Bylaw | s. 12.7(a), 4.1 |
| authority | Building Official | s. 8.2(a), 4.1 |
| fine range | up to $10,000 | s. 20.2 |
scout note
Repeals the 2003 Building and Plumbing Code Administration Bylaw; administers the BC Building Code and regulates construction. A permit is required before construction/alteration; building permit fee is prescribed in the City's separate Fees Bylaw, reduced 2.5% for supervised complex buildings.