{
 "answer": "In the District Municipality of Taylor, British Columbia, building permit rules are set by Building Bylaw 391-1991, verified 2026-08-28. Permit required for: Construction of any building or structure or part thereof, including swimming pools, signs over 3 metres, and building moves. Exemptions: Buildings or structures not exceeding 15 square metres, temporary on-site trailers for valid projects, and repainting exterior or interior surfaces. Permit fees: Schedule B: $25 up to $5,000 value; $5 per $1,000 up to $50,000; $3 per $1,000 over $50,000.",
 "municipality_id": "gx-000140",
 "municipality": "Taylor",
 "status_type": "District Municipality",
 "jurisdiction": "British Columbia",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-08-28",
 "official_website": "http://www.districtoftaylor.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw 391-1991",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://districtoftaylor.com/wp-content/uploads/2023/05/391-1991-District-of-Taylor-Building-Bylaw.pdf",
   "summary": "Taylor Building Bylaw 391 (1991) regulating building construction, permits, and standards within the district.",
   "capture_sha256": "934aab7a5c57f3a56b625017c0aff37a80fbbc1d86ddcb6db2dc254c28968fed",
   "captured_at": "2026-06-08T05:38:58+00:00",
   "capture_http_status": 200,
   "document_number": "391-1991",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/934aab7a5c57f3a56b625017c0aff37a80fbbc1d86ddcb6db2dc254c28968fed.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction of any building or structure or part thereof, including swimming pools, signs over 3 metres, and building moves.",
    "exemptions": "Buildings or structures not exceeding 15 square metres, temporary on-site trailers for valid projects, and repainting exterior or interior surfaces.",
    "fee_basis": "Schedule B: $25 up to $5,000 value; $5 per $1,000 up to $50,000; $3 per $1,000 over $50,000.",
    "authority": "Building Inspector",
    "fine_range": "Not more than $2,000.00 in addition to the costs of the prosecution."
   },
   "fact_citations": {
    "permit_required_for": "s. 2.2, s. 5.1.2, s. 10.1(a)",
    "exemptions": "s. 5.1.2(a)(b), s. 1.3",
    "fee_basis": "Schedule B",
    "authority": "s. 3.1",
    "fine_range": "s. 11.2"
   },
   "transcript_url": "/ca/bc/taylor/building-permits/bylaw-391-1991/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/bc/taylor/building-permits/"
}