| permit required for | constructing, repairing or altering a building or structure, including a pool or retaining wall; plumbing; moving; demolishing; fireplaces; changing use or occupancy | s. 7.1 |
| exemptions | fence; accessory building under 10 m2; trellis, arbour, retaining wall under 1.2 m; CSA Z240/Z241; non-structural repair/maintenance on single-family parcels | s. 3.3 |
| fees location | current City of Vernon Fees and Charges Bylaw | s. 10.7(a) |
| authority | Building Official | s. 6.2(a) |
| fine range | fine of not more than $10,000.00, or a term of imprisonment not exceeding three months, or both | s. 17.1 |
scout note
City of Vernon's building bylaw, consolidated with 2 amendments: Bylaw 5966 (Sep 11, 2023, solar-ready construction) and Bylaw 5993 (Apr 22, 2024, zero-carbon step code). 49 pages, native text PDF.