| fee basis | $0-$1,000: Minimum $100; $1,001-$100,000: $100 for first $1,000 plus 1.25% of next $99,000; $100,001-$500,000: $1,338 for first $100,000 plus 1% of next $400,000; Over $500,000: $5,338 plus 0.75% over $500,000; Application fee 25% of total permit fee, minimum $100. | Schedule "A", Building |
| authority | Inspector | Schedule "B", 1.c |
| fine range | Stop work notice $1000; work without permit 2 times permit fee to a maximum of $25,000, minimum $1000; Building Permit Fee is doubled for construction commenced before permit. | Schedule "A", Building, Penalties; Schedule "B", 2.a |