| permit required for | Building permit before constructing, repairing or altering a building or structure; permit required whenever work regulated under this bylaw is undertaken. | s. 8(1)(a); s. 4(1) |
| exemptions | Buildings/structures exempted by Part 1 of Building Code; retaining structures less than 1.5 meters in height. | s. 5(2) |
| fee basis | Separate building permit fee based on value as determined in Schedule "A"; $25 permit fee paid prior to issuance. | s. 8(3); s. 12(1) |
| authority | Building Official (includes Building Inspectors, Plan Checkers, Plumbing Inspectors designated by Council) | s. 2; s. 7(1)(a) |
| fine range | Fine of not more than $10,000.00 or imprisonment for not more than six months; additional $25 charge if Stop Work notice outstanding 30 days. | s. 21(1); s. 21(7) |
scout note
Administers the BC Building Code within Warfield; a permit is required for construction, alteration, or demolition. Permit fees are set in the bylaw's own Schedule A, with partial refund on surrender before work starts.