| permit required for | Erection/construction, addition, extension, improvement, alteration/conversion, repair of buildings/structures; signs; excavation; permanent pools/hot tubs/fish ponds minimum depth 2 feet. | s. 8.1 |
| exemptions | Replacement stucco/siding/shingles; doors/windows same size; fences; patching/painting/decorating; cabinets/shelves; sidewalks; accessory buildings/sheds under 10 square metres; non-structural repairs. | s. 8.4 |
| fees location | Schedule of Fees | s. 7.2 |
| authority | South Central Planning District and Development Officer/Building Inspector (Authority Having Jurisdiction) | s. 2.3 |
| fine range | Fine not exceeding $5,000.00; imprisonment not exceeding six months, or both. | s. 24.1 |
scout note
Municipality of Lorne's own Building Bylaw adopting the Manitoba Building Code under The Buildings and Mobile Homes Act. Building permit required for construction, alteration, demolition, relocation and plumbing work; South Central Planning District (SCPD) is the named authority having jurisdiction; max fine $5,000; repeals prior Lorne/Notre Dame de Lourdes/Somerset building bylaws.