| permit required for | Work regulated by this By-law, the Code and the Zoning By-Law, including construction, alteration, repair, relocation, excavation, mechanical systems, signs, and drainage. | s. 17.1; s. 17.2 |
| exemptions | Patching, painting, decorating; replacement of same stucco/siding/roofing/floor coverings; fences; cabinets; detached accessory buildings not greater than 120 square feet (11.15 m2); temporary tents less than 901 square feet; certain single-family/duplex/triplex work. | s. 17.3; s. 17.4 |
| fees location | approved Fee By-law | s. 26.1 |
| authority | Authority Having Jurisdiction; Designated Officer; inspections department. | s. 8.1; s. 17.2; s. 16.17 |
scout note
RM's own Building By-law 2025-07 governs building permit requirements, applications, drawings/specifications, site inspections, occupancy and safety, permit issuance/refusal/revocation, and enforcement within East St. Paul.