| permit required for | Building Permit (residential and commercial); plumbing permit; demolition; outdoor inground pool; agricultural buildings; mobile homes; solid fuel appliances; occupancy permit. | Schedule "D", Building Inspection, 1, 2, 3 |
| exemptions | Other Signs Permit not required; Under $5000 Value No Permit unless Structural. | Schedule "D", Building Inspection, 2.D, 2.F |
| fee basis | $4.724 per $1,000 of construction cost, $125 minimum; commercial $7.227 per $1,000 over $10,000. | Schedule "D", Building Inspection, 1.A-B, 1.C.10 |
| fees location | current Fees and Charges By-law and amendments thereto | s. 7 |
| authority | The authority having jurisdiction; Inspector | s. 8 (5.5.10); Schedule "D", 7 |
| fine range | General: $50 first, $100 second, $150 third, additional $50 up to $500 max per incident; building inspection: $500 per missed inspection, $2,500 occupancy before final inspection, double permit fee if no permit. | s. 1; Schedule "D", 8 |
scout note
Same fees by-law recorded again under building_permits: Schedule D sets the RM's building permit fee schedule (residential/commercial construction-cost rates, pools, signs, agricultural buildings, mobile homes, occupancy permits).