{
 "answer": "In the Rural Municipality of Mossey River, Manitoba, building permit rules are set by By-law No. 2-2022, Minimum Standards Building By-law (cited as the Mossey River Municipality Building By-law), verified 2026-09-24. Fees set in: MLA Planning Region / current MLA Fee Schedule. Administered by: Mossey River Municipality; building inspector, designated officer or other appointed authority. Fines: not exceeding $5,000.00; Schedule A: double fees for permit after work commenced; $100.00 for development permit after commencement.",
 "municipality_id": "gx-001343",
 "municipality": "Rural Municipality of Mossey River",
 "status_type": "Rural Municipality",
 "jurisdiction": "Manitoba",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "http://www.mosseyrivermunicipality.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law No. 2-2022, Minimum Standards Building By-law (cited as the Mossey River Municipality Building By-law)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "document_url": "https://mosseyrivermunicipality.com/uploads/dm/42218/ByLaw022022MinimumStandardsBuildingBylaw_ldXH8i.pdf",
   "summary": "Adopts the Manitoba Building Code across the whole municipality; requires building, plumbing, occupancy and demolition permits; sets owner/constructor/inspector duties, appeal process, offences and a permit-fee schedule (Schedule A).",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "a6c875bade4235aee510e67555a481f541477380514282a2c277b4c6de031b18",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "adopted_date": "2022-03-21",
   "document_number": "2-2022",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a6c875bade4235aee510e67555a481f541477380514282a2c277b4c6de031b18.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "location, placement, erection or construction; addition, extension, improvement, alteration or conversion; underpinning; relocation or removal; mechanical system; special process; plumbing connection; excavation",
    "exemptions": "patching, painting, decorating; replacement of stucco/siding/shingles; doors/windows if opening not altered; open landing/stairs; fences; cabinets/shelves; detached accessory storage building not greater than 13.9 m2; non-structural work less than $15,000",
    "fee_basis": "Part 9 one/two family: 1.25% first $100,000, 0.75% remainder; values by sqft rates (e.g. main floor $45.00/sqft); Part 3/Part 9 commercial: 1.0% on first 1,000,000, 0.6% remainder, $200 minimum",
    "fees_location": "MLA Planning Region / current MLA Fee Schedule",
    "authority": "Mossey River Municipality; building inspector, designated officer or other appointed authority",
    "fine_range": "not exceeding $5,000.00; Schedule A: double fees for permit after work commenced; $100.00 for development permit after commencement"
   },
   "fact_citations": {
    "permit_required_for": "s. 4.2.1.1",
    "exemptions": "s. 4.2.1.2",
    "fee_basis": "Schedule \"A\"",
    "fees_location": "s. 4.1.1(c); Schedule \"A\" note",
    "authority": "s. 2.2.3 \"Authority Having Jurisdiction\"; s. 5.3.1",
    "fine_range": "s. 7.2; Schedule \"A\""
   },
   "transcript_url": "/ca/mb/rural-municipality-of-mossey-river/building-permits/bylaw-2-2022/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/mb/rural-municipality-of-mossey-river/building-permits/"
}