| permit required for | A permit is required whenever work regulated by this By-law, the Code and the Zoning By-Law is to be undertaken. | s. 17.1 |
| exemptions | Patching, painting, decorating; same-material stucco/siding/roofing/floor replacement; fences; cabinets/shelves; detached accessory buildings <=120 sq ft; temporary tents <901 sq ft; certain single-family/duplex/triplex work. | s. 17.3; s. 17.4 |
| fees location | approved Fee By-law | s. 26.1 |
| authority | Authority Having Jurisdiction | s. 8.1 |
scout note
RM of St. Andrews' own Building By-law (2025), administered through Red River Planning District/Cloudpermit: sets permit requirements, duties of owner/contractor/design professional, inspections, occupancy, appeals and permit issuance provisions.