{
 "answer": "In the Town of Swan River, Manitoba, building permit rules are set by Building By-Law No. 12/2024, verified 2026-09-24. Fees set in: current Town of Swan River Fee Schedule. Administered by: Town of Swan River and, where the context requires, such building inspector, fire inspector, or other authority lawfully appointed by the Town of Swan River. Fines: not exceeding $5,000.00; permit not obtained: 10% of permit fees, then remaining 90% totaling twice the original prescribed fee.",
 "municipality_id": "gx-001383",
 "municipality": "Swan River",
 "status_type": "Town",
 "jurisdiction": "Manitoba",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-24",
 "official_website": "http://swanrivermanitoba.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-Law No. 12/2024",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "document_url": "http://swanrivermanitoba.ca/Home/DownloadDocument?docId=c864f039-4d49-400e-b8fa-96b58665638e",
   "summary": "Town of Swan River's Building By-Law 12/2024 requires building/plumbing/development/occupancy/demolition permits, sets a permit fee schedule (Schedule A), exemptions, and duties of owner/constructor/Authority Having Jurisdiction; OCR-confirmed cover and table of contents.",
   "discovered_by": "mb-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "ec21213edddf97a6bc5c96f1cdf474ba97ed57f873e511cb3521d4e812738b77",
   "captured_at": "2026-09-25T02:40:41+00:00",
   "capture_http_status": 200,
   "adopted_date": "2024-07-02",
   "document_number": "12/2024",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/ec21213edddf97a6bc5c96f1cdf474ba97ed57f873e511cb3521d4e812738b77.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "location, placement, erection or construction of any building, structure or portion; addition, extension, improvement, alteration or conversion; repair, rehabilitation or renovation; underpinning; moving; removal; excavation; mechanical system installation; sign alteration",
    "exemptions": "Accessory buildings not greater than 10 square meters; patching, painting or decorating; replacement of shingles; non-structural alterations or repairs under $20,000; fabric buildings smaller than 25 square meters.",
    "fees_location": "current Town of Swan River Fee Schedule",
    "authority": "Town of Swan River and, where the context requires, such building inspector, fire inspector, or other authority lawfully appointed by the Town of Swan River",
    "fine_range": "not exceeding $5,000.00; permit not obtained: 10% of permit fees, then remaining 90% totaling twice the original prescribed fee"
   },
   "fact_citations": {
    "permit_required_for": "s. 4.2.1.1",
    "exemptions": "s. 3.3.1(e); s. 4.2.1.2",
    "fees_location": "Schedule \"A\"",
    "authority": "s. 2.2.3",
    "fine_range": "s. 7.1; s. 4.2.6.2"
   },
   "transcript_url": "/ca/mb/swan-river/building-permits/bylaw-12-2024/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/mb/swan-river/building-permits/"
}