{
 "answer": "In the Town of Aurora, Ontario, building permit rules are set by By-law Number 6096-18 (Building By-law) and 1 other bylaw, verified 2026-09-25. Permit required for: Construction, demolition, change of use, and occupancy of buildings or parts thereof, as set out in Schedule \"A\". Permit fees: Determined in accordance with Schedule \"A\"; additional fees based on scope of work and floor area for class of permit. Administered by: Chief Building Official and inspectors; Registered Code Agencies may perform specified functions.",
 "municipality_id": "gx-001412",
 "municipality": "Aurora",
 "status_type": "Town",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.Aurora.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law Number 6096-18 (Building By-law)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2018-06-25",
   "document_url": "https://media-002-ca.cdn.govstack.com/aurora-010-ca/media/035j53li/6096-18-building-by-law.pdf",
   "summary": "Town of Aurora's Building By-law respecting construction, demolition, change of use, and other building permits under the Building Code Act, 1992; enacted June 25, 2018, since amended.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "3525c9a431457fdd34bb92b79306103cf4eb14bf1a00a37836689c01486e2efe",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "6096-18",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/3525c9a431457fdd34bb92b79306103cf4eb14bf1a00a37836689c01486e2efe.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, demolition, change of use, and occupancy of buildings or parts thereof, as set out in Schedule \"A\".",
    "fee_basis": "Determined in accordance with Schedule \"A\"; additional fees based on scope of work and floor area for class of permit.",
    "authority": "Chief Building Official and inspectors; Registered Code Agencies may perform specified functions.",
    "fine_range": "First conviction: not more than $50,000; subsequent: not more than $100,000. Corporation: $100,000 first, $200,000 subsequent."
   },
   "fact_citations": {
    "permit_required_for": "s. 3.1",
    "fee_basis": "s. 19.1, s. 19.2",
    "authority": "s. 1.1(g), s. 1.1(l), s. 18.1",
    "fine_range": "s. 24.1, s. 24.2"
   },
   "transcript_url": "/ca/on/aurora/building-permits/bylaw-6096-18/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Permit Fee Handout 2026 (Schedule \"G\" to By-law 6737-25, Building Division)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://media-002-ca.cdn.govstack.com/aurora-010-ca/media/qtrlvlvl/permit-fee-handout-2026.pdf",
   "summary": "Town of Aurora's current building permit fee schedule (effective January 1, 2026), e.g. minimum $342 for Part 9 residential permits and per-square-metre rates by occupancy class.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "d03c20f212d6ed6444f6023c78d3588f3385e225a05f04a9c5556f592ba02a5b",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "6737-25",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/d03c20f212d6ed6444f6023c78d3588f3385e225a05f04a9c5556f592ba02a5b.pdf",
   "link_dead": false,
   "transcript_url": "/ca/on/aurora/building-permits/bylaw-6737-25/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/aurora/building-permits/"
}