Building permits — Carling, Ontario

Do I need a building permit? What does it cost?

In the Township of Carling, Ontario, building permit rules are set by Schedule “B” to By-law 2018-01 — Building Fees (2024 CPI-adjusted), verified 2026-09-25. Permit fees: Cost per square foot by class; $13.00 per $1,000.00 construction value; minimum $363.00 plus surcharge. Administered by: Chief Building Official.

Schedule “B” to By-law 2018-01 — Building Fees (2024 CPI-adjusted) adopted bylaw
fee basis Cost per square foot by class; $13.00 per $1,000.00 construction value; minimum $363.00 plus surcharge. s. 1; s. 2; s. 3
authority Chief Building Official s. 6.1; s. 6.2; s. 7.1
scout note

Per-square-foot building permit fees by class of structure (residential habitable space, unfinished basement, accessory buildings, decks, industrial/commercial, farm buildings), a $13/$1,000 construction-value levy, and a $363 minimum fee.

Machine-readable: building-permits.json · Official website: https://carling.ca/ · Last verified 2026-09-25 · Building permits across Ontario · Building permits in other municipalities