This is the exact embedded text of the captured official document.
Snapshot 91aa498283c0 · verified 2026-09-25 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
2026 BUILDING DEVELOPMENT SERVICES FEES
SCHEDULE "A"
New Construction
Description
Unit
Fee
Group A & B-
Assembly and Institutional
Assembly and Institutional
Each
$12.67 per $1000.00 construction
value up to $10,000,000.00
$1.50 per $1000.00 construction value
thereafter
Group C- Residential
Floor area above grade
Per square foot
$0.28
Finished floor area (below grade)
Per square foot
$0.00
Unfinished floor area (below grade)
Per square foot
$0.00
Attached garage
Per square foot
$0.00
Apartment up to 20 Dwelling Units
Each
$12.67 per $1000.00 construction
value (cap of $20,000.00 permit Fee)
Apartment greater than 20 Dwelling Units
Each
$12.67 per $1000.00 construction
value (cap of $50,000.00 permit Fee)
Group D & E-
Office and Mercantile
Office and Mercantile
Each
$12.67 per $1000.00 construction
value up to $10,000,000.00
$1.50 per $1000.00 construction value
thereafter
Group F-Industrial
Industrial
Each
$12.67 per $1000.00 construction
value (cap of $20,000.00 permit fee)
Agricultural
Agricultural Buildings (Livestock
Operations, Farm Produce Storage etc.)
Each
$12.67 per $1000.00 construction
value up to $10,000,000.00
$1.50 per $1000.00 construction value
thereafter
Agricultural Accessory Buildings (Pole
Barns)
Each
$0.28 per sq. ft. or $12.67 per
$1000.00 construction value whichever
is the lessor
Greenhouses
Per square foot
$0.05
Bunkhouse
Per square foot
$0.28
Grain Bins/Silos
Each
$300.00
Pre-Engineered Agricultural Accessory
Buildings (i.e. Coverall Buildings)
Each
$500.00
General Fees
Minimum Permit Fee
Unless noted otherwise
Each
$90.00
Additions or Renovations
All Buildings (unless otherwise specified)
Each
$12.67 per $1000.00 construction
value up to $10,000,000.00
$1.50 per $1000.00 construction value
thereafter
Residential, Agricultural Accessory
Buildings (Pole Barns)
Each
$0.28 per sq. ft. or $12.67 per
$1000.00 construction value whichever
is the lessor
Accessory Structure
Plumbing
Signs
Change of Use
All Buildings (unless otherwise specified)
Each
$12.67 per $1000.00 construction
value
Accessory Structure
Residential
Each
$0.28 per sq. ft. or $12.67 per
$1000.00 construction value whichever
is the lessor
Demolition
All Buildings
Each
$12.67 per $1000.00 construction
value up to $10,000,000.00
$1.50 per $1000.00 construction value
thereafter
On-Site Sewage System
New System
Each
$797.50
2024 BUILDING DEVELOPMENT SERVICES FEES
SCHEDULE "A"
General Fees Continued
On-Site Sewage System
Continued
Replacement Septic Tank or Bed
Each
$401.05
Repair Septic Bed (max 2 runs)
Each
$131.90
New Service Connection
All Buildings (sanitary, water, storm)
Each
$90.00
Conversion from Septic
All Buildings
Each
$279.65
Water Meter Certificate
As per Public Utility Commission
Each
$515.38
Water Meter Certificate for
Meter Pit (Meter Pit not
included in price)
As per Public Utility Commission
Each
$1019.25
Alternative Solution
All Buildings
Each
$210.00
Transfer of Building Permit
All Buildings
Each
$90.00
Fast Track 1-3 Day
Turnaround (if available)
Additional percentage added to building
permit fee
25%
Permit Fee + (25% x Permit Fee) or
$90.00 whichever is greater
Reinspection Fee
All Buildings
Each
$101.80
Revised Submission Fee
All Buildings
Each
5% x Permit Fee (Cap of $500.00) or
$90.00 whichever is greater
Property Standards
Appeal
Appeal from Order
Each
$101.80
Reinspection Fee
All Buildings
Each
$88.10
Fees/Deposits
Deposit due with building
permit application, will be
applied to permit fee. Non-
refundable if permit is
cancelled
New Construction
Commercial, Institutional, Industrial
Each
$500.00
New Construction Residential
Each
$300.00
All other Construction
Each
$90.00
Damage and Final
Inspection. Refundable
provided no damage to
municipal property and/or
on final inspection
Building area greater that 538 square feet
Each
$1000.00
Building area less than 538 square feet
Each
$500.00
Agricultural buildings
Each
$500.00
Tents and pool enclosures, connection
permits
Each
$250.00
Orders on Title
Add or remove Orders associated with
Building Code Act
Each
$80.00
Administrative
Zoning
Phone-in requests
Reports/Work order letters
Each
$33.15
$107.65
Letters
Septic compliance
Property Standard compliance
Each
$107.65
Right of Entry Permit
All properties
Each
$90.00
The following explanatory notes are to be observed in calculation of fees.
Floor area is measured to the outer face of exterior walls and to the centre line of party walls (excluding attached garages.
No deductions are made for openings within the floor area (e.g., stairs, elevators, shafts etc.
The occupancy categories in the Schedule "A" correspond with the major occupancy classifications in the Ontario Building Code. For
mixed occupancy floor areas, the fee for each of the occupancy categories shall be used except where the occupancy category is less
than 10% of the floor area.