This is an automated transcription (OCR) of the captured
official document — minor recognition errors are possible; the source
document governs.
Snapshot e0fdaa84f41e · verified 2026-09-25 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
## OVERVIEW:
The Ontario Building Code is a regulation made under the Building Code Act, which, by law, must be enforced by all municipalities.
The Code is essentially a set of minimum provisions respecting the safety of buildings with reference to public health, fire protection and structural sufficiency. Its primary purpose is the promotion of public safety through the application of appropriate uniform building standards.
## BUILDING PERMITS:
A Building Permit is a license issued by a municipality which grants legal permission to begin a construction project Permits are typically required for new building(s), additions, prefabricated structures and alterations to heating, ventilation, air-conditioning (HVAC) and plumbing systems, and some renovations.
It is unlawful to start a building project without having first obtained a Building Permit.
## APPLYING FOR A BUILDING PERMIT:
1. Ensure that your project complies with the municipality's Zoning By-Law(s) - which regulate the use, size, required setbacks, etc., of land and buildings - and with other applicable law, regulations and policies of various Ministries and agencies (i.e. MNR, MTO, Hydro One, Northwestern Health Unit), New Home Warranty, etc. If you have questions or require further information or clarification, contact Chief Building Official Stewart Books 204 206-0018 email lowdawsonbuildingpermits@gmail.com.
2. You require a permit from MTO building within 45 metres of a Provincial Hwy & within 180m of the centre point of an intersection with a King's Hwy or 395m of an intersection of a Controlled Access Highway.
3. Fill out all applicable areas of the Application Form. Sign and date the form in the areas indicated.
4. Adequate drawings and related information which clearly show the building's structure and services as well as the location of all buildings and services on the property must be provided with your: application.
5. Submit the completed application form together with the drawings, information and required fee (see below) to the municipality for review by the Chief Building Official.
6. Keep the municipality informed as your project progresses so appropriate inspections can be done. Remember, it is your responsibility to call for inspections to ensure Code compliance.
## Local Approval Agencies:
| Northwestern Health Unit (Fort Frances).... 807-274-9827 |
|------------------------------------------------------------|
| Ministry of Natural Resources (Fort Frances) 807-274-5337 |
| Ministry of Transportation (MTO Emo).... .807-482-1362 |
| Ministry of Labour (Dryden).. .807-223-4898 |
| Electrical Safety Authority. .877-372-7233 |
| Township of Dawson. .807-852-3529 |
| DAWSON FEE SCHEDULE: Minimum Fee.. $50.00 |
| Maximum Residential Fee. .$1500.00 |
| Base fee for first $1000 .$50.00 |
| Each Additional $1000 of value or part thereof. .$7.00 |
| Demolition permits fee. .$25.00 |
## TOWNSHIP OF DAWSON
## BUILDING CODES & PERMITS INFORMATION SHEET
<!-- image -->
## Township of Dawson Application for a Permit to Construct or Demolish
This form is authorized under subsection 8(1.1) of the Building Code Act.
## For use by Principal Authority
Application number:
Permit number (if different):
Date received:
Roll number:
Application submitted to: Township of Dawson
(Name of municipality, upper-tier municipality, board of health or conservation authority)
## A. Project information
Building number, street name
Unit number
Municipality Township of Dawson
Postal code
Plan number/other description
Project value est. $
Area of work (m')
## B. Purpose of application
- [ ] New construction
- [ ] 0 Addition to an existing building
- [ ] Alteration/repair
- [ ] Demolition
Proposed use of building
Current use of building
Description of proposed work
Lot/con.
- [ ] Conditional Permit
- C. Applicant
Last name
Applicant is:
- [ ] 0 Owner or
First name
Street address
Municipality
Postal code
Telephone number
(
)
## D. Owner (if different from applicant)
Last name
First name
Street address
Municipality
Postal code
Telephone number
(
)
- [ ] Authorized agent of owner
Corporation or partnership
Unit number
Province
E-mail
Cell number
(
)
Corporation or partnership
Unit number
Province
E-mail
Cell number
Lot/con.
Lot/con.
## E. Builder (optional)
Last name
First name
Corporation or partnership (if applicable)
Street address
Unit number
Municipality
Postal code
Province
E-mail
Telephone number
(
Fax
)
Cell number
(
)
## F. Tarion Warranty Corporation (Ontario New Home Warranty Program)
- i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G.
- ii. Is registration required under the Ontario New Home Warranties Plan Act?
- ili. If yes to (ii) provide registration numbers): \_
## G. Required Schedules
- i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities.
- ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system.
## H. Completeness and compliance with applicable law
- i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted).
Payment has been made of all fees that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made.
- This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992.
- ili) This application is accompanied by the information and documents prescribed by the applicable by- law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law.
- iv) The proposed building, construction or demolition will not contravene any applicable law.
## I. Declaration of applicant
- [ ] Yes
- [ ] Yes
- [ ] - Yes
- [ ] Yes
- [ ] Yes
- [ ] Yes
- [ ] - Yes
Lot/con.
- [ ] 0 No
- [ ] No
- [ ] - No
- [ ] No
- [ ] No
- [ ] No
- [ ] No
declare that:
(print name)
1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge.
2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a) the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G 2E5 (416) 585-6666.
<!-- image -->
## Schedule 1: Designer Information
Use one form for each individual who reviews and takes responsibility for design activities with respect to the project.
## A. Project Information
Building number, street name
Unit no.
Lot/con.
Municipality Township of Dawson
Postal code
Plan number/ other description
- B. Individual who reviews and takes responsibility for design activities
Name
Firm
Street address
Unit no.
Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax number
Cell number
(
- )
- C. Design activities undertaken by individual identified in Section B. [Building Code Table 3.5.2.1. of Division C]
- [ ] House
- [ ] Small Buildings
- [ ] 0 Large Buildings
- [ ] Complex Buildings
- [ ] HVAC - House
- [ ] Building Services
- [ ] Detection, Lighting and Power
- [ ] Fire Protection
- [ ] Building Structural
- [ ] Plumbing - House
- [ ] Plumbing - All Buildings
- [ ] On-site Sewage Systems
Description of designer's work
## D. Declaration of Designer
declare that (choose one as appropriate):
(print name)
- [ ] I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.
Individual BCIN:
Firm BCIN:
- [ ] I review and take responsibility for the design and am qualified in the appropriate category as an "other designer" under subsection 3.2.5.of Division C, of the Building Code.
Individual BCIN:\_
Basis for exemption from registration:
- [ ] - The design work is exempt from the registration and qualification requirements of the Building Code.
Basis for exemption from registration and qualification:
I certify that:
1. The information contained in this schedule is true to the best of my knowledge.
2. I have submitted this application with the knowledge and consent of the firm.
Date
Signature of Designer
## NOTE:
1. For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4.7(1) d).of Division C, Article 3.2.5.1. of Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.
2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.
......
COPY OPPLOTPLAN
(Scale)
STREET OR CONCESSIOS
STREET OR CONCESSIOS
ROLL ND.
MATURE DE CONSIRUCIION
TOR OPTICE DSE ORLY
TYPL OF WORK
TYPL OF SIROCHURE
-Ji: