The Corporation of the Town of Espanola
Bylaw No. 2443/12
Being a Bylaw to Respecting Construction, Demolition
Change of Use Permits and Inspections
Whereas pursuant to the Building Code Act, as amended, the Lieutenant Governor in Council
has established a Building Code which is in force throughout Ontario to regulate all
construction, demolitions, extensions, material alterations and changes of use with respect to
buildings, for which the Council of the Town of Espanola has appointed a Chief Building
Official and such inspectors for the proper administration of the said Building Code.
And Whereas Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, empowers
Council to pass certain Bylaws respecting construction, demolition and change of use permits
and inspections.
Now Therefore, the Corporation of the Town of Espanola ENACTS AS FOLLOWS:
1.0
SHORT TITLE
This Bylaw may be cited as the "Building Bylaw".
2.0 DEFINITIONS
2.1 In this Bylaw,
"Act" means the Building Code Act, 1992, S.O. 1992, Chapter 23 as amended.
"applicant" means the owner of a building or property who applies for a permit or
any person authorized by the owner to apply for a permit on the owner's behalf, or
any person or corporation empowered by statute to cause the demolition of a building
or buildings and anyone acting under the authority of such person or corporation.
"as constructed plans" means as constructed plans as defined in the Building Code.
"architect" means a holder of a license, a certificate of practice, or a temporary
license under the Architect's Act as defined in the Building Code.
"building" means a building as defined in Section 1(1) of the Act.
"Building Code" means the regulations made under Section 34 of the Act.
"Chief Building Official" means the chief building official appointed by the Bylaw of
The Corporation of the Town of Espanola for the purposed of the enforcement of the
Act.
"construct" means to do anything in the erection, installation, extension or material
alteration or repair of a building and includes the installation of a building unit
fabricated or moved from elsewhere "Corporation" means The Corporation of the
Town of Espanola.
"demolition" means to do anything in the removal of a building or any material part
thereof
"Dwelling Unit" means a suite operated as a house keeping unit, used or intended to
be used as a domicile by one or more persons and usually containing cooking, eating,
living sleeping and sanitary facilities
"farm building" means a farm building as defined in the Building Code.
"permit" means written permission or written authorization from the Chief Building
Official to perform work regulated by this Bylaw and the Act, or to change the use of
building or part of a building or parts thereof as regulated by the Act.
"plumbing" means plumbing as defined in Section 1(1) of the Act.
"prescribed value" means, as determined by the Chief Building Official, the value of
construction of a proposed building or designated structure including the total value of
all work, labour, equipment, overhead, services and materials in respect of its
construction and of all professional and related services.
"professional engineer" means a person who holds a license or a temporary license
under the Professional Engineer's Act, as defined in the Building Code.
"sewage system" means a sewage system as defined in Section 1(1) of the Act.
"Substantially Completed" means when construction is sufficiently completed in
general conformance with the approved plans so that the building can be occupied for
the use for which it is intended
2.2
Terms not defined in this Bylaw shall have the meaning ascribed to them in the Act or
the Building Code.
Bylaw No.2443/12
2
3.0
PERMITS
3.1
Classes of Permits
Classes of permits with respect to the construction, demolition and change of use of
buildings and permit fees shall be as set forth in Bylaw ??? Schedule of Fees, Schedule
'D'
3.2
Building Permits
Where application is made for a construction permit under Subsection 8(1) of the Act,
the application shall:
1) use the provincial application form, "Application for a Permit to Construct or
Demolish"; and
2) include complete plans and specifications, documents and other information as
required by Article 1.3.1 Division C of the Building Code and as described in this
Bylaw set forth in Schedule "B" for the work to be covered by the permit.
3.3
Demolition Permits
Where application is made for a demolition permit under Subsection 8(1) of the Act,
the application shall:
1) use the provincial application form, "Application for Permit to Construct or
Demolish; and
2) include complete plans and specifications, documents and other information as
required by Article 1.3.1 Division C of the Building Code and as described in this
Bylaw set forth in Schedule "B" for the work to be covered by the permit.
3.4
Conditional Permits
Where application is made for a conditional permit under subsection 8(3) of the Act,
the application shall:
1) use the provincial application form, "Application for Permit to Construct or
Demolish; and
2) include complete plans and specifications, documents and other information as
required by Article 1.3.1 Division C of the Building Code and as described in this
Bylaw set forth in Schedule "B" for the work to be covered by the permit.
3) state the reasons why the applicant believes that unreasonable delays in
construction would occur if a conditional permit is not granted;
4) state the necessary approvals which must be obtained in respect of the proposed
building and the time in which such approvals will be obtained; and
5) state the time in which plans and specifications of the complete building will be filed
with the Chief Building Official.
3.5
Partial Permits
When in order to expedite work, approval of a portion of the building or project is
desired prior to the issuance of a permit for the complete building or project,
application shall be made and fees paid for the complete project. Complete plans and
specifications covering the portion of the work for which immediate approval is desired
shall be filed with the Chief Building Official. Where a permit is issued for part of a
building or project, this shall not be construed to authorized construction beyond the
plans for which approval was given nor that approval will necessarily be granted for
the entire building or project.
3.6
Change of Use Permits
Every application for change of use permit issued under subsection 10(1) of the Act
shall be submitted to the Chief Building Official and shall:
1) describe the building in which the occupancy is to be changed, by a description that
will readily identify and locate the building;
2) identify and describe in detail the current and proposed occupancies of the building
or part of a building for which the application is made;
3) include plans and specifications showing the current and proposed occupancy of all
parts of the building, and which contain sufficient information to establish
compliance with the requirements of the Building Code, including: floor plans;
details of wall, ceiling and roof assemblies identifying required fire resistance
ratings and load bearing capacities, details of existing "sewage systems", if any;
4) be accompanied by the required fee;
Bylaw No.2443/12
3
5) state the name, address and telephone number of the owner; and
6) be signed by the owner or his or her authorized agent who shall certify the truth of
the contents of the application.
3.7
Occupancy Permit for an Unfinished Building
Every application for authorization to occupy an unfinished building pursuant to
Division C, Subsection 1.3.3 of the Building Code shall:
1. Identify and describe in detail the occupancy, the date of such occupancy, and the
building or part thereof for which the application for a permit is made;
2. Be accompanied by plans which show the areas of the proposed occupancy; and
3. Be accompanied by the appropriate fee in accordance with Bylaw 2443/12
Schedule of Fees, Schedule 'D'.
3.8
Alternative Solutions, Disputes, Rulings and Interpretations
Where an application for a permit or for authorization to make a material change to a
plan, specification, document or other information on the basis of which a permit was
issued, contains an equivalent material, system or building design for which
authorization is requested, shall meet the requirements of section 2.1 Division C of the
Building Code.
4.0
ADMINISTRATIVE PROCEDURES RELATING TO PERMITS
4.1
Revision to Permit
After the issuance of a permit under the Act, notice of any material change to a plan,
specification, document or other information on the basis of which the permit was
issued, must be given in writing, to the Chief Building Official together with the details
of such change, which is not to be made without his or her written authorization.
4.2
Revocation of Permits
The Chief Building Official, subject to provisions outlined in subsection 8(10) of the Act
has the authority to revoke a permit issued under the Act.
4.3
Permit Application
To obtain a permit, the owner or agent authorized in writing by the owner shall file an
application in writing by completing a prescribed form available from the Chief building
Official, the Building Code website www.obc.mah.gov.on.ca or the Municipal website
www.espanola.ca. Forms prescribed by the Corporation under clause 7(1) (f) of the Act
shall be set out in Schedule "B" to this Bylaw.
4.4
Plans and Specifications
Sufficient information shall be submitted with each application for a permit to enable
the Chief Building Official to determine whether or not the proposed construction,
demolition or change of use will conform to the Act, the Building Code and any other
applicable law. Each application shall, unless otherwise specified by the Chief Building
Official, be accompanied by two complete sets of plans and specifications required
under this Bylaw. Plans shall be drawn to scale on paper, or other durable material;
shall be legible and, without limiting the generality of the foregoing, shall include such
working drawings as set out in Schedule "A" to this Bylaw unless otherwise specified
by the Chief Building Official.
4.5
The Site Plan
Site plans shall be referenced to an up-to-date survey and, where required to
demonstrate compliance with the Act, the Building Code or other applicable law, a copy
of the survey shall be submitted to the Chief Building Official. Site plans shall show:
1) Lot size and the dimensions of the property lines and setbacks to any existing or
proposed buildings;
2) Existing and finished ground levels or grounds;
3) Existing rights-of-way, easements and municipal services;
4) Proposed fire access routes and existing fire hydrant locations; and
5) Location and dimensions of existing or proposed on site sewage systems.
Bylaw No.2443/12
4
4.6 Payment of Fees
1) Fees for a required permit shall be as set out in Tariff of Fees Bylaw 2365/11
Schedule "D" and are due and payable upon submission of an application for a
permit. Where the fees payable in respect of an application for a partial permit or a
conditional permit, fees shall be paid for the complete project. Where the fees
payable in respect of an application for a construction or demolition permit issued
under subsection 8(1) of the Act or a conditional permit under subsection 8(3) of
the Act are based on the prescribed value of the proposed work, such value shall be
as defined in this Bylaw.
2) Permit Fees shall be doubled if construction has started before the permit is issued.
Payment of double fees will not relieve any person or corporation from:
a. Fully complying with the Ontario Building Code; or
b. Any penalty prescribed in the Act for starting or proceeding with work prior
to obtaining a construction permit.
4.7
Refunds
1) In the case of withdrawal of an application or abandonment of all or a portion of the
work or the non-commencement of any project, and upon written request, the Chief
Building Official shall determine the amount of paid permit fees that may be
refunded to the applicant, if any, in accordance with Tariff of Fees Bylaw Schedule
"D".
2) Except as provided above, there shall be no refund of permit fees where a permit
has been revoked or transferred.
5.0 NOTICE REQUIREMENTS FOR INSPECTIONS
5.1
Prescribed Notices for Inspections
A person to whom a permit is issued shall give notice of readiness for inspection to the
Chief Building Official. Such notice shall be given in accordance with the provisions of
the Building Code for all mandatory inspections listed in the Building Code under
Section 1.3.5.2 Division C
5.2
Improper Inspection Calls
At the discretion of the Chief Building Official where the owner and/or agent gives
notice for a specific inspection of any building, lot or parcel of land and the inspection
cannot be properly carried out due to unfinished work, or the inspection is broken
down to excessive site visits due to phasing of the project, or the inspection is
requested to be performed outside of the regular office hours of the Corporation, the
owner shall be responsible for all of the Corporation's costs, plus 20% overhead,
relating to the inspection. Such costs shall be termed "Inspection Fee" and shall be
paid to the Treasurer of the Corporation on demand.
6.0
PESCRIBED FORMS
6.1
Prescribing Forms
The forms prescribed for use as applications for permits, for orders and for inspection
reports shall be as set out in Schedule "B" to this Bylaw.
7.0
AS CONSTRUCTED PLANS
7.1
As Constructed Plans
The Chief Building Official may require that a set of plans of a building or any class of
buildings as constructed be filed with the Chief Building Official on completion of
construction under such conditions as may be prescribed in the Building Code.
8.0
CODE OF CONDUCT
The Code of Conduct required under section 7.1 (1) of the Act shall be the "Employee
Code of Conduct" which governs the conduct of all employees of the Corporation.
Bylaw No.2443/12
5
9.0 APPOINTMENT OF RCA'S
If the Municipality directly appoints a registered code agency under Section 4.1 of the
Act, an agreement must be completed.
The agreement with the registered code agency authorizes the agency to perform
functions specified in the agreement. The agreements shall be in writing and as
outlined in the Building Code under Article 3.7 Division C.
Under Subsection 4.1(3) of the Act, the Town of Espanola delegates to the Chief
Building Official, the authority to make appointments of registered code agencies.
10.0 VALIDITY
Should any section, clause or provision of this Bylaw be declared by a court of
competent jurisdiction to be invalid, the same shall not affect the validity of the Bylaw
as a whole or any part thereof, other than the part so declared to be invalid.
11.0 PENALTY
Every person who contravenes any provision of this Bylaw is guilty of an offence and
upon conviction under the Provincial Offences Act is liable to a fine and any other
penalty imposed under the Act as defined in this Bylaw.
12.0 REPEAL OF PREVIOUS BYLAW
Bylaw 1820/05 of the Corporation and its amendments are hereby repealed.
PASSED this 8th day of May, 2012.
_________________________
MikeLehoux
Mayor
__________________________
Cynthia Townsend
Clerk Treasurer/Administrator
Bylaw No.2443/12
6
Schedule "A"
This is Schedule "A" to Bylaw No. 2443/12 respecting
List of Plans or Working Drawings to accompany applications for permits
1.
Site Plan (two sets of Plans)
2.
Floor Plans (two Sets)
3.
Foundation Plans (two Sets)
4.
Framing Plans (two Sets)
5.
Roof Plans (two Plans)
6.
Reflected Ceiling Plans (two Sets)
7.
Sections and Details (two Sets)
8.
Building Elevations (two Sets)
9.
Electrical Drawings (two Sets)
10.
Heating, Ventilation and Air Conditioning Drawings (two Sets)
11.
Plumbing Drawings (two Sets)
12.
Fire Alarm and Sprinkler Plan (two Sets)
Note: The Chief Building Official may specify that not all the above-mentioned plans are
required to accompany an application for a permit.
Bylaw No.2443/12
7
Schedule "B"
This is Schedule "B" to Bylaw No. 2443/12 respecting
Form 1 Application for a Permit to Construct or Demolish
Form 2 Application for Change of Use Permit (1)
Form 3 Order Requiring Tests and Samples
Form 4 Change of Use Permit
Form 5 Stop Work Order
Form 6 Order to Uncover
Form 7 Order Not to Cover or Enclose
Form 8 Order to Comply