Township of Georgian Bluffs
Building Permit Information
Please read carefully as it may affect approval of your Building Permit
Building and Planning
Township of Georgian Bluffs
177964 Grey Road 18, RR #3
Owen Sound, Ontario
N4K 5N5
Phone: (519) 376-2729
Email: Building@georgianbluffs.ca
WHEN ARE BUILDING PERMITS REQUIRED
In basic terms, a Building Permit is required to erect, install, extend, alter or repair any
building or structure; there are only a few minor exceptions. As a rule, you should assume
a permit is required for any construction or alteration to any building or structure. You
should always obtain assistance from the Building Department staff before proceeding.
Following are examples of projects that will require a Building Permit:
Construction of a new home
Addition of a carport, garage, porch or room(s) to an existing home
Construction or finishing of rooms in the basement or attic
Any structural work including alterations to interior partitions or the installation of
new skylights, windows or doors
Addition of dormer(s)
Enclosing a porch or deck
Constructing a deck that is 2 feet or more above adjacent perimeter grade
Raising a house to provide a full basement
Excavating a crawl space to provide a full basement
Constructing or installing accessory buildings such as a garage, tool shed, or
playhouse larger than 10 square metres (108 square feet)
Adding fireplaces and other heating appliances
Constructing chimneys and flues
Constructing built-up roofs
Any interior work of a multiple dwelling (contains more than one dwelling unit) that
may affect means of egress, fire separations or access to exits
Constructing a retaining wall exceeding 1.0 metres in height
Installing an above-ground or an in-ground swimming pool *A fence / pool permit
will be required
Changes to/installation of plumbing
Insulation
Substantial material alteration
Foundation waterproofing or repairs
NOTE: All accessory buildings, decks, and similar structures must be located on the
lot in conformance with the zoning by-law even if a building permit is not required.
If these lists do not include your project and you are not sure whether a permit will be
required, you are strongly encouraged to review the proposed project with Building
Department staff before proceeding.
PLANNING YOUR PROJECT
During the preliminary planning stage of your project, you must determine the zoning by-
law regulations that apply to your property. Zoning by-laws regulate the use, size, location
and types of buildings permitted on property in the Township.
The Township of Georgian Bluffs zoning by-law contains a wide variety of land use and
development regulations that must be met before a property can be used or a building
erected.
The regulations address such matters as:
Permitted land uses within different parts of the Township
Setbacks of buildings from property lines
Setbacks of buildings from lands zoned hazardous
Building heights (usually from the ground in front of the buildings)
Building floor areas (may be defined as minimums or maximums)
Lot coverage (usually a maximum percentage of the lot that may be covered by
buildings or other structures)
Accessory uses and buildings (ie. pools and utility sheds)
Home occupations and outside storage
Required municipal services (water and sanitary sewer services)
Parking requirements
Some parts of the Township are under the jurisdiction of the Niagara Escarpment
Commission through a development permit system rather than Township zoning. In those
areas, a development permit must be obtained from the Commission before a change of
use or a building project can be undertaken.
Note: Proceeding without a Building Permit is a Provincial Offence.
APPLYING FOR A BUILDING PERMIT
An application for a Building Permit can be obtained from the Building Department at the
Township Office or from our website. This application must be fully completed and signed
before it will be accepted. Payment, in full, will be required prior to issuance of any building
permit or upon acceptance of a permit application form.
A complete application for a Building Permit will include:
All construction plans must be drawn to scale, fully dimensioned and of professional
quality. See Appendix A for Construction Drawing Requirements.
Completed application form, signed by the property owner or the owner's authorized
agent (usually the general contractor)
Completed Energy Efficiency Design Summary (if applicable)
Two complete sets of construction drawings (one set returned to you with permit)
Building permit application fee (and deposit if a new residential development)
Payment of development charges if a new residential development
Payment of any other charges and fees for services that may be applicable
Water Connection Permit and Plumbing Permit applications if connecting to municipal
water. All connection fees and charges must be paid prior to the issuance of a Building
Permit.
Please contact the Township Office with further questions.
The following outlines the information requirements for specific projects. Many property
owners find it advisable to hire an architect or professional home designer to prepare a
complete set of construction drawings and documentation suitable for application for a
Building Permit.
Construction of a New House
Site plan, showing all buildings on the property with dimensions, distance to lot lines,
location of easements, septic system, well and existing and proposed lot grades.
Lot drainage (consult with the Building Department to see if a drainage plan is required)
(In plans of subdivision, a drainage plan must be prepared by a consulting engineer
consistent with the overall grading plan for the entire subdivision)
Plans prepared by a qualified designer.
Basement plan (footing and foundation details) including the elevation of the footing or
foundation relative to geodetic datum or other point of reference acceptable to the Chief
Building Official. Depending on soil conditions, an engineer's report and certification of
the foundation plan may also be required
Servicing details (storm and sanitary sewer laterals, water lateral, electrical service
location)
Floor plans for each floor in detail, showing use, internal partitions, doors, windows
Roof plan, showing framing plans and/or roof truss details, and manufacturer's
specifications
Cross-section of house showing details of weather, air vapour, thermal barriers and
exterior cladding and internal wall covering
Exterior elevations of ALL views, fully dimensioned, showing all doors and windows
including their dimensions
Mechanical drawings (heating, wiring, plumbing, ventilation, smoke & CO2 detectors)
Energy efficiency design summary.
Septic Application
Entrance permit and 911 sign
If applicable, water connection permit.
Addition to a House (i.e. living space, attached garage, etc.)
Site plan, showing all buildings on the property with dimensions, distance from the
addition to lot lines, location of easements, existing and proposed lot grades
Lot drainage (consult with the Building Department to see if a drainage plan is required)
(In plans of subdivision, a drainage plan must be prepared by a consulting engineer
consistent with the overall grading plan for the entire subdivision)
Basement or foundation plan and depending on soil conditions, an engineer's report
and certification of the foundation plan may also be required
Floor plans, showing internal partitions, all openings (windows and doors)
Roof plan, showing framing plans and/or roof truss details, and manufacturer's
specifications
Cross-section of addition showing details of weather, air vapor, thermal barriers and
exterior cladding and internal wall covering, roof, beam, post and pier details as well as
connection between the new construction and existing houses.
Exterior elevations of ALL views of the addition, fully dimensioned, showing all
doors and windows including their dimensions
Mechanical drawings (heating, wiring, plumbing, ventilation, smoke & CO2
detectors)
Building Alteration Septic Application must be filled out.
Detached Garages and Sheds
Site plan, showing all existing buildings on the property with dimensions, distance from
the proposed building to existing buildings and lot lines, location of easements, septic
and well and existing and proposed lot grades including drainage
Lot drainage (consult with the Building Department to see if a drainage plan is required)
(In plans of subdivision, a drainage plan must be prepared by a consulting engineer
consistent with the overall grading plan for the entire subdivision)
Foundation plan (footing and foundation details) including the elevation of the footing
or foundation relative to geodetic datum or other point of reference acceptable to the
CBO and depending on soil conditions, an engineer's report and certification of the
foundation plan may also be required
Servicing details (if applicable)
Floor plans showing internal partitions, doors, electrical wiring and lighting
Roof plans, showing framing plans and/or roof truss details, and manufacturer's
specifications when required
Cross-section of structure showing details of weather, air, vapour, thermal barriers
and exterior cladding and internal wall covering
Exterior elevations.
Pools
Site plan showing details of fences and gates, pool equipment, location of buildings
and pool relative to lot lines, fully dimensioned
Location of septic and well
Structural details of the pool, including all structures to be built in support of the pool
(decks, service/pump buildings, change and storage buildings, stairways)
PERMIT APPLICATION REVIEW PROCESS
Once you submit a completed application for a Building Permit, the application is reviewed
by Building Department staff who assess the application for compliance with the
Township's Zoning By-law, conformity with the Ontario Building Code, service connections,
and any other factors which might apply to your specific lot.
If, in the process of reviewing the application, it is found that additional information is
required or that there are corrections or changes that need to be made, you will be
advised what is required. You should respond to requests for information promptly to
avoid unnecessary delays in obtaining your Building Permit.
PERMIT ISSUANCE and POSTING
Once a full review of the application has been completed and the necessary approvals
obtained, your Building Permit will be issued and can be picked up at the Township Office.
The Building Permit must be posted in plain view on the construction site for the building
inspector to verify at all times. You must also keep a complete set of the approved permit
drawings and documents on site for use by the building inspector.
Please read the permit documents thoroughly before starting construction. The
construction must comply with the plans and documents issued with your permit. Any
changes to the approved construction drawings must be provided in writing and approved
by the CBO. Contact Building Department staff immediately should you decide to modify
the construction plans. Depending on the degree of change, revisions may lead to delays.
THE CONSTRUCTION MUST BE INSPECTED
The building inspector must ensure that the construction complies with the Ontario
Building Code and the drawings upon which the Building Permit was issued.
A minimum of two business days is generally required for an inspection, so it is
imperative that you plan ahead.
It is a violation to proceed without calling for an inspection when one is required. Failure to
call for a required inspection may result in completed works having to be removed in order to
approve work that is hidden, which can cost you in both time and money.
Please call 519-376-2729 to request an inspection. Before you call, please have
available your permit number, name and address.
NOTE: It is your responsibility as the owner to ensure that you or your contractor(s)
call for inspections. Mandatory and/or required inspections are listed or noted on the
permit or other documentation issued with the permit. A final inspection is required
prior to the refunding of your building permit deposit (if applicable).
GENERAL INFORMATION
Once a Building Permit has been issued it is your responsibility to ensure.....
All setbacks as shown on the site plan (in compliance with the zoning by-law) are
adhered to.
All environmental inspections, i.e. water line and sewage systems are complete.
All roof truss data sheet information and layout, as well as floor truss shop drawings
are submitted with the construction drawings or available on site prior to the framing
inspection.
If you have any questions regarding Building Permit procedures or requirements, you can
obtain information by visiting or writing to the Building Department at the Township office.
We will be pleased to answer your questions.
Building Department staff are available to assist you from 9:00 am to 4:30 pm, Monday to
Friday (except for statutory holidays). The best use of your time and ours is to make an
appointment prior to your visit.
INFORMATION REQUIRED WHEN APPLYING FOR A BUILDING PERMIT
Please read carefully (incomplete information may cause delays)
1. Site Plan
A site plan must be submitted detailing setback of all structures from lot lines (including
accessory structures, pools, retaining walls, entrances, wells, septic system, water lines,
etc. as applicable.
2. Building Permit Application
Must be completed and signed.
3. Two Complete Sets of Building Plans
Two complete sets of building plans which meet the Ontario Building Code are required
prior to the processing of a building permit application.
4. Septic Application
Contact the Township of Georgian Bluffs, 519-376-2729
5. Entrance Permits
Costs may vary - please contact the appropriate authority as follows:
Township of Georgian Bluffs, Brian Anderson - 519-376-2729
County of Grey (County Roads)
519-376-2205
Ministry of Transportation (Provincial Highway)
6. Niagara Escarpment Development Control
519-372-4045
If the property is with the NEC, you must contact the Commission directly in order to obtain
approval.
Nick Hayward - 519-
7. Grey Sauble Conservation Authority
If the property is abutting or affected in any way by any watercourse, environmentally
protected area or wetlands you must contact:
Grey Sauble Conservation Authority 519-376-3076
8. Ontario New Home Warranty Plan
1-888-364-0096
Is your builder registered?
Are you expecting to have your new home warrantied?
9. Civic Addressing Number
Brian Anderson - 519 376-2729
The following site plan information is required:
Sketch of boundaries of property with driveway location and width of driveway
Distance from limits of driveway to side property lines
Any 911 numbers beside or across the road from your property
10. Municipal Water Connection (if available) Brian Anderson - 519 376-2729
If municipal water connection is available, please contact the Township Office regarding
fees. A Water Connection Application must be completed and signed by the home owner
prior to the issuance of a building permit.
11. Electrical Wiring Permit
1-877-372-7233
Please contact the Electrical Safety Authority for authorization or a local electrical
contractor.
12. Fire Departments
South Bruce Peninsula: 519-534-1400
Georgian Bluffs: 519-376-9933
13. Energy Efficiency Design Summary
Summary sheet must be completed for all new residential development including
additions.
Appendix A - Construction Drawing Requirements
The Building Code Act requires that all drawings be prepared by qualified individuals.
Some exemptions apply for certain building types.
Plans must contain sufficient information to enable staff to determine whether the
proposed work conforms to all applicable regulations.
The Township of Georgian Bluffs Building Department does not provide or prepare permit
drawings. If you are unsure of what is required please consult a professional designer.
Homeowners can prepare their own drawings and site plan, however it is important to note
that poorly done or improper and insufficient plans will lead to delays, so know when to
hire help.
Generally permits will require the following drawings:
Site Plan and Engineered Grading and Drainage Plan
A site plan is a drawing showing the entire property and identifying all structures in relation
to the property boundaries. A site plan must be prepared by a qualified individual.
A fully-dimensioned site plan should show:
North arrow
Scale
Legal description (reference property survey)
Lot and plan numbers
Easements, street names
Lot dimensions, existing building(s) and proposed addition(s) and/or building(s)
Other information relating to specific by-law requirements such as building length,
parking, etc.
Setbacks to all property lines for the existing dwelling and the proposed addition
Other information related to specific bylaw requirements such as building length, parking
etc.
Landscaping (hard and soft landscaping)
Elevation Drawings
Elevation Drawings show the exterior view of each side of the house. Each elevation is
identified by the direction it is facing, and should include:
Scale
Extent of new & existing construction Vertical dimensions of walls, windows & doors
Grade level
Exterior wall cladding, finishes & flashing
Overhang dimensions
Roof shape, slope & finish
Rain water leader & eaves trough
Exposed Building face and areas of unprotected openings
Foundation Plan
A foundation plan indicates the type of foundation being used for your project, the sizes of
the elements, and materials used. Any slab on grade over 596 square feet is to be
engineered as per the Ontario Building Code. Foundation plan shall include:
Scale
Use of rooms and spaces
Dimensions
Extent of new construction including new work within the existing building
Size, type and location of exterior and interior walls and partitions
Sectional arrows
References to detailed drawings
Floor Plan
A floor plan is a drawing of the structure as seen as if it is cut horizontally a few feet above
the floor. One floor plan is required for every floor of the house which is affected by the
new construction. Each plan shows the interior layout of the level in question as well as
providing the structural framing information for the floor or roof above. Floor plans should
include:
Scale
Use of rooms & spaces
Dimensions
Extent of new construction including new work within existing building
Size, type and location of exterior and interior walls and partitions
Widths, locations and lintel sizes of all openings
Location, dimensions and direction of stairs
Sectional arrows
References to detailed drawings
Material specifications or notes
Heating details and calculations
A cross sectional details page with structural information
Locations of interconnected smoke, strobe and carbon monoxide detectors
Decks
Should include:
An overhead and cross sectional view of the deck, with dimensions
Height above grade
Railing details
All plans shall clearly convey the scope of work, and be legible.
The adding of bedrooms, bathrooms, or 15% of floor area will trigger the requirement
for a septic review. Your local septic contractor can assist with this and provide results
in writing to accompany your application.
For more information, please contact the Township of Georgian Bluffs Building
Department at 519-376-2729.