| permit required for | Building Permit required under Subsection 8.(1) of the Act; may include Plumbing, heating, ventilation and air conditioning systems, Sewage Systems, Farm Buildings, Designated Structures and signs. | s. 3.1 |
| fee basis | Fees set out in Schedule "A"; calculated per square foot or flat fee, with minimum Permit fees. | Schedule "A"; Rules for determining Permit fees |
| authority | Chief Building Official and Inspectors | s. 12; Schedule "C" |
scout note
City of Guelph By-law (2015)-19985 respecting building construction and permits, as amended.