Building permits — Head, Clara and Maria, Ontario

Do I need a building permit? What does it cost?

In the Township of Head, Clara and Maria, Ontario, building permit rules are set by By-law Number 2023-16 — Building By-law, verified 2026-09-25. Permit required for: Building Permit required under s.8(1), may include plumbing, HVAC, sewage systems, farm buildings, designated structures; demolition; change of use; occupancy. Permit fees: Calculated in accordance with Schedule "A" of this by-law. Fees set in: Schedule "A" to this by-law.

By-law Number 2023-16 — Building By-law adopted bylaw
permit required for Building Permit required under s.8(1), may include plumbing, HVAC, sewage systems, farm buildings, designated structures; demolition; change of use; occupancy. s. 3.1.1–3.1.5
fee basis Calculated in accordance with Schedule "A" of this by-law. s. 7.1
fees location Schedule "A" to this by-law s. 7.1
authority Chief Building Official s. 10.4
scout note

Respecting Construction, Demolition and Change of Use Permits and Inspections under the Building Code Act, 1992; repeals By-law 2007-06. Sets permit classes, application requirements, revocation/transfer, inspection notices, and Schedule A/B fees/forms.

Townships of Head, Clara and Maria — By-laws page

Township's by-laws listing page linking the current 2023-16 Building By-law and the earlier 2007-06 building permits by-law it repeals.

Machine-readable: building-permits.json · Official website: http://www.townshipsofheadclaramaria.ca/ · Last verified 2026-09-25 · Building permits across Ontario · Building permits in other municipalities