Building Permit By-law 2026-1684, Schedule A (Permit Fees)

Jocelyn, Ontario · No. 2026-1684 · summary & facts

This is the exact embedded text of the captured official document. Snapshot d9d29eb1780f · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

By-law No. 2026-1684 Building Permit By-law Page 7 of 12 THE CORPORATION OF THE TOWNSHIP OF JOCELYN Schedule "A" to By-law No. 2026-1684 PERMIT FEES 1. Effective June 1st, 2026, the fees payable by the applicant for a building/demolition permit shall be as follows (subject to annual increases as prescribed below and as per section 16): Category or Type of Fee Updated Fee Schedule* (Effective June 1, 2026) *Increasing 3% annually as of January 1, 2027 Group 'C' - Low Density Residential $600 up to 800 sq ft or $0.75/square feet for buildings with a floor area over 800 square feet Group 'C' - Multiple Residential Minimum $850 up to 1000 sq ft or $0.85 per square foot for buildings with a floor area over 1000 square feet. Group 'C' - Residential - Major Alterations, additions Minimum $350 up to 500 ft2. $0.70/ft2 for buildings with a floor area over 500 ft2. Group 'C' - Garage, carport, accessory building Minimum $200 up to 400 square feet plus $0.50 per sq foot over 400 sq ft. Group 'C' -decks, docks, ra m ps , mi nor alterations, demolition Minimum $100 up to 250 square feet plus $0.40 per sq foot over 200 sq ft. Group 'A', 'B' ''D', 'E' ''F' - new construction and major additions or alterations $600 up to 800 square feet plus $0.75 per sq foot over 800 sq ft. Group 'A', 'B', 'D', 'E', 'F', demolition $100.00 flat fee Change of Use Permit: $250 (to convert to residential for occupancy purposes) $450 (to convert to commercial or industrial use) $100 (all other changes of use) Permit Renewal (if not completed after 3 years): 50% of the original permit cost Other permits: - Conditional - Moving Building - Signs - Temporary Structures - Woodstoves/Fireplaces $75 Plumbing $30.00 + $12/fixture over 5 fixtures In addition, and for clarification purposes, permits are not required for the following renovations/construction: - Line Fences (must comply with zoning by-law) - Landscaping - Eavestroughs - Painting (must comply with property standards by-laws) - Demolition of a detached accessory building of 15 sq. metres or less (161.459 sq. ft.) - Air Conditioning units - Drywall & interior renovations that do not change the structural integrity or insulation value of the building - Accessory structures under 15 sq. metres or less (161.459 sq. feet.), that do not hold a living quarter (must comply with Zoning by-law) - Replacement of Windows and/or Doors with no structural change - Replacement of Shingles/metal roof, if replacement material is the same as the original roofing material (ex. Shingle to Shingle or steel roof to steel roof replacement) - Non-structural board replacements to existing decks (replacements that do not involve joists, support beams or guarding) 2. Exemptions: Buildings and/or structures or any part thereof that are exempt from assessment by virtue of paragraphs 3, 9, 10 and 19, of Section 3 of The Assessment Act, R.S.O. 1970 and amendments thereto are exempt from permit fees but all other aspects of municipal, provincial and all other codes, regulations and by-laws must be adhered to in their entirety. By-law No. 2026-1684 Building Permit By-law Page 8 of 12 REFUNDS 3. If a building permit has been issued and applicable fees paid, project has not commenced, fees may be refunded as follows: (a) 80 per cent (80%) if administrative functions only have been performed. (b) 70 per cent (70%) if administrative and zoning functions only have been performed. (c) 45 percent (45%) if administrative, zoning and plans examination functions have been performed (d) 35 percent (35%) if the permit has been issued and no field inspections have been performed subsequent to permit issuance. 4. Renewal or re-assignment of permit where there is no change in proposed work $30.00 or one-half the original permit fee, whichever is lesser.