| permit required for | Construction, demolition, change of use, building & moving, plumbing, sewage system, and conditional permits as set out in Schedule 'A'. | s. 3.1; s. 3.2; s. 4.2; s. 4.3; s. 4.4; s. 4.5 |
| exemptions | Painting; replacement millwork/cabinets without plumbing; hot water heaters; oil/gas appliances; shingling; same-size doors/windows; decks <200 sq ft and <2 ft high; residential fences; structures <108 sq ft without plumbing; sheds/trailers. | Schedule "A", s. 3.1 |
| fee basis | Product of fee multiplier; based on cost of valuation; minimum $85.00; Schedule 'A' rates e.g. $0.50/sq ft new construction, $0.30/sq ft accessory, $50.00 minimum per project. | Schedule "A", s. 1.1; Schedule "A", s. 1.2; Schedule "A", s. 2.1; Schedule "A", s. 4.11 |
| authority | Chief Building Official; Inspectors; Registered Code Agency | s. 4.2; s. 9.2.1 |
scout note
Municipality of Machin's Building By-law under s.7 Building Code Act, 1992: construction/demolition/change-of-use permits and inspections, appoints Chief Building Official, permit definitions and requirements; rescinds by-law 1043-96.