 "answer": "In the Municipality of Markstay-Warren, Ontario, building permit rules are set by By-law 2018-38 - Building By-law, verified 2026-09-25. Permit required for: Construct or demolish a building; classes include construction, demolition and change of use permits. Permit fees: [(TCC / 1000) x $10.00] + Administrative Fee ($80 if TCC <= $5000; $120 if > $5000); minimum $100. Administered by: Chief Building Official (CBO) and Building Inspector/Inspector; Registered Code Agency (RCA) for inspections.",
 "municipality_id": "gx-001621",
 "municipality": "Markstay-Warren",
 "status_type": "Municipality",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.markstay-warren.ca/index.htm",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "By-law 2018-38 - Building By-law",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2018-09-17",
   "document_url": "https://markstay-warren.ca/wp-content/uploads/2026/06/2018-38-Building-By-law.pdf",
   "summary": "Municipality's Building Code Act by-law respecting construction, demolition and change-of-use permits and inspections; defines CBO/Inspector roles and required plans (Schedule B); sets permit fees and refunds (Schedule A) and a lot grading policy (Schedule C).",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "bf7d7e4f79199cd63276357aacd33ffaf45cc019955c67115925bcab7d3e7a71",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "2018-38",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/bf7d7e4f79199cd63276357aacd33ffaf45cc019955c67115925bcab7d3e7a71.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construct or demolish a building; classes include construction, demolition and change of use permits.",
    "fee_basis": "[(TCC / 1000) x $10.00] + Administrative Fee ($80 if TCC <= $5000; $120 if > $5000); minimum $100.",
    "authority": "Chief Building Official (CBO) and Building Inspector/Inspector; Registered Code Agency (RCA) for inspections.",
    "fine_range": "additional administration fee equal to twice the value of the fee applicable under Schedule 'A' or $250 whichever is greater"
   },
   "fact_citations": {
    "permit_required_for": "s. 2.01; s. 2.02",
    "fee_basis": "Schedule \"A\"",
    "authority": "s. 1.07; s. 1.08; s. 2.01; s. 15.01; s. 16.01",
    "fine_range": "s. 11.01"
   },