| permit required for | Construction of a new building, demolition, alteration/repair to an existing building, conditional/partial permit, and change of use. | s. 4.1; s. 4.3(3) |
| fee basis | As set out in Schedule "A": per square foot rates, flat fees, and $100 minimum; or valuation/floor area under s. 7.5. | Schedule "A"; s. 7.5 |
| authority | Chief Building Official; Building Official/inspectors. | s. 2.7; s. 9.0 |
scout note
Township of Montague's Building By-law under s.7 Building Code Act, 1992: sets permit requirements for construction, demolition and change-of-use, Chief Building Official duties, fee schedule (Schedule A), required forms (Schedule B), inspections, and a Code of Conduct for building officials.