 "answer": "In the Township of Perry, Ontario, building permit rules are set by Building By-law 2017-24 and 1 other bylaw, verified 2026-09-25. Permit required for: new, addition, renovations, plumbing, heating, etc. Permit fees: The greater of $15/$1,000 of estimated construction value or per sq. ft.; minimum charge $250.00. Administered by: Chief Building Official.",
 "municipality_id": "gx-001696",
 "municipality": "Perry",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.townshipofperry.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-law 2017-24",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "document_url": "https://townshipofperry.ca/wp-content/uploads/2026/06/2017-24-Building-By-law.pdf",
   "summary": "Township of Perry's Building Code Act by-law respecting construction, demolition, septic, change-of-use, conditional permits, transfer of permits, inspections, and setting/refunding of fees. Scanned PDF; confirmed via OCR (title page + Schedule D set-fines page).",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "77e868e088dbab9fe5232ea466070ea0ebac381cf72704ba7d29c90630ee93bf",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "adopted_date": "2017-03-15",
   "document_number": "2017-24",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/77e868e088dbab9fe5232ea466070ea0ebac381cf72704ba7d29c90630ee93bf.pdf",
   "link_dead": false,
   "transcript_url": "/ca/on/perry/building-permits/bylaw-2017-24/",
   "transcript_quality": "ocr"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Fees and Charges By-law 2025-79, Schedule I - Building Department Fees",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "document_url": "https://townshipofperry.ca/wp-content/uploads/2026/01/2025-79-Fees-Charges-1.pdf",
   "summary": "Township's consolidated fees by-law; Schedule I sets 2026-2028 building/construction permit fees (minimum charge, per-sq-ft rates by occupancy group, decks, garages, additions) as redirected by the 2022 amendment to the Building By-law.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "8b7647c729ca4b9b229b1a41c3ea80fc57d8237f6bdf5e3d4922d64ff4bc3929",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "2025-79",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/8b7647c729ca4b9b229b1a41c3ea80fc57d8237f6bdf5e3d4922d64ff4bc3929.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "new, addition, renovations, plumbing, heating, etc.",
    "fee_basis": "The greater of $15/$1,000 of estimated construction value or per sq. ft.; minimum charge $250.00.",
    "authority": "Chief Building Official"
   },
   "fact_citations": {
    "permit_required_for": "CONSTRUCTION PERMIT FEES (new, addition, renovations, plumbing, heating, etc.)",
    "fee_basis": "Schedule \"I\"",
    "authority": "at the discretion of the Chief Building Official"
   },
   "transcript_url": "/ca/on/perry/building-permits/bylaw-2025-79/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/perry/building-permits/"
}