THE CORPORATION OF THE TOWN OF PERTH
BY-LAW NO. 5145
A By-law to regulate occupancy, construction, demolition, and change of use
permits for buildings, designated structures, on-site sewage systems and all other
related service systems within the Town of Perth
Recitals:
1. The Ontario Municipal Act, 2001, S.O. 2001, c. 25, as amended, confers broad
authority on the municipality to enable the municipality to govern its affairs as it
considers appropriate and further states that a lower tier municipality may provide
any service or thing that the municipality considers necessary or desirable for the
public, subject to the rules set out in subsection 11 (4). 2006, c. 32, Sched. A, s. 8.
2. Section 7 of the Building Code Act, 1992, S.O. 1992, c.23, as amended, authorizes
municipal Councils to pass By-laws respecting construction, demolition and
change of use permits, inspections and related matters including fees.
3. The Committee of the Whole reviewed Report 2024-COW-6.4, and concurs with the
staff recommendations;
4. The Council of The Corporation of the Town of Perth deems it advisable to pass
this By-law.
Accordingly, the Council of The Corporation of the Town of Perth enacts as follows:
PART 1.
GENERAL
1.1
This By-law may be cited as the "Building By-law''.
1.2
Words in the singular may include the plural and words in the plural may include
the singular.
1.3
Specific terms include any gender and include corporations.
1.4
The headings and subheadings used in this By-law shall not form a part of the
By-law, but shall be deemed to be inserted for convenience of reference only.
1.5
This By-law is to be read in conjunction with all the Statutes referred to in the
preamble hereto and in the event that there is a conflict between the provisions of
this By-law and the provisions of the Act or its regulations, then the provisions of
the Act and its regulations, as amended, prevail.
1.6
This By-law shall apply to all property in the Town of Perth.
1.7
Schedule "A", "B", "C - 1", "C - 2", and "D", attached hereto shall form part of this By-
law.
PART 2.
DEFINITIONS
2.1
Non-defined Terms
Definitions of words and phrases used in this By-law that are not included in
the list of Defined Terms shall have the meanings that are commonly
assigned to them in the context in which they are used, taking into account
the specialized use of terms by the various trades and professions to which
the terminology applies.
2.2
Defined Terms.
In this By-law all words or phrases shall have the meaning accorded to them in
the Building Code Act or its regulation (the Building Code). In addition, in
this By-law, the following words and phrases shall have the following meaning;
2.2.1
"Act" means the Building Code Act, 1992, S.O.1992, c.23, as
amended.
2.2.2
"Applicant" means the Owner of a building or property who
applies for a Permit or any person authorized to apply for a
Permit on the owner's behalf, or any person or corporation
empowered by statute to cause the construction, demolition, or
the change of use of a building or buildings and anyone Acting
under the authority of such person or corporation.
2.2.3
"Building Code" means the in-effect regulations made under
Section 34 of the Act, including all applicable amendments.
2.2.4
"Chief Building Official" means a person performing duties as
described under Section 1.1(6) and 1.1(7) of the Act as the
Chief Building Official appointed pursuant to Section 3.(2) of
the Act and by By-law of the Corporation of the Town of Perth
for the purposes for the administration and enforcement of the
Act and this By-law.
2.2.5
"Complete Application" means an application that meets the
requirements set out in the Building Code and Part 4 of this By-
law.
2.2.6
"Conditional Permit" means a Permit issued under Section
8(3) of the Act.
2.2.7
"Digital Signature, or Digital Professional Seal" means
cryptographically protected information in which the veracity of the
certificate details is certified by a recognized digital signature
certificate authority.
2.2.8
"Inspector" means a person performing duties as described
under Section 1.1(7) of the Act as a Deputy Chief Building
Official, Building Inspector, or Plans Reviewer appointed
pursuant to Section 3.(2) of the Act and by By-law of the
Corporation of the Town of Perth for the purposes for the
administration and enforcement of the Act and this By-law.
2.2.9
"Owner" means the registered Owner and includes lessee, or
mortgagee of a building or property, or any person or corporation
empowered by statute to cause the construction, demolition, or
the change of use of a building or part thereof and anyone Acting
under the authority of such corporation. Where an Owner is
obligated by this By-law to undertake actions, they do so at their
own expense.
2.2.10
"Partial Permit" means a Permit issued by the Chief Building
Official to construct, demolish or change the use of part of a
building
2.2.11
"Permit" means written permission, or written authorization given
in writing by the Chief Building Official to perform work, to
change the use of a building or part thereof, or to occupy a
building or part thereof, as regulated by the Act and Building
Code.
2.2.12
"Permit Holder" means the Owner, as defined by Building
Code, to whom the Permit has been issued or where a
Permit has been transferred, the new Owner to whom the
Permit has been transferred.
2.2.13
"Plot Plan" means a detailed drawing(s) of proposed
improvements to a given property at a defined scale Plot Plans
are also known as a Site Plan.
2.2.14
"Principal Building" means the first building constructed on
vacant property, or the first building that replaces a previous
Principal Building where accessory buildings already exist and
are to remain.
2.2.15
"Town" means The Corporation of the Town of Perth.
2.2.16
"Sewage System" means a private on-site sewage system as
defined in Article 1.4.1.2 of Division A of the Building Code.
PART 3.
PERMITS REQUIRED
3.1
No person shall construct, demolish, or occupy a building or cause a building
to be constructed, demolished, or occupied, unless a permit, as set out in
Schedule "A" of this By-law has been issued.
3.2
No person shall change the use of a building or cause the use of a building to
be changed, unless a permit, as set out in Schedule "A" of this By-law has
been issued.
3.3
No person shall construct or demolish a Sewage System or cause a Sewage
System to be constructed or demolished, unless a permit, as set out in
Schedule "A" of this By-law has been issued.
PART 4.
APPLICATION REQUIREMENTS FOR ALL PERMITS
General Requirements
4.1
In addition to a Permit application submission demonstrating conformance with
the conditions listed in sections 4.5 to 4.16 of this By-law are met. To be
considered a Complete Application, every Permit application shall be
accompanied by the approval documents issued by the agencies responsible for
the applicable laws listed in the Building Code.
4.2
An application for a Permit may be refused by the Chief Building Official where it
is determined that the application submission does not comply with section 4.1 of
this By-law.
4.3
The Chief Building Official is delegated the authority to create and/or adopt for
usage, forms (other than those prescribed by the Act or the Code) which provide
for the collection of specific information in relation to Permit applications which
information is necessary for the administration and enforcement of the Act and
Code. The Chief Building Official's office shall maintain a list of forms that it has
issued or adopted for usage.
4.4
The Chief Building Official may, as the Chief Building Official deems
appropriate, provide prescribed forms in electronic format and may allow for
electronic submission of completed Permit application forms, agency approval
letters, and design documents.
4.5
Documents submitted with, or in support of, a Permit application to the Chief
Building Official shall;
4.5.1 Only contain the information that is relevant to the proposed works in the
application. Any document submitted that is not required by this By-Law to
be submitted with an application, or that has been deemed by the Chief
Building Official as not relevant in the review of the application, shall be
deemed to not form part of the application or the Permit issuance.
4.5.2 Where a document or plan that specifies options or optional work, the
document or plan shall clearly identify which option is being proposed in the
application. Prior to the issuance of any Permit, the Chief Building Official
may require the Applicant submit revised documents with the options not
relevant to the project removed from the document submissions.
4.6
Application Forms, Plans, Specifications and other related documents submitted in
accordance with this By-law or otherwise required by the Act become the property
of the Town and will be disposed of, or retained in accordance with relevant
legislation or by-law.
4.7
Every application for a Permit to change the use of, alter, construct, or demolish,
all or part of a Building, Sewage System, or Designated Structure defined under
the Act, shall;
4.7.1 identify and describe in detail the work to be done and where applicable
indicate the existing and proposed use and occupancy of the building, or
part thereof, for which the building Permit application is made;
4.7.2 be accompanied by the plans, specifications, documents, forms and other
information prescribed in Parts 5, and 10 of this By-law; and
4.7.3 be accompanied by acceptable proof of corporate identity and property
ownership, unless such proof is determined by the Chief Building Official
to be unnecessary.
4.7.4 include payment of all applicable Permit fees calculated in accordance with
Part 7 of this By-law, unless the Chief Building Official indicates
otherwise, payment of all applicable fees may be collected from the Permit
Holder upon notice by the Town that a Permit is ready for release, but
prior to release of any Permit documents. Pursuant to the Act, no Permit
is deemed issued until payment of all applicable fees have been received
by the Town.
Additional requirements for applications for permits to Demolish
4.8
In addition to the requirements of Section 4.7 of this By-law every application for a
Permit to demolish a building shall:
4.8.1 in the case of partial building demolitions, identify and describe in detail the
proposed use and occupancy and works to that part of the building that will
remain upon completion of the demolition.
Additional requirements for application for permits to Construct Part of a Building
4.9
In addition to the requirements of Section 4.7 of this By-law, every Applicant for a
Partial Permit shall:
4.9.1 file a Permit application for the entire project;
4.9.2 file, in addition to the plans, specifications, documents, forms and other
information prescribed in Parts 5, and 10 of this By-law for the entire project,
also include sufficient plans, specifications, other information to identify part
of the work for which application for a Partial Permit is made.
4.10
The Chief Building Official may issue a Partial Permit when the Chief Building
Official determines it is appropriate to expedite the start of construction before a
Permit for the entire building is available and where the relevant provisions of this
By-law and the Act are met. When determining whether to issue a Partial Permit,
the Chief Building Official shall have regard for the likelihood of subsequent
approvals being available in a timely fashion such that a project is not interrupted
and exposed to potential damage from the elements, while awaiting subsequent
approvals.
Additional Requirements for application for Conditional Permits
4.11
In addition to the requirements of Section 4.7 of this By-law, every application for a
Conditional Permit shall:
4.11.1 include a written statement from the Applicant explaining why the
Applicant believes that unreasonable delays in construction would occur if
a Conditional Permit is not granted;
4.11.2 include a written acknowledgement from the Applicant of the necessary
approvals that must be obtained in respect of the proposed building in order
for the Permit to be issued and the time in which such approvals will be
obtained;
4.12
The Chief Building Official may, at his/her discretion, issue a Conditional Permit
where unreasonable delays are anticipated in obtaining all necessary approvals,
and where the relevant provisions of this By-law and the Act are met.
4.13
Prior to the issuance of a Conditional Permit the Applicant, and any other
persons the Chief Building Official determines, shall enter into a written
agreement with the Town. The Chief Building Official is delegated the authority
to sign a Conditional Permit agreement on behalf of the Town.
Additional Requirements for applications for permits for Change of Use Permit, or
for Signs requiring a Building Permit
4.14
In addition to the requirements of Section 4.7 of this By-law, every application for a
Permit for a Change of Use or Signs regulated by the Building Code shall:
4.14.1 where an application is made proposing the Change of Use of all or part of a
building, the applicant shall identify and describe in detail the existing and
proposed use(s) and occupancy, or occupancies, of the whole building.
4.14.2 where a Permit is required for wall and ground signs by the Act the
requirements for a Town sign permit shall be waived.
4.14.3 Notwithstanding the relief of a Town sign permit, as described in subsection
4.14.2, the technical scope and limitations contained within the current
edition of the Town Sign By-law shall apply to the project, except where a
conflict exists between the Town By-law and the Building Code, in those
instance the provisions of the Building Code shall prevail.
No Implication of Permit Availability
4.15
Notwithstanding the issuance of a Permit under Sections 4.10 (Partial Permit) or
4.12 (Conditional Permit) of this By-law, the Chief Building Official shall not be
deemed, implied or obliged to issue any further or additional Permits for such
property.
4.16
Where construction has commenced prior to the issuance of a Permit, a Permit
based on any of the above applications may be issued at the sole discretion of the
Chief Building Official.
Abandoned Permit Applications or issued Permit, and Revoked Permits
4.17
An application for a Permit, or an issued Permit may be deemed to be abandoned
where:
4.17.1 the application has been determined to be incomplete pursuant to Section
4.2 of this By- law and remains incomplete for a period 30 days from the
date the application was determined to be incomplete; or
4.17.2 the Applicant has failed to obtain a copy of a Permit within 30 days of
being notified that such Permit is available for issuance (including where
the payment of any outstanding fees is required at the time of issuance);
or
4.17.3 where a Permit Holder has failed to commence construction or
demolition within six months of the Permit issuance date, or
demonstrates a failure to continue construction or demolition by not
obtaining prescribed inspections from the Chief Building Official or
designate, within the time frames listed in Section 8.(10) of the
Building Code Act, 1992, S.0. 1992, c.23, as amended; and
4.17.4 any Permit issued may be revoked in accordance to the provisions of
Section 8.(10) of the Building Code Act, 1992, S.0. 1992, c.23, as
amended.
Revisions of Permits
4.18
After the issuance of a Permit under the Act, the Applicant shall give notice to the
Chief Building Official in writing of any material change to a plan, specification,
document or their information upon which a Permit was issued, together with the
details of such change, which change shall not be made without the prior written
authorization of the Chief Building Official.
Additional Requirements for application for permits for Site Service Infrastructure
or Mechanical Services
4.19
No Permit shall be issued for site services infrastructure or mechanical works
unless the Applicant has provided the Chief Building Official the name, contact
information, and if applicable, the license number, of the professional firms or
individuals that install the following;
4.19.1
A water service, sanitary treatment or sewer, storm sewers, and
plumbing systems
4.19.2
A heating, ventilation and air conditioning (HVAC) systems
4.19.3
A fire alarm, or electromagnetic locking device system
4.19.4
A sprinkler system and other fire suppression system
4.19.5
Any other system, device, product or component, not identified
above that is mandated, by the product approval authority, to be
installed by trained installers or technicians.
4.19.6
A Sewage System
4.20 Notwithstanding the requirements of section 4.19 a home owner is exempt from
complying with subsections 4.19.1 and 4.19.2 provided the work undertaken is
on the premises in which they reside.
Separate Permit Applications
4. 21 Where parts of the construction or demolition proposed in an application are
to take place in separate phases, stages, or timeframes, the Chief Building
Official may require the Applicant to submit separate applications for each
phase, stage, or timeframe of the proposed project.
4. 22 Where the construction or demolition proposed in an application contains
multiple freehold units or multiple civic addresses for one building, the Chief
Building Official may require the Applicant to submit separate applications
for each freehold unit or civic address.
Occupancy Permit Requests
4. 23 A Permit Holder may only request an occupancy inspection in writing, for the
purposes of obtaining an Occupancy Permit, at least two (2) business days before
a building, or part thereof is ready for occupancy inspection, and after a minimum
of two (2) business days have elapsed since the Permit Holder submitted to the
Chief Building Official "close out" documents applicable to the project, such as,
but not limited to;
o Substantial Completion or Occupancy letters issued by the project
Professionals,
o Commissioning and/or Test or Verification Certificates in accordance to
governing Standards, or
o Approval Reports or Certificates issued by other Governing Agencies.
PART 5.
PLANS AND SPECIFICATIONS
5.1
As part of the application for a Permit and in addition to the requirements of Part 4
of this by- law, every Applicant shall submit to the Chief Building Official
sufficient plans, specifications, documents, forms, as described in Schedule "B" of
this By- law, and such other information as may be deemed necessary by the
Chief Building Official to determine whether the proposed construction,
demolition, or change of use conforms to the Act, and the Building Code;
5.2
Plans, specifications and other documents which are submitted to satisfy section
5.1 of this By-law shall:
5.2.1 be fully coordinated among design disciplines and intended for construction,
demolition or change of use; and,
5.2.2 be fully dimensioned and drawn to a suitable scale that clearly depicts the
proposed construction, demolition or change of use; and,
5.2.3 include a Title Block containing; project title or proposed use of building,
property owner's name, municipal address of the project location, scale of
drawing, drawing title, date drawing produced or revised and,
5.2.4 include the designer's contact, qualification information, affixed with the
appropriate seal embossed with the designer's signature and date of
seal, as required, by applicable legislation and associated regulations;
and,
5.2.5 except where authorized by the Chief Building Official, pursuant to
section 4.4, and sections 5.9 to 5.15 (electronic submission) of this By-law,
be submitted on paper or other suitable and durable material; and
5.2.6 contain information and English text that is clear and legible, signatures
shall be the original wet ink signature; and
5.2.7 In lieu of separate designs and specifications produced by specialized
design disciplines and where designs are not otherwise regulated by
legislation, essential information may be shown on drawings, however the
use of generic terms such as "by others", "as per the Building Code", "in
accordance with....", etc... shall not be used; and,
5.2.7 must be clearly marked "for Building Permit" or such similar language
indicating the drawing copy is meant for building permit review.
5.3
Unless waived by the Chief Building Official, every application for single dwelling
residential projects shall be accompanied by two (2) sets of plans, specifications
documents and other information required to facilitate the administration and
enforcement of the Building Code. Where digital submission is accepted by the
Chief Building Official, the Applicant shall submit one (1) set of plans on paper
sized 11" x 17" and one (1) set specifications documents on paper sized 8.5" x 11"
or 8.5" x 14".
5.4
Unless waived by the Chief Building Official, every application for non-single
dwelling residential projects shall be accompanied by three (3) sets of plans,
specifications documents and other information required to facilitate the
administration and enforcement of the Building Code. Where digital submission is
accepted by the Chief Building Official, the Applicant shall submit one (1) set of
plans on paper sized 11" x 17" and one (1) set specifications documents on paper
sized 8.5" x 11" or 8.5" x 14".
5.5
On completion of the construction of a building, the Chief Building Official may
require the Owner to Submit a set of as-constructed plans, in accordance with
sections 5.3 or 5.4 of this By-law.
5.6
Survey Required - On completion of the construction of a new Principal
Building that is not subject to the conditions of a registered Site Plan or Plan of
Subdivision Agreement, the Chief Building Official may require the Owner to
submit two (2) sets of as-constructed plan of survey, prepared by a registered
Ontario Land Surveyor showing the location of the building to facilitate the
administration and enforcement of the Building Code requirements as they
pertain to spatial separation, fire access routes, etc.... Where digital submission
is accepted by the Chief Building Official, the Owner shall submit one (1) set
of plans on paper sized 11" x 17" and one (1) set specifications documents on
paper sized 8.5" x 11" or 8.5" x 14".
5.7
Grading Plan Required - On completion of the construction of a new Principal
Building that is not subject to the conditions of a registered Site Plan or Plan of
Subdivision Agreement, the Chief Building Official may require the Owner to
submit two (2) sets of as-constructed grading plan to facilitate the administration
and enforcement of Building Code requirements as they pertain to building
height determination, fire access routes, grading drainage, barrier free design,
etc.... This plan shall be accompanied by a statement certifying the grading has
been constructed either, in accordance with the approved proposed grading plan,
or indicating that the grading, as constructed, has been constructed in
accordance with accepted engineering practices as to not adversely affect
neighboring properties, and meets the intended storm water management practices of
the area. Both documents shall be prepared, signed and sealed by a Professional
Engineer, licensed to practice in the Province of Ontario. Where digital submission is
accepted by the Chief Building Official, the Owner shall submit one (1) set of plans on
paper sized 11" x 17" and one (1) set specifications documents on paper sized 8.5" x 11"
or 8.5" x 14".
5.8
Upon the completion of construction of accessory buildings for which a building
permit is required, or additions to any existing buildings, at the discretion of the
Chief Building Official, the Owner may be required to submitted the documents
required in Sections 5.6 and 5.7 of this By-law.
Electronic Document Requirements
5.9
Digital documents shall be separated into individual files for each document
type, for example, application forms and schedules, construction plans from
different areas of discipline, specification or regulatory authorization documents
shall not be saved together. Each file shall be named and labelled accordingly to
describe its contents. Individual saved documents may be saved in .ZIP folder to
facilitate delivery.
5.10
Individual digital documents shall be provided in any combination of .PDF, .JPG,
.DOCX, or .XLSX file format, shall have a document size not less than 8.5"x11"
and not exceeding 36"x48", and any individual electronic file size shall not exceed
100 megabytes.
5.11
Where a document is a scanned copy or photographed copy, the document shall
be formatted to be centered, aligned, and cropped to only display relevant
information.
5.11
Document endorsement must be in an accepted "Digital Signature, or Digital
Professional Seal" format.
5.12
The Chief Building Official may require digital documents to be provided by an
Applicant with optical character recognition (OCR) and saved in a searchable
format for Building Staff review.
5.13
Digital submissions may be e-mailed to the Building Clerk at
buildingadmin@perth.ca or upload to a secure and recognized online file sharing
system or website, with access granted to Building Staff.
5.14
The Chief Building Official may refuse a digital submission if, after consultation
with the Town's IT Manager, the digital safety and security of the Town may be
compromised by the submission.
5.15
The Chief Building Official may require that hard copy applications be
accompanied by the same submission in digital format that meets the standards for
digital submission and digital documents as specified by this By-Law.
PART 6.
AUTHORIZATION OF ALTERNATIVE SOLUTIONS
6.1
Where approval for an Alternative Solution under the Building Code is proposed
in either the application for a permit, or in a material change to a plan,
specification, document or other information on the basis of which a Permit was
issued, the Applicant shall submit:
6.1.2 an application on a form prescribed by the Chief Building Official;
6.1.3 supporting documentation demonstrating that the proposed Alternative
Solution will provide the level of performance required by the Building
Code; and
6.1.4 payment of the required fees prescribed by Part 7 of this By-law.
PART 7.
PERMIT FEES, ADMINISTRATIVE FEES, AND REFUNDS
Permit Fees, Administrative Fees.
7.1
The total of all fees shall be calculated utilizing the calculation methods described
in Schedule "C - 1" of this By-law and the individual fees, or a combination
thereof, listed in Schedule "C - 2" of this By-law that, in the opinion of the Chief
Building Official, most closely reflect the scope and nature of the proposed
project and in accordance with the provisions of this By-law. Schedule "C - 2"
shall be adjusted annually on January 1st of the new year, to increase the fees
based on the Consumer Price Index (CPI) of the previous year, rounded up to the
next ten cents ($0.10).
7.2
Where project valuation is used to calculate fees, the Chief Building Official may
place a valuation on the cost of the proposed project and where disputed by the
Applicant, the Applicant shall pay the required fee under protest and, within six
months of completion of the project, shall submit an audited statement of the actual
costs. Where the Chief Building Official, in his sole discretion, agrees that the audited
costs are less than the valuation, the Chief Building Official may issue a partial refund
that reflects the difference between the two amounts. Where the project valuation
exceeds thirty-five thousand dollars, the minimum fee amount shall be waived from the
overall permit fee calculated total.
7.3
Where the Chief Building Official determines that a third-party evaluation is
required to assist in the determination of compliance with the Act, the Building
Code and associated Regulations or Standards, the Owner of the subject property
shall pay a non-refundable fee to the Town equal to all fees and disbursements
incurred by the Town for the third party review, and all other costs associated to
the use of Town resources used to engage and obtain a third party evaluation.
7.4
Where the Chief Building Official determines that a professional legal consultant
is required to assist in the determination of; compliance with, or the enforcement
of, the Act, the Building Code, and associated Regulations or Standards, the
Owner of the subject property shall pay a non-refundable fee to the Town equal to
all fees and disbursements incurred by the Town and all other costs associated to
the use of Town resources used to engage a legal consultant.
7.5
Where an Applicant makes application for a Conditional Permit, the Applicant
shall pay a non-refundable administrative fee to the Town equal to all fees and
disbursements incurred by the Town for engaging a legal consultant for the
drafting and registration of Conditional Permit agreements.
7.6
The Chief Building Official shall not issue a discharge certificate of an order,
issued under the authority of the Act, to the proper land registry office until the
Owner of the subject property has paid a non-refundable fee to the Town equal to
all fees and disbursements incurred by the Town to register and to discharge the
order.
7.7
In addition to fees described in Sections 7.1 to 7.5 of this By-law, any person who
commences construction, demolition, occupies, or changes the use of building or
part thereof prior to the issuance of a Permit to construct, demolish, occupy, or
change the use of a building or part thereof, in addition to any penalty imposed
under the Act or Building Code, shall pay the applicable Permit fees listed in
Schedule "C - 2" of this By-law and an additional non-refundable administrative
fee equal to the value of the applicable Permit fees listed in Schedule "C - 2" of
this By-law.
7.8
Where the Chief Building Official grants a reinstatement of a suspended or
revoked Permit, the Owner shall pay a non-refundable administrative fee equaling
half the value of the applicable Permit fees listed in Schedule "C - 2" of this By-law.
7.9
The Chief Building Official shall not issue a Permit until all fees required by this
By-law have been paid in full by the Applicant; and,
7.9.1 If Permit issuance is refused due to non-compliance with Section 8.(2) of
the Act, the property Owner shall be invoiced any outstanding fees
calculated in accordance with this by-law. Payment shall be due payable
from the date of the invoice.
7.10
Where any fees set out in this By-law remain unpaid 15 days after the due date,
the amount unpaid shall be added to the tax roll and collected as taxes.
Refunds of Fees and Deposits
7.11
Except for revoked permits, where a project is withdrawn or abandoned by the
Owner and upon written request by the Owner, the Chief Building Official may
determine the applicable refund available, in accordance with the refund provisions
of this By-law, and issue a refund to only the party that made payment to the
Town.
Part 8.
TRANSFER AND RENEWAL OF PERMITS
8.1
If the Owner of the land changes subsequent to the issuance of a Permit and prior
to the final inspection related thereto, the Permit may be transferred to the new
Owner (the transferee) of the subject lands upon the submission of an application
in accordance with the requirements of Part 4 of this By-law, and where such
application is accompanied by the following:
8.1.2 Proof of ownership of the subject lands by the transferee;
8.1.3 written confirmation from the Designer, Architect and/or Professional
Engineer or such other qualified person referenced in the original
application that such person or firm has been retained to continue to provide
the stated services in respect of the application (if such services continued
to be required under the Act or Building Code) or the name, address,
telephone number of the Designer, Architect and/or Professional Engineer
or such other qualified person and where applicable the written confirmation
of such person or firm that they have be retained in relation to the
application;
8.1.4 the payment of applicable fees set out in Part 7 of this By-law.
8.2
Upon the issuance of a transfer of Permit to the transferee, the transferee shall be
deemed to be the Permit Holder and the original Permit Holder shall have no
further rights or obligations to the Town under the Permit save and except for any
obligations set out in an agreement entered into under Section 8.(3).(c) of the Act.
8.3
Whereupon the Chief Building Official allows an abandoned Permit, as
determined by section 4.17.3 of this By-law, to be renewed. The Owner shall pay a
administrative renewal fee prescribed in the list in Schedule "C - 2" of this By-
law in the first month of January after 12 months' time has elapsed from the
date of Permit issuance, or the date of the last recorded inspection, whichever
is later, and each subsequent January thereafter until such time that the
Permit file is deemed closed by the Chief Building Official.
Part 9.
NOTICES FOR INSPECTIONS
9.1
The Permit Holder shall provide Inspection notices required by the Building Code
and this By-law in writing, or by telephone to the Town using the phone number or
e-mail address indicated on the Permit card issued.
9.2
Prescribed (Mandatory) Inspection notices are required to be submitted by the
Permit Holder a minimum of;
9.2.1 five business days prior to the stages of construction specified therein for
Sewage Systems in accordance with the requirements of sentence
1.3.5.(2) of Division C of the Building Code.
9.2.2 two business days prior to the stages of construction specified therein for all
other prescribed inspections not listed in subclause 9.2.1 of this By-law in
accordance with the requirements of sentence 1.3.5.(1) of Division C of the
Building Code.
9.3
The Permit Holder shall notify the Chief Building Official of the commencement
date of each stage of construction for which a notice is prescribed by the Building
Code.
9.4
Notwithstanding Part 10 of this By-law, the person to whom the Permit has been
issued shall notify the Chief Building Official of the date of completion of the
building or demolition work no more than two days after that date.
9.5
In addition to the notices prescribed in Article 1.3.5.1 of Division C of the Building
Code, where the Chief Building Official has notified the Permit Holder, in
writing, of those stages of construction set out in Article 1.3.5.2 of Division C of the
Building Code that are also applicable to the project for which the Permit has
been issued. The Permit Holder shall give notice two business days prior to the
readiness for inspection of those stages of construction, to the Town using the
phone number or e-mail address indicated on the Permit card issued.
9.6
All notices for inspections as described above shall not be deemed effective until
the notice is acknowledged as received by the Chief Building Official or
designate in writing or by telephone.
PART 10.
FENCING CONSTRUCTION SITES
10.1
Where, in the opinion of the Chief Building Official, a construction or demolition
site presents a hazard to the public, the Chief Building Official may require the
Permit Holder to erect such fencing to the standards and specifications that the
Chief Building Official deems to be appropriate in the circumstances.
10.2
When determining if a construction or demolition site presents a hazard to the
public and requires the erection of fencing and the type of fencing required, the
Chief Building Official shall have regard to:
10.2.1 the proximity of the construction site to occupied dwellings; and,
10.2.2 the proximity of the construction site to lands accessible to the public,
including but not limited to streets, parks and commercial and institutional
activities; and,
10.2.3 the hazards presented by the construction activities and materials; and,
10.2.4 the feasibility and effectiveness of site fencing; and
10.2.5 the duration of the hazard.
10.3
When the Chief Building Official is of the opinion that fencing is required, the
Permit Holder shall, prior to the commencement of any construction, demolition,
or placement of materials or equipment on site, erect or cause to be erected
fencing to the standards required by the Chief Building Official to enclose the
construction or demolition site for the purposes of preventing unauthorized entry on
the site. For the purposes of this section, construction or demolition site shall
include the area of the proposed construction or demolition and any area where
materials or equipment are stored or operated.
PART 11.
QUALIFICATION AND APPOINTMENTS OF BUILDING OFFICIALS
11.1
The Chief Building Official, Inspectors, and any consultants contracted as
Inspectors shall be appointed by By-law, as prescribed in the Act, for specific
duties based on the qualification and registration requirements as set out in the
Act and Building Code.
11.2
The Chief Building Official may delegate the performance of his or her duties
from time to time as occasion requires to an appointed Inspector provided the
duties assigned are limited to the scope of the Inspector's qualifications as
registered with the Ministry.
11.3
The Chief Building Official, Inspectors, and any consultants contracted as
Inspectors appointed by By-law shall conform to the Code of Conduct found in
Schedule D of the By-law, and in accordance with Section 7.1(1) of the Act.
Emergency response - temporary appointment of Inspectors
11.4
Upon receiving notice of a declared emergency, the Chief Administrative Officer
may authorize the Chief Building Official to appoint Inspectors (including the
function of revoking such appointments), under section 3 of the Building Code
Act, 1992, subject to the following conditions:
11.4.1 the Chief Administrative Officer has determined the state of emergency
has overwhelmed the Building Department's resources; and
11.4.2 prior to appointment, each candidate shall have the necessary legislated
Inspector qualifications.
PART 12. OFFENCES AND PENALTIES
12.1
Any person is guilty of an offence and is subject to a penalty in accordance with
Part 36 of the Building Code Act, 1992, S.O. 1992, c.23, as amended if the
person:
12.1.1 knowingly furnishes false information in any application under the Act, in
any certificate required to be issued or in any statement or return required to
be furnished under the Act or the regulations;
12.1.2 fails to comply with an order, direction or other requirement made under the
Act; or
12.1.3 contravenes the Act, the regulations or this By-law passed under Section 7
of the Act.
PART 13.
SEVERABILITY
13.1
If a court of competent jurisdiction should declare any section or part of a section
this By-law to be invalid such section or part of a section shall not be construed as
having persuaded or influenced Council to pass the remainder of this By-law and it
is hereby declared that the remainder of this By-law shall be valid and shall remain
in force.
PART 14.
REPEAL AND TRANSITION
14.1
By-law No. 5049 is hereby repealed in their entirety upon the date that this By-law
comes into force.
PART 15.
EFFECTIVE DATE
15.1
This By-law shall come into force and effect on the date it is passed by Council.
Read a first time, second and third time and finally passed this 16th day of April, 2024.
Judy Brown, Mayor
Susan Beckel, Clerk
Seal
SCHEDULE "A" TO BUILDING BY-LAW NO. 5145
CLASSES OF PERMITS
BUILDING PERMIT:
To comply with the requirements of section 8.(1) of the Act, a Permit issued by
the Chief Building Official to allow all types of construction or demolition,
including the following subcategories of permits listed below, as governed by the
Act and the Building Code, as amended.
CONDITIONAL PERMIT:
To comply with the requirements of section 8.(3) of the Act, a Permit issued by
the Chief Building Official to allow construction or demolition, where an
application complies with section 8.(3) of the Act. Pursuant to section 8.(3.1) of
the Act, the Chief Building Official is hereby authorized to execute the written
agreement referred to in Part 4 of this By-law on behalf of the Town where the
Chief Building Official is satisfied that the compliance required under section
8.(3) of the Act has been achieved.
DEMOLITION PERMIT:
To comply with the requirements of section 8.(1) of the Act, a Permit issued by
the Chief Building Official to allow for the demolition of all or part of a building or
structure, as governed by the Act and the Building Code, as amended.
PARTIAL PERMIT:
To comply with the requirements of section 8.(1) of the Act and pursuant to
section 7.(1)(a) of the Act. When a Permit is applied for in accordance to the
provisions of the Building By-law, where an application for a portion of a project
complies with section 8.(2) of the Act, in order to expedite work, the Chief
Building Official may grant approval for construction to proceed for a portion of
a structure. Not to be confused with a Conditional Permit issued under section
8.(3) of the Act.
SEWAGE SYSTEM PERMIT
To comply with the requirements of section 8.(1) of the Act, a Permit issued by
the Chief Building Official to allow construction of a Sewage System in
accordance with Part 8 and other applicable sections as governed by the
Building Code and the Act, as amended.
SITE SERVICING PERMIT
To comply with the requirements of section 8.(1) of the Act, a Permit issued by
the Chief Building Official to allow construction of a private water and sewer
services to be connected to public infrastructure in accordance with Part 7 and other
applicable sections as governed by the Building Code and the Act, as
amended.
CHANGE OF USE PERMIT:
To comply with the requirements of section10.(1) of the Act, a Permit issued by the
Chief Building Official to allow the Change of Use of a Building, or part thereof where
no construction is proposed in accordance with Part 10 and other applicable sections as
governed by the Building Code and the Act, as amended.
OCCUPANCY PERMIT:
To comply with the requirements of section11.(1) of the Act. Pertains to a Certificate of
Occupancy, or a final inspection report issued by the Chief Building Official in
accordance with Section 1.3 of Division C of the Building Code, as amended.
SCHEDULE "B" TO BUILDING BY- LAW NO. 5145
Plans, Specifications and Documentation Requirements
General Provisions applicable to all Projects.
Plans and Specifications shall be prepared and sealed by licensed professionals as required
by the Professional Engineers Act, Architects Act, and Building Code.
Where a project is exempted by the legislations listed above to be designed by a
professional Engineer and/or Architect. Plans and Specifications shall be prepared and
appropriately labeled and signed by persons accredited with the appropriate BCIN
qualifications as listed in the Building Code
Where a project is exempted by the Building Code to be designed by persons accredited
with the appropriate BCIN qualifications as listed in the Building Code. The property
Owner shall appropriately label the drawings they are taking responsibility for.
Type 1 Projects
New construction of, addition to, or alteration to the following building uses are considered
Type 1 Projects;
Single Detached homes,
Semi-detached homes,
Town Homes,
Duplexes, and
Any ancillary buildings or structures servicing the above noted uses
The following plans and specifications, as applicable to the scope of works proposed are
required for Type 1 Projects;
Plot Plan, based off a recent survey, for the purposes of demonstrating
zoning compliance
Grading and Site Services Plan, sealed by a Licensed Professional Engineer
Architectural,
Structural,
HVAC,
Electrical Layout; and,
Additional Sections, Plans, Details, or Specifications as determined by the scope
of the work involved, for example, but not limited to;
- Details sealed (by P. Eng.) for engineered manufactured products, i.e.
trusses,
- Site Design for spatial separation, exposed building face and drainage
patterns,
- Site, Profile, and Section Plans with specifications showing location of
proposed or existing Sewage System and such features (buildings, wells,
etc...) both on the property and neighboring properties, that govern the design
and location of a Sewage System.
- Technical details of an existing Sewage System (class, size, age, etc..)
- Site, Profile and Section Plans with specifications showing location of
proposed or existing private water and sewer services and such features on
the property, neighboring properties, and municipal right of ways that govern
the design and location of a private water and sewer system as governed by
Part 7 of the Building Code and the Act, as amended.
- Ventilation Design Summary and Heat Loss and Gain Calculations,
- Energy Efficiency Design Summary form for Part 9 Residential Houses,
- Lighting, and smoke and carbon monoxide detectors layouts
Also see additional form requirements for all projects at the bottom of this schedule
Noting that for alterations, repairs and minor additions the Chief Building Official
may accept less.
Type 2 Projects
New construction of, addition to, or alteration to the following buildings, or structures are
considered Type 2 Projects;
- Industrial,
- Commercial,
- Institutional,
- Multi-Residential (not listed above),
- Designated Structures, as defined by the Building Code, and
- Any ancillary building or structures servicing the above noted uses.
- Temporary Structures regulated by the Building Code.
The following plans and specifications, as applicable to the scope of works proposed are
required for Type 1 projects;
- Plot Plan, based off a recent survey, for the purposes of demonstrating
zoning compliance
- Grading and Site Services Plan, sealed by a Licensed Professional Engineer
- Architectural,
- Structural,
- Mechanical,
- Electrical Layout; and,
- Additional Sections, Plans, Details, or Specifications, for example, but not
limited to;
- Fire Access route design with hydrant locations, or on site water supply,
- Site Storm and Sanitary layouts,
- Site, Profile and Section Plans with specifications showing location of
new or existing Sewage System and such features (buildings,
wells, etc...) both on the property and neighboring properties, that
govern the design and location of a Sewage System.
- Technical details of an existing Sewage System (class, size, age, etc..)
- Site, Profile, and Section Plans with specifications showing location of
proposed or existing private water and sewer services and such
features on the property, neighboring properties, and municipal right of
ways that govern the design and location of a private water and sewer
system as governed by Part 7 of the Building Code and the Act, as
amended.
- Details sealed (by P. Eng.) for engineered manufactured products, i.e.
trusses,
- HVAC,
- Energy Efficiency Design SB10 forms (Part 3 or Part 9 Non-Residential
Buildings),
- Plumbing,
- Sprinklers,
- Lighting, interior and exterior,
- Emergency Lighting system, and
- Fire Alarm system
Also see additional form requirements for all projects at the bottom of this schedule
Noting that for alterations or repairs the Chief Building Official may accept less.
All Projects - Additional Forms and Documents (where applicable)
Property owner's Letter of Authorization appointing an agent
Commitment to General Review signed by all project team disciplines
Building Code Data Matrix
Geotechnical Investigation Report
Copies of authorizations/permits from other approving agencies (Applicable Law
approvals)
Such other information as may be deemed necessary by the Chief Building
Official to determine whether the proposed construction, demolition, or change
of use conforms to the Act, and the Building Code
On-site Sewage System supporting documentation for new, repair or
replacement, or a change of use or property development
1. Statement of Design form
2. Designs and Specifications of new system
3. Lab Report classifying the soils for the purposes of determining percolation time in
accordance with the Unified Soils Classification System
4. A Site Evaluation Report which shall include all of the following items:
include the date the evaluation was done;
include name, address, telephone number and signature of the person
who prepared the evaluation;
include a scaled map of the site showing:
the legal description, lot size, property dimensions, existing rights-
of-way, easements or municipal / utility corridors;
the location of items listed in Part 8 of the Ontario Building Code;
the location of the proposed sewage system;
the location of any unsuitable, disturbed or compacted areas;
proposed access routes for system maintenance;
depth to bedrock;
depth to zones of soil saturation;
soil properties, including soil permeability, and
soil conditions, including the potential for flooding.
This required information is in addition to any information specified in Parts 4 and 5 of By-law
No. 5049.
SCHEDULE "C - 1" TO BY- LAW NO. 5145
FEE CALCULATION AND REFUND PROVISIONS OF PERMIT AND
ADMINISTRATIVE FEES
General Fee Calculations Provision
(1) The total sum of all applicable fees and charges listed in Schedule "C - 2" of this
By-law that, in the opinion of the Chief Building Official, most closely reflects
the scope and nature of a proposed project, shall be used to determine the total
of Permit fees to be collected.
(2) The following method establishing the total gross area shall be used;
a) Each floor area, shall be measured between the outside surfaces of exterior
walls, or between the outside surfaces of exterior walls and the centre line of
Firewalls or Party Walls. For structures like Mezzanines, Decks/Porches, and
Loading Docks the area shall be measured between the platform edge to
platform edge, or between the platform edge to an abutting wall face. The
summation of these calculations shall be considered the total gross floor area.
No deductions shall be made for openings within a Floor, i.e. stairwells,
elevator shafts, service shafts (ducts, etc.).
b) In the case of canopy roof structures, similar to carports, the area measured
shall be measured between the roof fascia edge to roof fascia edge, or
between the roof fascia edge to an abutting wall face. No deductions shall be
made for service penetrations, such as chimneys, and design features such as
skylights, etc...
c) A horizontal plane may be projected over sloping and stepped areas of floors,
or canopy roof structures to determine gross area in lieu of actual surface area.
d) In the case of interior finishes, alterations or renovations, gross area of
proposed work is the actual space receiving the work, e.g. tenant suite.
e) In addition to the above, where multiple building occupancy uses are shown on
the permit drawings. The gross floor area of each different occupancy use shall
be calculated separately so that the corresponding fee listed in Schedule "C -
2" of this By-law can be applied; and,
i.
ancillary floor areas such as, storage rooms or closets, washrooms,
mechanical spaces, etc... shall be included in the overall floor area of the
occupancy use to which they primarily serve, are located in, or accessed
from; and,
ii.
In the case of shared floor areas, such as corridors, foyers, vestibules, etc.
that service two or more occupancy uses, the total gross area of the shared
floor area shall be added to the total gross floor area of the occupancy use
with the greatest fee value listed in Schedule "C - 2" of this By-law; and,
iii.
In the case of common element floor areas, such as, basements,
mechanical rooms, etc. that service two or more occupancy uses, the total
gross area of the common floor area shall be added to the total gross floor
area of the occupancy use with the greatest fee value listed in Schedule
"C - 2" of this By-law.
(3) In the case of renovations, internal demolitions required to facilitate, and are a part
of the renovation project shall be exempt from fees. Where a demolition Permit is
required in advance of the renovations for the purposes of site condition
investigation, the permit fee for the subsequent Permit issued for renovation shall
be adjusted as to reflect a reduction of the fee to a value equal to the fees
collected at the issuance of the demolition Permit.
Fee Refund Provisions
(1) Refunds of fees collected under the authority of this By-law, shall be provided in
accordance with sentences (2), and (3) listed below, where;
a) Building Permits have been issued, but no construction has commenced,
b) Building Permits have not been revoked,
c) Building Permit Applications have not expired,
d) Requests for refunds must be submitted to the Chief Building Official in
writing who will determine the amount of fees, if any, that may be refunded.
(2) The amount of fees refundable shall be calculated based on the total of fees
collected under the authority of this By-law, as follows:
a) 75 percent of all fees, except for non-refundable administrative fees and other
enforcement costs, are refundable if Applicant cancels application prior to
release of Permit for issuance;
b) 50 percent of all fees, except for non-refundable administrative fees and other
enforcement costs, are refundable if the Applicant cancels the Permit after
Chief Building Official has released the Permit for issuance;
c) Refunds will be further reduced by 10% for each inspection performed after
permit issuance until 100% is achieved. Then no further refund is available.
SCHEDULE "C - 2" TO BY- LAW NO. 5145
TABLE OF FEES
2025 Building Permit Fees- Effective February 18, 2025
Table 1 - Project Minimum - Fees (per application)
Residential project
Detached Garage
$ 590.00
Creation of a new dwelling unit
$ 590.00
New Basement Install
$ 590.00
Carport
$ 590.00
Foundation Repair (Structural)
$ 265.00
Deck, verandah, landing
$ 265.00
Foundation Repair (Non Structural)
$ 265.00
All Construction project
Addition to a building
$ 590.00
Minimum Fee for projects not listed above
$ 265.00
Table 2 - New Construction and Additions - Area Fees (area fee = $/Ft2)
Group A
Civic Performing Arts, Galleries, Museums
$ 3.10
Civic Centers, Community Centers, Recreation
Centers, Libraries, Arenas, Courthouses, Places of
Worship, Universities, Colleges, Lecture Halls
$ 2.65
High Schools, Technical Schools, Movie Theatres,
Restaurants.
$ 2.65
Elementary Schools, Day Care.
$ 2.65
Group B
Acute Care Hospitals, Laboratories.
$ 3.60
Penitentiaries, Detention Facilities.
$ 2.65
Nursing Homes, Long Term Care Residences.
$ 2.65
Group Homes, Custodial Residences.
$ 2.65
Group C
Single Detached, Semi Detached, Apartment
Buildings, Condos, Hotels, Inns, Assisted Living,
Senior's Residences.
$ 2.50
Row Townhouses/Stack Townhouse, Motels.
$ 1.95
Residential Garages (detached and attached).
$ 1.60
Decks, Porches, Veranda's.
$ 1.05
Finished Basement area for new build.
$ 0.90
Unfinished Basement area for new build
$ 0.55
Group D/E
Medical Centers, Clinics, Civic Administration,
Police Stations, Banks, Indoor Malls.
$ 2.65
Offices, Restaurants.
Office Building Shell.
Strip Plazas, Stores, Supermarkets, Exhibition
Halls, Retail Outlets, Car Dealerships.
$ 2.65
Group F
Fire Stations, Gas Stations, Car Wash, Vehicle
Maintenance & Admin.
$ 2.65
Heavy, Specialized Industrial and Utilities
(Breweries, Distilleries etc.).
$ 2.65
Group F
Light Industrial, Warehouses, Service Floors,
Mezzanines, Underground Parking Garages.
$ 2.65
Storage Structures, Enclosed Shelters, Above
Ground Parking Garages.
$ 2.65
Table 3 - Renovations - Fees (fee type varies)
Group C
New Apartment Units. (area fee = $/Ft2)
$ 2.50
Residential Additions. (area fee = $/Ft2)
$ 2.50
Renovation of All Buildings
All renovations to existing spaces in Group A, B, C,
D, E, F Occupancies (fee=% of project value)
3.90%
Table 4 - Service Systems and Conditional Permit - Fees (fee type varies)
Service System
New HVAC install (per unit)
$ 325.00
Service System
Plumbing Fee (per fixture)
$ 24.00
Conditional Permit
Conditional Permit - All Development Charges
collected at the time of permit issuance.
(per application)
$ 540.00
Table 5 - Admin and Project Specific Minimum Total - Fees (fee type varies)
Project /Documentation
Alternative Solution Request Reviews.
(per report submitted)
$ 265.00
Revision of Permit (per revision)
$ 265.00
Extra inspections or after re-inspection.
(per inspection)
$ 150.00
Letter of Conformance to other Agency (per letter)
$ 140.00
Building Compliance Report (FILE SEARCH
REQUESTS) Plus $0.25 per 8 1/2X11 photo copies
(per request and per property or suite)
$ 140.00
Transfer of Permit (per request)
$ 140.00
Project Specific Minimum
New Building ≤ than 300m2 gross floor area (GFA)
$ 1,215.00
New Building between 301m2 to 599m2 of GFA
$ 2,429.90
New Building > than 600m2 of GFA
$ 3,644.80
SCHEDULE "D" TO BY-LAW NO. 5145
CODE OF CONDUCT FOR BUILDING OFFICIALS
Preamble
The Code of Conduct applies to the Chief Building Official and Inspectors appointed
under the Building Code Act in the exercise of a power or the performance of a duty
under the Building Code Act or the Building Code. The purpose of the Code is to
promote appropriate standards of behavior and enforcement actions to ensure building
officials apply standards of honesty and integrity, and to prevent practices constituting an
abuse of power including unethical or illegal practices.
Standard of Conduct
Building Officials undertake to:
1. Always act in the public interest, particularly with regard to the safety of building
works and structures.
2. Not to act where there may reasonably appear to be a conflict between their duties
to their employer, their profession, their peers and the public at large and their
personal interests.
3. Apply all relevant building by-laws, codes and standards appropriately and without
favour.
4. Perform their inspections and plan examination duties impartially and in
accordance with the highest professional standards.
5. At all times abides by the highest moral and ethical standards and avoiding any
conduct, which could bring or tend to bring Building Officials into disrepute.
6. Comply with the provisions of the Building Code Act, the Ontario Building Code
and other Acts or Laws that regulate or govern Building Officials or their functions.
7. Not to act beyond their personal level of competence, of Building Code, the
qualifications they have attained, or outside their area of expertise.
8. Maintain current accreditation to act as an Ontario Building Official.
9. Maintain their knowledge and understanding of the best current building practices,
the building laws and Codes relevant to their inspection and plan examination
function.
10. Extend professional courtesy to all.
11. To abide by a code of conduct applicable to all Town of Perth employees.
Breaches of the Code of Conduct
The Building Code Act provides that the performance of Building Officials will be
measured against this code of conduct. Contradictions of this Code of Conduct are a
serious matter and will be dealt with as such, in an expeditious and fair manner. The
Chief Building Official will review allegations made against an Inspector and the Chief
Administrative Officer will review any allegations against the Chief Building Official.
All complaints concerning an alleged breach of this Code shall be submitted in writing to
the Chief Building Official or the Chief Administrative Officer as appropriate.
If a complaint is substantiated, the Chief Building Official in the case of complaints
against Inspectors, or the Chief Administrative Officer in the case of a complaint against
the Chief Building Official, will determine the corrective action and / or disciplinary
action arising from violation(s) of this Code of Conduct. Any action taken as a result of a
confirmed breach of this Code will be based on the severity and / or frequency of the
violation in accordance with relevant employment standards and may include, but is not
limited to the following:
an apology;
counseling;
education and training;
warning;
suspension / leave without pay;
demotion;
transfer;
dismissal.