Fees and Charges By-law 112-2025, Schedule R - Building/Permit Fees (2026)

Saugeen Shores, Ontario · No. 112-2025 · summary & facts

This is the exact embedded text of the captured official document. Snapshot bf26a562dda5 · verified 2026-09-27 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

222 Permit Fees Permit Type Residential Building / Addition / Renovation - Finished Space Fee Minimum permit fee $170.13 $9.63 per m2 Building / Addition / Renovation - Unfinished Space $6.24per m2 Finishing Basement (Unfinished to Finished Space) Decks and Porches Garages and Shops (Accessory to main building) $3.38 per m2 $6.24 per m2 $6.24 per m2 Plumbing Fixtures/Appliances Hot Water Tank Building Drain Roof Leaders/Hoppers Interceptors Sanitary Sewers Building Storm Drains Water Supply System Waste & Vent Stack Sewer/Water Connection Note: Plumbing fees listed above will also be applied to permits where applicable Commercial, Industrial, Institutional Commercial Building (Group D & E) Assembly & Institutional (Group A & B) Industrial (Group F1, F2 & F3) Kitchen Hood Exhaust Retro-fit Sprinkler Fit-Up Permit Farm Buildings Livestock Building Implement / Hay Storage Liquid Manure Storage Solid Manure Storage Special Accessory Structures-Silos, Granary, Corn Crib Septic Systems Class 2, 3, 4 or 5 New System / Full Replacement Class 4 or 5 Tank or Bed Replacement Class 4 Leaching Bed Repair Minimum permit fee $170.13 $15.73 $15.73 $15.73 $15.73 $15.73 $22.29 $22.29 $22.29 $26.22 $131.12 $11.51 per m2 (min $170.13) $12.63 per m2 (min $170.13) $8.69 per m2 (min $170.13) $393.35 $16.52 per head - $500 minimum fee $279.55 $3.82 per m2 (min $170.13) $3.30 per m2 (min $170.13) $458.91 $327.79 $262.23 $753.92 $393.35 $402.13 Demolition/Decommission Permit Building Alternate/Change of Use Revision or Renewal of Permit $180.95 $268.09 $113.67 Planning Review and Assessment $282.54 per lot Refunds Building without a permit is subject to a penalty of 50% of the permit value to a maximum of $5,000. If a refund is required, 50% of the permit fee will be retained if the permit has been issued to a minimum of $170.13. An additional $170.13 will be retained if a site visit has occurred. This edition is prepared for convenience only. For accurate reference please refer to Schedule R of the Fees and Charges By-law 112-2025 You may qualify for a sign permit fee reduction if the land is located within downtown Port Elgin or downtown Southampton. Fees in these areas are 50 per cent of the required fee. Over 60 m2 And Less Than 225 m2 Fee $110.21 per sign $393.35 $177.01 $177.01 $177.01 $102.84 $170.13 $10.00 (per $1,000 of construction value) $131.12 $104.89 $607.29($537.42 plus HST) $134.39 $114.79 $168.98 Permit Type Signs Erection Fees for Signs Minor Variance Application for Sign By-law Demolition of Building Swimming Pool Fence Wood Burning System Tent Other Minimum Permit Fee Value Fee (when area fees do not apply) Change of Use (Subject To Zoning By-Law) Re-inspection Water Meter Occupancy Permit Letter of Compliance Letter of Compliance in less than 48 hours Maintenance Fee on open permits (365 days) Liquor License Inspection Transfer of Permit Driveway Permit Fee Residential Lot Grading Review $100.00 (per permit) $126.69 $104.90 $321.36 (includes $200 refundable deposit) $340.03 Footings & Foundation-Conditional Permit Fee $2.52 per sq. m; Minimum Fee $300 Designated Structure (As Defined In Section 1.3.1.1 Of The OBC) $12.63 per sq m; Minimum Fee $170.13 Plus $20.00 Per $1000 Of Estimated Project Value