Building & Demolition Permits

Schreiber, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 9b9687c02c63 · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Skip to content Skip to main navigation Skip to footer # BUILDING & DEMOLITION PERMITS Building permits are required under the **Ontario Building Code Act, 1992** to ensure construction work meets minimum health, safety, structural, and accessibility standards. The Township of Schreiber reviews permit applications to confirm compliance with: * The **Ontario Building Code** * Applicable **Township of Schreiber by-laws** * Other **applicable law** as defined by provincial regulation A building permit must be issued **before construction begins**. WHEN A BUILDING PERMIT IS REQUIRED Building permits in the Township of Schreiber are required for constructing new buildings over **10 m²,** renovations, additions, or changing building usage. Applications and forms are available through the municipality, and building must comply with the Ontario Building Code, Zoning By-laws, and Fire Codes. * Constructing a new building or structure * Additions or renovations to an existing building * Alterations to load-bearing or structural components * Installation or modification of plumbing systems * Demolition of all or part of a structure * Changes in the use or occupancy of a building ⚠️ **Starting construction without a required permit may result in enforcement action under the Building Code Act.** TYPES OF PERMITS A single project may require more than one permit. Applications may be reviewed together where applicable. #### BUILDING PERMIT Required for construction and renovations. --- * Constructing a new building, garage, or accessory structure * Building an addition, deck, porch, or sunroom * Renovating or altering interior or exterior spaces where building systems are affected #### PLUMBING PERMIT For the installation, alteration, or extension of plumbing systems. --- * Installing or relocating plumbing fixtures (toilets, sinks, tubs, or showers) * Altering water supply, drain, waste, or vent piping * Plumbing work associated with renovations or additions #### RENOVATION PERMIT For load-bearing elements or the structural integrity of a building. --- * Removing or altering load-bearing walls or structural components * Major interior renovations that change the layout or use of a space * Reinforcing or modifying structural elements such as beams, columns, or floors #### DEMOLITION PERMIT Required for the demolition of all or part of a building or structure. --- * Demolishing a house, garage, or accessory structure * Removing a portion of a building as part of a renovation or redevelopment * Demolishing a structure prior to new construction ## PERMIT PROCESS PRE-CONSULTATION #### **Before You Apply** Before submitting a building permit application, applicants are encouraged to review and complete the **Building Permit Pre-Checklist**. This checklist helps ensure your application is complete and ready for review. Pre-consultation helps reduce delays caused by incomplete applications. Pre-consultation can help determine: * Which permits are required * Whether zoning or planning approvals are needed * What drawings or documentation must be submitted * Whether other approvals under "applicable law" are required --- #### **How to Complete the Pre-Checklist** The Building Permit Pre-Checklist can be completed in one of the following ways: * **Download and print** the checklist and complete it by hand 👉 **Building Permit Pre-Checklist (PDF)** Once completed, the checklist may be: * **Submitted in person** at the Municipal Office, or * **Emailed** to the Township's **Accounts Receivable** department: **accountsreceivable@schreiber.ca** --- #### **Starting Work Without a Permit** Starting construction without a required permit is an offence under the **Ontario Building Code Act** and may result in: * Stop-work orders * Fees or penalties * Removal or correction of unapproved work APPLICATION REQUIREMENTS To apply for a building permit under the **Ontario Building Code Act**, applicants must submit a **complete application package**. Incomplete applications cannot be reviewed and may result in delays. A complete application package typically includes: * A **completed Building Permit Application** * The **Building Permit Pre-Checklist**, where applicable * **Detailed plans and drawings** appropriate to the scope of work *(such as site plans, floor plans, elevations, and structural details)* * Any required **zoning, planning, or other Applicable Law approvals** * **Designer information**, including BCIN number, architect, or professional engineer details, where required * **Applicable permit fees** --- **Zoning & Planning Approvals** * A building permit does not replace zoning or planning approvals. * Some projects may require zoning review or approval before a building permit can be issued. 👉 **View the Zoning & Land Use page** --- **Building Permit Application** The Building Permit Application can be completed in one of the following ways: * **Download and print** the application below and complete it by hand Once completed, the application must be: * **Submitted in person** at the Municipal Office to **Accounts Receivable** * **Permit fees must be paid before the application can be reviewed.** --- **Important Notes** * The Building Permit Pre-Checklist is intended as a **guide only** and does not guarantee permit approval * Additional information or documentation may be required depending on the project * Municipal staff may request revisions or clarification during the review process --- **Download Forms** 👉 **Building Permit Application (PDF)** 👉 **Building Permit Pre-Checklist (PDF)** REVIEW & APPROVAL PROCESS #### **Review & Approval Process** Once a complete application package is submitted and applicable fees are paid, the application is reviewed under the authority of the Township's **Chief Building Official (CBO)** in accordance with the **Ontario Building Code Act**. The review process generally includes: 1. **Application Completeness Review** Municipal staff review the submission to confirm all required forms, drawings, documentation, and fees have been provided. 2. **Technical Review by the Chief Building Official** The Chief Building Official, or a designated building official, reviews the application and plans for compliance with: * + The Ontario Building Code + Applicable Township of Schreiber by-laws + Other requirements under **Applicable Law**, where relevant 3. **Requests for Additional Information** If required, the applicant may be contacted to provide clarification, revisions, or additional documentation before the review can continue. 4. **Permit Decision** Once all requirements are satisfied, the Chief Building Official may issue the building permit, or provide direction on required changes prior to issuance. * Processing times vary depending on the scope of the project and the completeness of the application. * Issuance of a building permit authorizes construction **only as described in the approved plans**. INSPECTIONS #### **Inspections** Inspections are required at various stages of construction as outlined by the Ontario Building Code. * The permit holder is responsible for requesting inspections * Work must not proceed beyond required inspection stages without approval * Inspection requirements will be provided at the time of permit issuance **Failure to obtain required inspections may result in delays or enforcement action.** FEES & CHARGES | | | | --- | --- | | DESCRIPTION | FEE | | Building Permit | $12.55 per $1,00.00 or part thereof the assessed value of the work, with a minimum fee of $125.15 | | Demolition Permit | $119.95 | | Change of Use Permit | $234.70 | | Revision, assignment or renewal of Permit | $124.30 | | Occupancy Permit | $54.30 | | Additional inspections (each) | $124.30 | ## ROLE OF THE CHIEF BUILDING OFFICIAL The Township of Schreiber's **Chief Building Official (CBO)** is responsible for administering and enforcing the **Ontario Building Code Act** and applicable building-related by-laws. The CBO's responsibilities include: * Reviewing permit applications and issuing permits where requirements are met * Coordinating and conducting required inspections * Enforcing compliance with the Ontario Building Code and applicable by-laws * Providing information and interpretation of building requirements to the public and professionals Approval of a permit confirms compliance **only as submitted and approved** and does not relieve owners or contractors of their responsibility to comply with all applicable laws. ## CONTACT US ### The official logo of the Township of Schreiber, featuring a red train, green pine trees, rock cuts, water, and the town name. **ACCOUNTS RECEIVABLE / UTILITY BILLING** **BREE-LYN MULLIGAN**P.O Box 40204 Alberta St., Schreiber, ON P0T 2S0 **Phone:** (807) 824-2711 ext. 220 **fax:** (807) 824-3231 **Email:** accountingclerk@schreiber.ca 🕒 **Office Hours:** Monday - Friday: 8:30 AM - 4:30 PM Closed on weekends & holidays * HOME * COUNCIL & GOVERNANCE + Mayor & Council + Council Meetings + Agendas & Minutes + Municipal Elections + Budgets & Financial Reports * BYLAWS & PLANNING + Bylaws & Policies + Zoning & Land Use + Reports & Studies + Strategic & Community Planning + Water, Wastewater & Stormwater Reports + Infrastructure, Assets & Energy Plans + Land Use & Planning + Economic Develpment Initiatives + Property Records + Fees & Charges * PERMITS & LICENCES + Business Vendor Permits + Building & Demolition Permits + Burning Permits + Pet Licences + Lottery Licences * MUNICIPAL SERVICES + Cemetery Services + Memorial Bench Program * OPPORTUNITIES + Bids & Tenders + Municipal Job Postings