 "answer": "In the Township of Seguin, Ontario, building permit rules are set by Building By-law No. 2019-031, verified 2026-09-25. Permit required for: Construction, demolition, conditional and change of use of buildings, as set out in Schedule A. Permit fees: As set out in Schedule A; e.g. $11 per $1000 of CV, $125/ft2 of finished floor area, minimum $150. Fees set in: Schedule A of the Fees and Charges By-law.",
 "municipality_id": "gx-001741",
 "municipality": "Seguin",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.seguin.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-law No. 2019-031",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2019-04-01",
   "document_url": "https://seguin-media-378010997338.s3.ca-central-1.amazonaws.com/s3fs-public/2026-02/Building-By-law-No.-2019-031.pdf",
   "summary": "Township of Seguin's own Building By-law under s.7 Building Code Act, 1992, respecting construction, demolition, change of use, inspections and fees; sets classes of permits, application requirements and the permit fee schedule. Repeals By-law 2018-018. Enacted April 1, 2019.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "59ea0936720d61a00cb8d1b0a5664c70b225b73d81169610d844a71d80c8548b",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "2019-031",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/59ea0936720d61a00cb8d1b0a5664c70b225b73d81169610d844a71d80c8548b.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction, demolition, conditional and change of use of buildings, as set out in Schedule A.",
    "fee_basis": "As set out in Schedule A; e.g. $11 per $1000 of CV, $125/ft2 of finished floor area, minimum $150.",
    "fees_location": "Schedule A of the Fees and Charges By-law",
    "authority": "Chief Building Official"
   },
   "fact_citations": {
    "permit_required_for": "s. 3.1",
    "fee_basis": "Schedule A",
    "fees_location": "s. 3.2",
    "authority": "s. 2.1.8; s. 10.5"
   },
   "transcript_url": "/ca/on/seguin/building-permits/bylaw-2019-031/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/seguin/building-permits/"
}