THE CORPORATION OF THE TOWN OF SOUTH BRUCE PENINSULA
BY-LAW NUMBER 65-2012
Being a By-Law Respecting Construction, Demolition, Change of Use,
Occupancy Permits and Inspections.
WHEREAS Section 7 of the Building Code Act, S.O. 1992, c. 23, as amended, empowers
municipal councils to pass by-laws respecting construction, demolition and change of use
permits, inspections and related matters.
AND WHEREAS Section 35 of the Building Code Act, S.O. 1992, c. 23, as amended provides
that the Act and the Building Code supersede all municipal by-laws respecting the construction
or demolition of buildings;
AND WHEREAS Section 3(1) of the Building Code Act, S.O. 1992, c. 23 provides that the
council of each municipality is responsible for the enforcement of this Act in the municipality;
AND WHEREAS Section 3(2) of the Building Code Act, S.O. 1992, c. 23 provides that the
council of each municipality shall appoint a Chief Building Official and such inspectors as are
necessary for the enforcement of this Act in the areas in which the municipality has jurisdiction;
AND WHEREAS all fees shall be in accordance with Schedule "D" of this By-law. The fees are
calculated in accordance with the requirements of Section 7 and the Regulations under the
Ontario Building Code/Act.
AND WHEREAS this By-Law shall repeal and supersede any By-Law not consistent with this
By-Law.
AND WHEREAS all fees in this By-law supersede any by-law or fee in any other by-law not
consistent with this by-law;
NOW THEREFORE the Council of the Corporation of the Town of South Bruce Peninsula
enacts as follows:
1.
SHORT TITLE
This by-law may be cited as the "Building By-law".
2.
DEFINITIONS
(1) In this By-law:
"Act" means the Building Code Act, S.O. 1992, c.23, as amended.
1
"applicable law" means applicable law as described in Div. A Part 1, Sentence 1.4.1.3. of the
Ontario Building Code, 2006.
"applicant" means the owner of a building or property who applies for a permit or, a person
authorized by the owner to apply for a permit on the owners behalf, or any person or corporation
empowered by statute to cause the demolition of a building or buildings and anyone acting under
the authority of such person or corporation.
"architect" means a holder of a license, a certificate of practice, or a temporary license under the
Architect's Act as defined in the Building Code;
"as constructed plans" means as constructed plans as defined in the Building Code;
"building" means (as per the Building Code/Act)
a) a structure occupying an area greater than ten square metres consisting of a wall, roof and
floor or any of them or a structural system serving the function thereof including all
plumbing, works, fixtures and service systems appurtenant thereto,
b) a structure occupying an area of ten square metres or less that contains plumbing,
including the plumbing appurtenant thereto,
c) plumbing not located in a structure,
c.1) a sewage system; or
d) structures designated in the Building Code.
"Building Code" means the regulation made under Section 34 of the Act.
"Chief Building Official" means the person appointed as such by the Council of the Corporation
under Section 3 of the Act.
"code of conduct" means a code of conduct described in Section 7.1 of the Act. Refer to
Schedule "C" for the code of conduct for Chief Building Officials.
"complete" means a building permit application in accordance with Div. C Part 1 Section 1.3. of
the Building Code, 2006 submitted with all required approvals appended in order to comply with
the building permit timelines as noted in Div. C. Part 1, Article 1.3.1.3. of the Building Code;
"construct" means to do anything in the erection, installation, extension or material alteration or
repair of a building and includes the installation of a building unit fabricated or moved from
elsewhere and "construction" has a corresponding meaning.
"Corporation" means The Corporation of the Town of South Bruce Peninsula.
"Inspector" means an Inspector appointed under section 3, 3.1, 4, 6.1 or 6.2 of the Ontario
Building Code/Act.
"owner" means the registered owner of the land and includes a lessee, mortgagee in possession,
and the person in charge of the property.
2
"permit" means permission or authorization given in writing by the Chief Building Official to
perform work regulated by this by-law, the Building Code/Act, or to occupy a building or part
thereof.
"Principal Authority" means,
(a) the Crown,
(b) the council of a municipality,
(c) an upper-tier municipality that has entered into an agreement under subsection 3(5),
6.1(1) or 6.2(1) of the Building Code/Act,
(d) a board of health that has been prescribed for the purposes of subsection 3.1(1) or has
entered into an agreement under subsection 6.1(2) or (3) or 6.2(2) of the Building
Code/Act,
(e) a planning board that has been prescribed for the purposes of subsection 3.1(1) of the
Building Code/Act, or
(f) a conservation authority that has been prescribed for the purposes of subsection
3.1(1) or has entered into an agreement under subsection 6.2(2) of the Building
Code/Act.
"permit holder" means the person to whom the permit has been issued and who assumes primary
responsibility for complying with the Building Code/Act.
(2)
Terms not defined in this By-Law have the meaning ascribed to them in
the Building Code.
3.
CLASSES OF PERMITS - Ontario Building Code Act, Section 7(a)
Classes of permits with respect to the construction, demolition, change of use and permit fees
shall be as set out in Schedule "D" to this By-law.
4.
APPLICATION FOR PERMIT - Ontario Building Code Act, Section 7(b)
(1)
To obtain a permit an applicant shall file a "complete" application in writing on forms
regulated by the Province of Ontario and those required by the Chief Building Official.
(2)
Every application for a permit shall be submitted to the Chief Building Official, and
contain the following information:
(a)
Where application is made for a construction permit under Subsection 8(1) of the
Act, the application shall:
(i)
use the provincial application form, "Application for a Permit to Construct
or Demolish";
(ii)
include two complete sets of plans, specifications, forms, documents and
other information required by Div. C Part 1, Article 1.3.1.3. of the
Building Code and as prescribed in this by-law for the work to be covered
by the permit;
3
(iii)
include the proposed or existing occupancy of all parts of the building; and
(iv)
include the required fee as prescribed by Schedule "D" to this By-law.
(b)
Where application is made for a demolition permit under Subsection 8(1) of the
Act, the application shall:
(i)
use the provincial application form, "Application for a Permit to Construct
or Demolish";
(ii)
include two complete sets of plans, specifications, forms, documents and
other information required by Div. C Part 1, Article 1.3.1.3. of the
Building Code and as prescribed in this by-law for the work to be covered
by the permit;
(iii)
include the existing occupancy of all parts of the building;
(iv)
include the required fee as prescribed by Schedule "D" to this By-law.
(c)
Where application is made for a conditional permit under Subsection 8(3) of the
Act, the application shall:
(i)
use the provincial application form, "Application for a Permit to Construct
or Demolish";
(ii)
include two complete sets of plans, specifications, forms, documents and
other information required by Div. C Part 1, Article 1.3.1.3. of the
Building Code and as prescribed in this by-law for the work to be covered
by the permit;
(iii)
include the proposed or existing occupancy of all parts of the building;
(iv)
include the required fee as prescribed by Sched qle "D" to this By-law;
(v)
state the reasons why the applicant believes that unreasonable delays in
construction would occur if a conditional permit is not granted;
(vi)
state the necessary approvals, which must be obtained in respect of the
proposed building and the time in which such approvals will be obtained;
include an agreement in writing by the applicant and such other persons as
the Chief Building Official determines with the Corporation dealing with
the matters required pursuant to Section 8(3)(c) of the Building Code Act;
and
(viii) state the time in which plans and specifications of the complete building
will be filed with the Chief Building Official.
(d)
Where application is made for a Change of Use permit issued under Subsection
10(1) of the Act, the application shall be submitted to the Chief Building Official
and shall:
4
(i)
use the provincial application form, "Application for a Permit to Construct
or Demolish";
(ii)
describe the building in which the occupancy is to be changed, by a
description that will readily identify and locate the building;
(iii)
identify and describe, as required by the Chief Building Official, the
current and proposed occupancies of the building of part of a building for
which the application is made;
(iv)
include, as required by the Chief Building Official, plans and
specifications which show the current and proposed occupancy of all parts
of the building and which contain sufficient information to establish
compliance with the requirements of the Building Code, including floor
plans, details of walls, ceiling and roof assemblies identifying required fire
resistance ratings and load bearing capacities and details of the existing
sewage system, if any;
(v)
include the required fee as prescribed by Schedule "D" to this By-law;
(vi)
state the name, address and telephone number of the owner; and
(vii)
be signed by the owner or his or her authorized agent who shall certify the
truth of the contents of the application.
(e)
Where application is made for a plumbing permit under Subsection (8)(1) of the
Act, the application shall:
(i)
use the provincial application form, "Application for a Permit to Construct
or Demolish";
(ii)
include the required fee as prescribed by Schedule "D" to this By-law;
(iii)
include such other information, methods and specifications concerning the
complete project as the Chief Building Official may require.
5.
REVISION TO PERMITS
After issuance of a permit under the Act, notice of any material change to a plan,
specification, document or other information on the basis of which a permit was issued,
must be given in writing; to the Chief Building Official together with the details of such
change, which is not to be made without his or her authorization.
5
6.
PLANS AND SPECIFICATIONS
1) Sufficient information shall be submitted with each application for a permit to enable the
Chief Building Official to determine whether or not the proposed construction,
demolition or change of use will conform with the Act, the Building Code and any other
applicable law.
2) Each application shall, unless otherwise specified by the Chief Building Official, be
accompanied by two complete sets of the plans and specifications required under this by-
law.
3) Plans shall be drawn to scale on paper or other durable material, shall be legible and,
without limiting the generality of the foregoing, shall include such working drawings as
set out in Schedule "A" to this By-law unless otherwise specified by the Chief Building
Official.
4) Site plans shall be referenced to an up-to-date survey and, when required to demonstrate
compliance with the Act, the Building Code or other applicable law, a copy of the survey
shall be submitted to the Chief Building Official. Site plans shall show:
(a)
Lot size and the dimensions of property lines and setbacks to any existing or
proposed buildings;
(b)
existing and finished ground levels or grades;
(c)
existing rights-of-way, easements, municipal services and fencing; and
(d)
proposed fire access routes and existing fire hydrant locations.
5) The granting of a permit, the review of the drawings and specifications or inspections
made by the Chief Building Official or an inspector shall not in any way relieve the
owner of a building from full responsibility for carrying out the work or having the work
carried out in accordance with the requirements of this by-law, the Act and the Building
Code, including ensuring that the occupancy of the building, or any part thereof, is in
accordance with the terms of this by-law and the Building Code.
6) The Chief Building Official may require that a set of plans of a building or any class of
buildings as constructed be filed with the Chief Building Official on completion of the
construction under such conditions as may be prescribed in the Building Code.
7)
Equivalents
The Chief Building Official may allow the use of materials, systems and building designs
that are not authorized in the Building Code in accordance with Section 9 (1) of the
Ontario Building Code Act.
6
7.
FEES - Ontario Building Code Act, Section 7(c)
1) Fees for a required permit shall be as prescribed by Schedule "D" to this By-law.
2) Where application is made for a conditional permit, fees shall be paid for the complete
project.
3) Where the fees payable in respect of an application for construction, demolition, and
Change of Use permit under subsection 8(1) of the Act or a conditional permit under
subsection 8(3) of the Act are based on the cost of construction of the proposed work, the
cost of construction of the proposed work shall mean the total cost of all work regulated
by the permit including the cost of all material, labour, equipment, overhead and
professional and related services.
4) The Chief Building Official may place a valuation on the cost of any proposed work for
the purpose of establishing the required permit fee. Where disputed by the applicant, the
applicant shall pay the required fee under protest and within six months after completion
of the project, shall submit an audited statement of the actual costs. Where the audited
costs are determined to be less than the valuation, the Chief Building Official shall issue a
refund for the difference.
5) Where the fees payable in respect of an application for a construction or demolition
permit issued under Subsection 8(1) of the Act or a conditional permit issued under
Subsection 8(3) of the Act are based on a floor area, floor area shall mean the total floor
space of all storeys including storeys below the first storey measured as the horizontal
area between the outside surface of all exterior walls of the building.
6) With respect to an application for a change of use permit issued under Subsection 10(1)
of the Act the change of use permit fee as prescribed by Schedule "D" to this By-law
shall be utilized when no construction is proposed or required. When construction is
proposed or required and will result in a change of use the appropriate construction
permit fee as set out in Schedule "D" to this By-law shall be utilized.
7) There will be no refund of permit fees where a permit has been revoked except in
accordance with subsection 8(1).
8) A Building Department Cost Stabilization Reserve Fund will be established for purposes
relating to the administration and enforcement of the Ontario Building Code/Act.
8. PERMIT REVOCATION AND TRANSFER
Revocation of Permit
1) Prior to revoking a permit under Clause 8(10)(b)(c) of the Act, the Chief Building
Official shall give written notice of intention to revoke a permit to the permit holder
at his last known address. If on the expiration of thirty (30) days from the date of such
notice, the grounds for revocation continue to exist, the permit may be revoked
7
without further notice, and all submitted plans and all other information may be
disposed of and a refund for permit fees paid back in accordance with Schedule "B"
to this By-law.
2) Transfer of Permit - Ontario Building Code Act, Section 7(h)
Permits are non-transferable without written consent of the Chief Building Official
and transferable only upon the new owner completing a permit application to the
requirements of Section (4) of this by-law.
NOTIFICATIONS - Ontario Building Code Act, Section 7(e)
1 With respect to "Notices & Inspections" under Div. C Part 1, Subsection 1.3.5. of the
Building Code, the owner or an authorized agent shall notify the Chief Building
Official or an inspector at least two business days (48 hours) prior to the applicable
stages of construction.
2. A notice pursuant to this section is not effective until written or oral notice is received
by the Chief Building Official.
10.
SEVERABILITY
It is hereby declared that each and every part of the foregoing provisions of this By-law is
severable. If any provision of this By-law should for any reason be declared invalid by a
Court of competent jurisdiction, it is the intention and desire of this Council that the
remaining provisions remain in full force and effect.
11.
PRESCRIBED FORMS - Ontario Building Code Act, Section 7(f)
The forms prescribed for use shall be regulated by the Province of Ontario and the Chief
Building Official.
12.
ADDITIONAL FORMS
Listed and attached as Schedule "E".
13.
PENALTY CLAUSE
Section 36 of the Building Code Act provides that a person is guilty of an offence under
the Building Code Act if a person contravenes the Building Code Act, the regulations or
this by-law.
14.
This by-law shall repeal and supersede any by-law not consistent with this by-law.
15.
This by-law shall become effective on the date of the final passing thereof
8
READ a FIRST and SECOND this 15 th day of May, 2012.
MAYOR
CLERK
READ a THIRD time and FINALLY PASSED this 15 th day of May, 2012.
9
SCHEDULE "A"
This is Schedule "A" to By-Law Number 65-2012 respecting
LIST OF PLANS, SPECIFICATIONS, DOCUMENTS AND OTHER INFORMATION TO
ACCOMPANY APPLICATIONS FOR PERMITS
Plans
-
Ontario Land Surveyors Plans
Site Plan
n
Contour of
Grade Plans
-
Drainage Plans
-
Floor Plans
U
Foundation Plans
-
Framing Plans
n
Mechanical and Electrical Plans
®
Reinforced Concrete Plans
-
Chimney and Fireplace Plans
-
Renovation and Alteration
n
As Constructed Plans
®
Fire Alarms or Evacuation Plans (within buildings)
-
Fire Protection Plans -- showing the type of fire assemblies, fire
separations, fire compartments, and fire resistance ratings within
buildings
-
Schematic Plans -- showing the type, location and operation of all
building fire emergency systems
-
On-Site Sewage System Plans
-
Truss System Layout Drawings
-
Engineered Truss Drawings
-
Engineered Floor/Roof System Layout Drawings
-
Roof Plans
-
Reflected Ceiling Plans
-
Sections and Details
-
Building Elevations
®
Heating, Ventilation and Air Conditioning Drawings and calculations
-
Sprinkler System Drawings
-
Plumbing Drawings
-
Mechanical Drawings
-
Site Service Drawings
-
Food Premise Layout Drawings
-
Structural Drawings
-
Structural Design Load Summary
-
All Related Engineering and Architectural
Reports/Plans/Drawings/Documents/Schedules/Tests
-
Building Code Matrix/Summary
Specifications
a
Specification on entrances to the property with necessary approvals in
writing.
a
Specifications on sewer system and water supply whether Municipal or
private, with necessary written approvals.
10
-
Specifications on the proposed occupancies.
-
Specifications on building materials or a method of construction, and
may require to be submitted by a registered professional engineer.
-
Specifications on soils investigations.
-
Specifications on any other applicable law as set out in Section 8(2)(a) of
the Building Code Act, as amended.
Documents
Trade Certificates and Certification of Qualification.
Other
®
Any other information to prove compliance with the Ontario
Building Code/Act.
The Chief Building Official may specify that not all of the above-mentioned plans, documents and/or
other information are required to accompany an application for a permit.
11
SCHEDULE "B"
This is Schedule "B" to By-Law Number 65-2012 respecting
REFUNDS
Requests for refunds are subject to review by the Chief Building Official; and in
accordance with the policy set out below:
1. Where the owner(s) and/or authorized agent/applicant requests a refund of a
building permit fee, including but not limiting to such reasons as a withdrawal of
the application, cancellation of the project or change in construction; the refund of
such permit fee shall be calculated as follows:
a)
10% of the permit fee or a minimum charge of $50.00, whichever is
greater, is non-refundable where only administrative functions have been
performed
b) 15% of the permit fee or a minimum charge of $75.00, whichever is
greater, is non-refundable where only administrative functions and zoning
review functions have been performed
c) 20% of the permit fee or a minimum charge of $100.00, whichever is
greater, is non-refundable if the permit has been issued and/or where all
plans examination has been completed.
2. Where a permit is revoked on the grounds that it was issued in error, 100% of the
permit fee shall be refunded.
3. The refund shall be made to the person who paid the fee and who is named on the
receipt, unless such person advises the Chief Building Official in writing to issue
a refund to another person so named.
12
SCHEDULE "C"
This is Schedule "C" to By-Law Number 65-2012 respecting
Introduction
CODE OF CONDUCT FOR BUILDING OFFICIALS
The Code of Conduct applies to the Chief Building Official and Inspectors appointed
under the Building Code Act in the exercise of a power or the performance of a duty
under the Building Code Act or the Building Code. The purpose of this Code is to
promote appropriate standards of behaviour and enforcement actions to ensure
Building Officials apply standards of honesty and integrity, and to prevent practices
constituting an abuse of power including unethical or illegal practices.
Standards of Conduct
Building Officials to undertake to:
1. Act in the public interest, particularly with regard to the safety of building works
and structures;
2. Maintain their knowledge and understanding of the best current building practice,
the building laws and regulations relevant to their inspection and plan
examination function;
3. Comply with the provisions of the Building Code Act, the Building Code and any
other Act or Law that regulates or governs Building Officials or their functions;
4. Not to act where there may be, or where there may reasonably appear to be, a
conflict between their duties to their clients, their profession, their peers and the
public at large and their personal interests;
5. Not to act beyond their personal level of competence or outside their area of
expertise;
6. Apply all relevant building laws, regulations and standards appropriately and
without favour;
7. Perform their inspections and plan examination duties impartially and in
accordance with the highest professional standards;
8. At all times abides by the highest moral and ethical standards and avoiding any
conduct, which could bring or tend to bring Building Officials into disrepute;
9. Extend professional courtesy to all;
10. Maintain current accreditation to perform the functions assigned to them; and
Breaches of the Code of Conduct
The Ontario Building Code Act provides that the performance of Building Officials will
be measured against this Code of Conduct. The Municipal administration will review
any allegations brought forward that the Code of Conduct has been breached.
Disciplinary action arising from violations of this Code of Conduct is the responsibility
of the Municipal employer and will be based on the severity and frequency of the
violation in accordance with relevant employment standards.
13
SCHEDULE "D"
This is Schedule "D" to By-Law Number 65-2012 respecting fees.
Row
Category or Type of Fee
Fee
1
Group 'C' New Residential, Additions &
Alterations/Repairs
$1.35 per ft2
Minimum fee of $200.00
2
Group 'C' Residential accessory structures,
carports, decks, retrofits, pool
$0.80 per ft2
Minimum fee of $150.00
3
Group A, B, D, E, F (All Industrial, Commercial,
Institutional Buildings)
$1.40 per ft2
Minimum fee of $250.00
4
Farm Buildings (excluding dwelling units)
$0.25 per ft2
Minimum fee of $100.00
5
Demolitions
$125.00 flat fee
6
Change of Use, Renewal Permits, Other
$150.00 flat fee
7
Wood Burning Systems
$100.00 flat fee
8
Plumbing (Newly constructed, repaired or altered)
$150.00 flat fee
9
School Portables
$150.00 flat fee
10
Tents
$75.00 flat fee
11
Pre-engineered Fabric Buildings
$500.00 flat fee
12
Designated Structures
$2,000.00 flat fee
Group
Type of Occupancy
A
Assembly
B
Care or detention
C
Residential
D
Business & Personal Services
E
Mercantile
F
Industrial
0 A $500.00 deposit is required at the time of issuing a building permit for a new
residential dwelling. The deposit will be refunded when the final inspection on
the residence has been completed by the Chief Building Official or Building
Inspector; the drainage is proper, and all other requirements are complete. After
three years from the issuance of a building permit, the deposit is not refundable
and will be credited to the Municipality to cover administration costs, additional
inspections and record keeping costs incurred over the three years.
0 Where an inspection is requested and the issuance of a permit is not required, an
inspection fee of $75.00 per hour shall be charged. The minimum inspection fee
is $75.00.
14
-
If any person within the Town of South Bruce Peninsula builds without the
required permit, the applicable permit fee shall be doubled.
-
In the event that an application has been received and then the application is
subsequently withdrawn by the homeowner and no fees were collected at the time
of the application, the homeowner will be invoiced for the work completed. If this
invoice is not paid for within 90 days, it will be added to the homeowner's taxes.
-
10% of the permit fee or a minimum charge of $50.00, whichever is greater,
where only administrative functions have been performed
®
15% of the permit fee or a minimum charge of $75.00, whichever is greater,
where administrative functions and zoning review functions have been
performed
-
20% of the permit fee or a minimum charge of $100.00, whichever is greater,
where the permit has been issued and/or where all plans examination has
been completed.
Schedule "D" pg.2 of 3
15
Septic System Permits / Review / Assessments
Row
ii
Type of Fee
Flat Fee
1
Class 2 or 3 new or replacement system
$250.00
2
Class 4 or 5 new or replacement system
$500.00
3
Class 4 or 5 tank replacement only or
Class 4 leaching bed repair
$200.00
4
Change of Use Permit
$100.00
5
Demolition
$100.00
6
Renewal
$100.00
Building Assessment Application/Change of Use
Basic Review (minimum fee)
$100.00
Class 1
A chemical toilet, an incinerating toilet, a recirculating toilet, a self-
contained portable toilet and all forms of privy including a portable privy,
an earth pit privy, a pail privy, a privy vault and a composting toilet system.
Class 2
A greywater system
Class 3
A cesspool
Class 4
A leaching bed system
Class 5
A holding tank
Schedule "D" pg.3 of 3
16
SCHEDULE "E"
This is Schedule "E" to By-Law Number 65-2012 respecting
ADDITIONAL FORMS
Listed below and attached are additional forms:
-
Building Assessment Application/Change of Use
-
Sewage System Specifications (Town of South Bruce Peninsula)
-
Use Permit -- Sewage System As Constructed
-
Energy Efficiency Design Summary
17
:J
!IVO Mil ICE '
Town of South Bruce Peninsula
P.O. Box 310, 315 George St. Wiarton, ON NOH 210
Ph. 519-534-1400 Fax. 519-534-4862
www.southbrucepeninsula.com
BUILDING ASSESSMENT APPLICATION / CHANGE OF USE
PLEASE ANSWER. EACH QUESTION COMPLETELY
Applicant Information: (If different than owner)
Name:
Mailing Address:
Telephone #:
Owner Information:
Name(s):
Mailing Address:
Telephone #:
Contractor Information:
Name(s):
Mailing Address:
Telephone #:
PROPERTY INFORMATION:
Municipal Address:
Legal Address:
(Street # and Name)
(Plaa/Con, Lot etc.)
Property Roll Number:
Former Township/Town:
Details of Proposed alteration/change of use (include total number of bedrooms, number of
existing/proposed/additional plumbing fixtures:
Existing Use:
Existing Floor Area:
Proposed Use:
Proposed Floor Area (total):
Year Structure was built:
Details of proposed alteration/change of use (include total number of bedrooms, number of
existing/proposed/additional plumbing fixtures:
Water Supply: 01 Existing or 0 Proposed
K Dug or Bored Well 0 Drilled Well 0 Municipal 0 Communal 0 Spring 0 Lake 0 Other
Is the property currently subject to a minor variance, zoning official plan amendment, Niagara Escarpment
Development Permit or Grey Sauble Conservation Authority approval? K Yes 0 No
If yes, please provide details:
I certify the above information to be correct
Signature of Owner/Applicant
Date
A site plan/sketch of proposal is required as part of this application. Please attach or sketch on the attached
page: (must include existing structures, sewage system, water supply, proposed alterations/addition(s), lot lines,
all setbacks from structures/buildings and lot lines, north arrow, etc.)
Please note that an incomplete application or site plan/sketch can not be accepted and can delay review of your
application or result in your application being returned.
111111111111111111111111111111111111.111111111111111111111
111111111101111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111111111111111111111111111111111111
111111111111111111111111111111111N11111111111111111111111111
111111111111111111111111111111111111111111111111011111111111111
11111111111111111111111101111111111111111111111111111111111111
111111111111111111111111.11111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111N111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111101
1111111111111111111111N1111111111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111.1111
1111111111111111111111111111111111111111111111111111111111111
111111111111111111111110111111111M11111111111111111111111
11111111111111111111111111111111111111111111111111111111111111
11111111111111111111.11111.1111111111111111111111111111111111
11111111111N1111111111111111111111111111111111111111111NN
M1111111111111111111111111111111111111111111111111111111111111
I certify the above information to be correct
Signature of Owner/Applicant
Date
Office Use Only
K See comments
K Recommended for approval
K Not recommended for approval
Comments:
Signature of Inspector
Date
K Murray Leppard, Chief Building Official
K Kelly McCorkell, Building Inspector
,1_,fertatoptA
Sewage System Specifications
(Town of South Bruce Peninsula)
Site and Design Information- see Ontario Building Code Part 7, 8 and Guideline pages 4 to 7
State Number of:
Tank Flush Toilets Kitchen & Bathroom Sinks_
Bidets
Dishwashers Clothes Washers ____
Bathtubs & Showers _
Urinals
Single or Double Laundry Tubs
Bedrooms
Finished Floor Area
Total Fixture Units
Water Softener
yes / no
(A test hole to a depth of 1.5m in the bed must be available for the Inspector to view.)
Existing/proposed water supply (drilled/dug/shore well/sand point/municipaUcommunal):
Unified Soil Classification soil type in sewage system area:
Percolation rate of native soil: T =
min/cm. Circle one: Estimated Tested on site Lab Test
Sub-Surface Soil Conditions
Rock
Depth (m)
Soil Type
&
-0-
-.25-
Ground Water
-.5-
Table
-1.0-
-1.5-
Describe soil mantle (down gradient from sewage system):
Depth to bedrock/T >50 min./cm,
Depth to High Groundwater Table:
Proposed sewage system design- see Ontario Building Code Part 8 and Guidelines pages 7 to 12
Complete the following as required for in-ground, fill-based, filter bed or alternate system:
Daily sewage flow: litres/day
Size of tank:
litres
Alternate Treatment Unit
Length of distribution pipe
metres
Depth of imported fill
metres, T= min/cm
Imported mantel: Yes
No
Pump required Yes
No
Leaching bed fill area
m2 Filter medium surface
m2 Filter medium base m2
Travel Directions:
Lot and Sewage System Site Plan- see Ontario Building Code Part 8 and Guideline pages 12 to 14
Include the following on a scaled or proportional drawing:
Outline of property with all dimensions. On large parcels include area around building site
only.
2. Location and dimensions of proposed & existing buildings, swimming pools, lakes, rivers,
areas subject to flooding and any other pertinent topographical features.
3. Details of sewage system including size, deign and location of tank and leaching bed. Include
"development site plan" if contained in a subdivision agreement or registered on title.
4. Any areas of disturbed, compacted, imported or altered soils.
5. Location of any sub-surface drainage, culverts or other structural features.
6. Location and type of all existing (including neighbouring) and proposed water supplies.
Sewage System Site Plan:
111111111111111111111111111111111111111111111111111111111M111
111111111111111111111111111111111MIEMMINIIIMMINIIIIII
11111111111111111111111111111111111.11111111111111111111111111111
11111111111111111INIIIIIIINI11111111111111111111111111111.1111111111
111111111-11111111111111111111111111111111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111111111111
111111111111111111111111111111111111101111111111110111111111111111111
1111111111111101111111111111111111111111111111111111111111111111111111111111111111
111111111011111111111111111111111111011111111111111111111111111111111110111
11111111111111111111111111111111111111111=1111111111111111111111111
Sewage System Cross Section: (house, tank and tile bed elevations with existing and proposed grades)
11111111111111111111111111111111111111111111111111111111111111111111
IIIIIIIIIIIIIMEN1111111111111111111111111111111111111111111
1111111111111111111MININBI1111111111I11111111111111111111111111111
11111111111111111111111111111111111011111111111111111111111111
I
11111111111111111111111111111111111111111111111111111111101111111111
111111111111111111111111111111111111111111111111111111111111111
11111111111111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111111111111111111111111111111111111111111
111111111111111111111111111111111111111111111111111111111111111
I
11111111111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111111111111111111111111111111111111111111111111
11111101111111111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111111111111111111111111111111111111111111111
1111111111111111111111111111111111111111111111111.1111111111111111111
,A0filliBRUCE
TOWN OF SOUTH sii RUCE PENINSULA
P.O. Box 310, 315 George St. Wiarton, ON NOH 210
Phone: 519-534-1400 Fax: 519-534-4862
www.southbrueepeninsula.com
USE PERMIT -- SEWAGE SYSTEM AS CONSTRUCTED
Permit No.:
1. Name of Owner:
Mailing Address:
2. Property Information: (location of construction)
Municipal Address: (Street # and Name)
Legal. Address: (Plan/Con, Lot etc.)
Property Roll Number:
3. Use / Type of Building
4. Installed by:
Address:
5. Capacity of Treatment Unit:
litres
6. K Leaching Bed Pipe/Trench
metres/feet
K Filter Bed
metres/feet
E:1 Other
metres/feet
At the ti p re of inspection the following work remains to be completed,
but does not require an additional inspectio (applicable if checked):
K Backfill trenched or absorption area to finished grade with a permeable material.
Grade surface of bed to shed precipitation.
K Improve banks around raised tile bed (Minimum slope 4 to 1).
L
Add topsoil and seed or sod.
Other:
Comments:
Inspected By
K Murray Leppard, Chief Building Official
1:1 Kelly McCorkell, Building Inspector
Inspection Date
".
vl.For.. use bylP.rincipalAuthonty...
:--:ModeltCertiticationNurriber:-
.
.
Application No::..
Energy Efficiency Design Summary
(Part 9 Residential)
This form is used to summarize the energy efficiency design of the project. Information on completing this form is on the reverse
Project Information
unaing number, street name
Unit number
otk.ran
Viunicipality
Postal code
Keg. Plan number I other description
si
B. Compliance Option
SB-12 Prescriptive [SB-12 - 2.1.1.]
Table: Package: A B C D E F G H I J K L M (circle one)
I
SB-12 Performance* [SB-12 - 2.1,21
* Attach energy performance calculations using an approved software
I
H
Energy Star®* [sB-12 - 2.1,3.]
* Attach BOP form
_
K EnerGuide 800*
* House must be evaluated by NRCan advisor and meet a rating of 80
C. Project Design Conditions
ClirriatiCIZOnelSB4). ':
:fleatirigraMprnerit::Efficiency,..:
Spabe-.H aling,EUel:Sourbe....
K
Zone 1 (< 5000 degree days)
K a 90% AFUE
K .?. 78% < 90% AFUE
K Gas
K Propane
K Oil
K Electric
K Solid Fuel
K Earth Energy
K
Zone 2 (a.. 5000 degree days)
Wiridoiks'iliS4li .ghtsGlaSS.DOOrS .:::
-.:Othe.(BUilding':,CofiditioriS.?..
1., Gross Wall Area =
m2
% Windows+
00
K ICF Basement
K Walkout Basement
K ICF Above Grade
K Slab-on-ground
K Log/Post&Beam
Gross Window+ Area = m2
D. Building Specifications [provide values and ratings of the energy efficiency components proposed, or attach Energy Star BOP form]
Buileling:Componerrt;:
:RSI'rR values:i::
soitqing,component:::: fffidiencyRallngs'
Thermal Insulation
Windows & Doors'
Ceiling with Attic Space
Windows/Sliding Glass Doors
Ceiling without Attic Space
Skylights
Exposed Floor
Mechanicals
Walls Above Grade
Space Heating Equip.'
Basement Walls
HRV Efficiency (%)
Slab (all >600mm below grade)
DHW Heater (EF)
Slab (edge only 5600mm below grade)
NOTES
1. Provide U-Value in W/m2.K, or ER rating
2. Provide AFUE or indicate if condensing type combined system used
Slab (all 5600mm below grade, or heated)
E. Performance Design Verification [complete applicable sections if SB-12 Performance, Energy Star or EnerGuide80 options used]
S8-92 Performance:
The annual energy consumption using Subsection 2.1.1. SB-12
The annual energy consumption of this house as designed
The software used to simulate the annual energy use of the
The building is being designed using an air leakage of
Package
is Gj (1 Gj ---l000mj)
is
Gj
building is:
air changes per hour @50Pa.
Energy Star BOP form attached. The house will be labeled on completion by:
Energy Star and EnerGuide80:
Evaluator/Advisor/Rater Name:
Evaluator/Advisor/Rater Licence #:
-
Designers [names of designers who are responsible for the building code design and whose plans accompany the permit application]
^ r
,itectural
Mechanical
Form authorized by OHBA, OBOA, LMCBO, February 6, 2012
Guide to the Energy Efficiency esign Summary Form
The Energy Efficiency Design Summary form summarizes the compliance path used by a house designer to
comply with energy efficiency requirements of the Ontario Building Code. This form must accompany the
building permit application. The information on this form MUST reflect the drawings and specifications being
submitted, or the building permit may be refused. Refer to Supplementary Standard SB-12 for details about
building code compliance requirements. Further information about energy efficiency requirements for new
buildings is available from the provincial building code website at www.mah.cov.on.ca , or the municipal building
department.
Beginning January 1, 2012, a house designer must use one of four energy efficiency compliance options in the
building code:
1. Comply with the SB-12 Prescriptive design tables,
2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards,
3. Design to Energy Star standards, or
4. Evaluate the design according to EnerGuide technical procedures and achieve a rating of 80 or more.
COMPLETING THE FORM
B. Compliance Options
Indicate the compliance option being used.
-
SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and
mechanical system efficiency requirements set out in Subsection 2.1.1. of SB-12. Energy efficiency design
modeling and testing of the building is not required under this option.
-
SB-12 Performance refers to the alternative method of compliance set out in Subsection 2.1.2. of SB-12.
Using this approach the designer must use recognized energy simulation software (such as HOT2000
V9.34c1.2 or newer), and submit documents which show that the annual energy use of the building is equal
to a prescriptive package.
-
Energy Star houses must be designed to Energy Star requirements and be labelled on completion by
Enerquality or other agency. The Energy Star BOP form must be submitted with the permit documents.
-
EnerGuide80 houses are validated by NRCan authorized energy advisors and must achieve a rating of 80 or
more when evaluated in accordance with EnerGuide administrative and technical procedures.
C. Project Design Conditions
Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1
Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights and
glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is required. If the ratio is
more than 22% the SB-12 Prescriptive option may not be used. The total area is the sum of all the structural
rough openings. Some exceptions apply. Refer to 2.1.1.1. of SB-12 for further details.
Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating
equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies.
Other Building Conditions: These construction conditions affect SB-12 Prescriptive compliance requirements.
D. Building Specifications
Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under
the SB-12 Prescriptive option, RSI 3.52 wall insulation is permitted in certain conditions where other design
elements meet higher standards. Refer to SB-12 for further details.
E. Performance Design Summary
This section is not required to be completed if the SB-12 Prescriptive option is being used.
AIRTIGHTNESS REQUIREMENTS FOR NEW HOUSES
All houses must comply with increased air barrier requirements in the building code. Notice of air barrier
completion must be provided and an inspection conducted prior to it being covered. A blower door test to verify
the air tightness of the house must be conducted during construction if the NRCan EnerGuide80 option is used,
or if the SB-12 Performance or Energy Star options are used and an air tightness of less than 2.5 ACH @ 50 Pa
in the case of detached houses, or 3.0 ACH @ 50 Pa in the case of attached houses is necessary to meet the
required energy efficiency standard.
ENERGY EFFICIENCY LABELING FOR NEW HOUSES
Energy Star and EnerGuide issue labels for new homes constructed under their energy efficiency programs.
The building code does not regulate new home labelling.