This is the exact embedded text of the captured official document.
Snapshot 43b89388847d · verified 2026-09-21 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
St. Joseph
Valuation Formula
Schedule "A" to By-law 2018 - 22 - As amended by Resolution 2020-172
category
Permit fees will be set at the greater of the value
Permit of the project, or a calculation
based on size.
(per sq.ft.)
residential construction (valued under $1000}
$
30.00
residence, new construction (valued at $1000+)
$30+($5 x each $1000 value)
basement
$50.00 I sq. ft.
main floor
I
$150.00 I sq. ft.
second floor
$75.oo I sq. ft.
residence, renovation/additions
contract price or
interior
I
estimated material
exterior
cost + 50%
accessory buildings (sheds, bunkie-no plumbing,
$30+($5 x each $1000 value)
garages, farm buildings)
interior unfinished
$35.oo I sq.ft.
interior finished
$50/ sq. ft.
second floor (garage etc.)
$25/ sq. ft.
tarp type building
$20.00/ sq. ft.
replace roofing with no structural changes
$
115 flat fee
(includes one medium load (single axle dump truck
or large trailer) to disposal site)
replace siding, soffit/fascia with no structural
$
125 flat fee
changes (includes one load (single axle dump truck
or large trailer) to disposal site)
I
Decks, Porches {servicing a dwelling)
$30+{$5 x each $1000 value)
decks, porches (not covered/enclosed)
$30/ sq. ft.
decks, porches (covered/enclosed)
$40/ sq. ft.
carport
$30/ sq. ft.
commercial buildings (valued under $1000)
$40 flat fee
commercial buildine:s (valued at $1000+)
$40+($5 x each
SlOO/ sa. ft.
occupancy permit (when required)
$
10.00
relocate or move a building
$
45.00
demolish (except dwelling and commercial)
$
75.00
demolish (single family dwelling, commercial)
$
75.00
installation of solar panels
$150 flat fee
construction of fence (no higher than 5' 10")
$40 flat fee
any project valued at $500,000+
set by Council/CBO
change of use permit
$75+permit
partial permit
25% of total permit
conditional permit
25% of total permit
Work begun prior to issuance of a building permit
2 x building permit fee