 "answer": "In the Township of Strong, Ontario, building permit rules are set by Building By-law 2024-017, Schedule B — Permit Fee Schedule and 1 other bylaw, verified 2026-09-25. Permit required for: Construction of a building, including erection, installation, extension, material alteration or repair; demolition; change of use; conditional permits. Exemptions: Re-shingling a roof; storage shed ancillary to principal building, <=15 m2 (161 sq ft), one storey, not attached, no plumbing. Permit fees: $100.00 + $15.00 per Thousand; construction cost guidelines cost per square foot of floor area.",
 "municipality_id": "gx-001776",
 "municipality": "Strong",
 "status_type": "Township",
 "jurisdiction": "Ontario",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-25",
 "official_website": "http://www.strongtownship.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-law 2024-017, Schedule B — Permit Fee Schedule",
   "category": "building_permits",
   "document_type": "other",
   "status": "adopted",
   "document_url": "https://media-001-ca.cdn.govstack.com/strongtownship-008-ca/media/kutnjosu/2024-017-revised-permit-fee-building-by-law_strong_web-copy-7.pdf",
   "summary": "Schedule B to Strong's Building By-law 2024-017: permit fee cost guidelines (per-$1,000 of value and per-square-foot rates by building type), re-inspection/transfer/compliance-letter fees, annual permit-maintenance fees; fees doubled if construction starts without a permit.",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "a125dd7eb72f1259130483527c6cbe15b27d0a9c3bd4792705aacf1066fca1e5",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "2024-017",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a125dd7eb72f1259130483527c6cbe15b27d0a9c3bd4792705aacf1066fca1e5.pdf",
   "link_dead": false,
   "facts": {
    "exemptions": "Re-shingling a roof; storage shed ancillary to principal building, <=15 m2 (161 sq ft), one storey, not attached, no plumbing.",
    "fee_basis": "$100.00 + $15.00 per Thousand; construction cost guidelines cost per square foot of floor area.",
    "authority": "Chief Building Official",
    "fine_range": "FEES ARE DOUBLED"
   },
   "fact_citations": {
    "exemptions": "No permit is required for re-shingling a roof; No permit is required for a shed intended for storage purposes only",
    "fee_basis": "Cost Guidelines $100.00 + $15.00 per Thousand; CONSTRUCTION COST GUIDELINES - cost per square foot of floor area",
    "authority": "Chief Building Official",
    "fine_range": "FEES ARE DOUBLED"
   },
   "transcript_url": "/ca/on/strong/building-permits/bylaw-2024-017/",
   "transcript_quality": "exact"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Building By-law No. 2024-017",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": "2024-05-14",
   "document_url": "https://media-001-ca.cdn.govstack.com/strongtownship-008-ca/media/vtydfmlr/2024-017-building-by-law_amended-mar-25-2025_web.pdf",
   "summary": "Township of Strong's Building By-law under the Building Code Act, 1992: requires permits for construction, demolition, change of use and conditional permits; defines Chief Building Official/Inspector roles and inspections. Permits administered jointly with 6 area municipalities via the Joint Building Committee (Burk's Falls, Joly, Machar, Ryerson, South River, Sundridge).",
   "discovered_by": "on-building",
   "discovered_at": "2026-09-25",
   "capture_sha256": "48d2f441b221f32a83119ae2145f6d8fa95f7d5a4b54a15543b16647f6d19675",
   "captured_at": "2026-09-25T07:16:54+00:00",
   "capture_http_status": 200,
   "document_number": "2024-017",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/48d2f441b221f32a83119ae2145f6d8fa95f7d5a4b54a15543b16647f6d19675.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Construction of a building, including erection, installation, extension, material alteration or repair; demolition; change of use; conditional permits.",
    "exemptions": "Re-shingling a roof; storage shed ancillary to principal building, not more than 15 m2, one storey, detached, no plumbing.",
    "fee_basis": "$100.00 + $15.00 per thousand; construction cost guidelines per square foot; fees doubled if construction started without permit.",
    "authority": "Chief Building Official; Building Inspector"
   },
   "fact_citations": {
    "permit_required_for": "Schedule \"A\"",
    "exemptions": "Schedule \"B\"",
    "fee_basis": "Schedule \"B\"",
    "authority": "s. 2.1.6, s. 2.1.12"
   },
   "transcript_url": "/ca/on/strong/building-permits/bylaw-2024-017-2/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/on/strong/building-permits/"
}