Building By-law No. 2019-83 (Consolidated incl. 2020-19, 2021-48, 2022-33, 2024-23)

West Lincoln, Ontario · No. 2019-83 · adopted 2019-09-23 · summary & facts

This is the exact embedded text of the captured official document. Snapshot f8668d42d9cf · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Township of West Lincoln Page 1 THE CORPORATION OF THE TOWNSHIP OF WEST LINCOLN BY-LAW NO. 2019-83 (CONSOLIDATED - As Amended by By-law 2020-19 & 2021-48 & 2022-33 & 2024-23) A BY-LAW UNDER THE BUILDING CODE ACT RESPECTING CONSTRUCTION, DEMOLITION, CHANGE OF USE, OCCUPANCY PERMITS, TRANSFER OF PERMITS, INSPECTIONS AND ASSOCIATED FEES. WHEREAS pursuant to the Building Code Act 1992, S.O. 1992, c .23 as amended, the Lieutenant Governor in Council has established a Building Code which is in force throughout Ontario; AND WHEREAS Section 7 of the Building Code Act 1992, S.O. 1992, c .23 as amended, empowers Council to pass by-laws respecting construction, demolition, change of use, transfer of permits, inspections, required documentation and the submission of such with an application for permit, and the setting and refunding of fees; AND WHEREAS Subsection 8(3) of the Building Code Act 1992, S.O. 1992, c .23 as amended, authorizes a Chief Building Official to issue a Conditional Building Permit in circumstances and subject to the conditions listed in that subsection; AND WHEREAS Article 8(3)(c) of the Building Code Act 1992, S.O. 1992, c .23 as amended, sets out that the applicant or such other person as the Chief Building Official determines, must enter into a form of agreement which is described in that article and commonly known as a Conditional Building Permit Agreement; AND WHEREAS the Council of the Township of West Lincoln deems it to be in the public interest that the Chief Building Official have the authority to execute Conditional Building Permit Agreements on behalf of the Township of West Lincoln; THE COUNCIL OF THE CORPORATION OF THE TOWNSHIP OF WEST LINCOLN ENACTS AS FOLLOWS: SECTION 1 GENERAL PROVISIONS 1.1 SHORT TITLE 1.1.1 This by-law shall be known as the "Building By-law". 1.2 DEFINITIONS 1.2.1 For the purpose of this by-law: (1) "act" means the Building Code Act 1992, S.O. 1992, c .23 as amended; (2) "applicant" means the owner of a building or property who applies for a permit or any person authorized by the owner to apply for a permit on the owner's behalf, or any person or corporation empowered by statute to cause Building By-law By-law 2019-83 Township of West Lincoln Page 2 the construction or demolition of a building or buildings and anyone acting under the authority of such person or corporation; (3) "architect" means the holder of a licence, certificate of practice or a temporary licence issued under the Architects Act as defined in the Building Code; (4) "as constructed plans" means as constructed plans as defined in the Building Code; (5) "authorized agent" means any person authorized by the owner of the building or property to apply for a permit on the owner's behalf as established by the completion of the prescribed from. (6) "building" means a building as defined in Section 1(1) of the Act; (7) "building code" means the regulations made under Section 34 of the Act; (8) "chief building official" means the Chief Building Official appointed by by-law by The Corporation of the Township of West Lincoln for the purposes of enforcement and administration of the Act; (9) "construct" means construct as defined in Subsection 1(1) of the Act; (10) "corporation" means The Corporation of the Township of West Lincoln; (11) "director" means the Director of Planning and Building appointed by by-law by the Corporation of the Township of West Lincoln. (12) "inspector" means an inspector appointed by by-law of The Corporation of the Township of West Lincoln for the purposes of enforcement of the Act; (13) "landscape architect" means a member of the Ontario Association of Landscape Architects; (14) "owner" means the registered owner of a property and includes a lessee, a mortgagee in possession, and any person who proves to the satisfaction of the Chief Building Official that they are the authorized agent of the owner of a property and any person who qualifies as the owner of a property pursuant to Section 15.1 of the Act; (15) "permit" means permission or authorization given in writing from the Chief Building Official to perform work, to change the use of a building or part thereof, or to occupy a building or part thereof, as regulated by the Act and the Building Code; (16) "permit holder" means the owner to whom a permit has been issued or where a permit has been transferred, the new owner to whom the permit has been transferred; (17) "professional engineer" means a person who holds a license or temporary license under the Professional Engineers Act, as defined by the Building Code; Building By-law By-law 2019-83 Township of West Lincoln Page 3 (18) "registered code agency" means a Registered Code Agency, as defined in Subsection 1(1) of the Act; (19) "sewage system" means a sewage system, as defined in the Building Code; and (20) "township" means The Corporation of the Township of West Lincoln or the geographical area of the municipality, as the context requires; (21) "work" means construction or demolition or a building or part thereof, as the case may be. 1.2.2 Words or terms not defined in this by-law shall have the meaning ascribed to them in the Act or Building Code. 1.2.3 In the case of any conflict between the provisions of this by-law and the provisions of either of the Act or the Building Code, the provisions of the Act and of the Building Code shall prevail. SECTION 2 PERMITS 2.1 CLASS OF PERMITS 2.1.1 Classes of permits required for construction, demolition or change of use are set forth in Schedule "A" of this by-law. 2.2 FILE APPLICATION ON FORMS PRESCRIBED 2.2.1 To obtain a permit, an applicant shall file an application electronically or in writing, on forms prescribed by the Province of Ontario and provided by the Township, as amended from time to time, and supply any other information relating to the application as required by the Chief Building Official. 2.3 REQUIRED SUBMISSIONS 2.3.1 Every application for a permit shall be submitted to the Chief Building Official, and contain the following information: (1) Where application is made for a construction permit under Subsection 8(1) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: (a) complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this by- law for the work to be covered by the permit; and (b) the required fee(s) and deposit(s) as described in Schedule "A". (2) Where application is made for a demolition permit under subsection 8(1) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: Building By-law By-law 2019-83 Township of West Lincoln Page 4 (a) complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this By- law for the work to be covered by the permit; and (b) the required fee(s) and deposit(s) as described in Schedule "A". (3) Where application is made for a private sewage system permit under subsection 8(1) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: (a) a site evaluation which shall include all of the following items unless otherwise specified by the Chief Building Official; i. the date the evaluation was completed; ii. name, address, telephone number and signature of the person who prepared the evaluation; and iii. a scaled map of the site providing such details as prescribed in Schedule "B" of this By-law (b) complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this By- law for the work to be covered by the permit; and (c) the required fee(s) and deposit(s) as described in Schedule "A". (4) Where application is made for a conditional permit under Subsection 8(3) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall: (a) Include complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this By-law for the work to be covered by the permit; (b) Include written correspondence to the Chief Building Official stating: i. the reason(s) why the applicant believes that unreasonable delays in construction would occur if a conditional permit is not granted; ii. the necessary approval(s) which must be obtained in respect of the proposed building and the time in which such approvals will be obtained; and iii. the time in which plans and specifications of the complete building will be filed with the Chief Building Official. (c) be subject to entering into an agreement with the Township as provided for in subsection 8(3) of the Act; and (d) include the required fee(s) and deposit(s) as described in Schedule "A" of this by-law. Building By-law By-law 2019-83 Township of West Lincoln Page 5 (5) Where application is made for a change of use permit issued under Subsection 10(1) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: (a) complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this by- law for the work to be covered by the permit; (b) written correspondence to the Chief Building Official to identify and describe: i. the building in which the occupancy is to be changed, by a description that will readily identify and locate the building; and ii. in detail the current and proposed occupancies of the building or part of the building for which the application is made. (c) complete plans and specifications showing the current and proposed occupancy of all parts of the building, and which contain sufficient information to establish compliance with the requirements of the Building Code including, but not limited to: floor plans; details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearding capacities; and details of the existing sewage system, if any; and (d) the required fee(s) and deposit(s) as described in Schedule "A". (6) Where application is made for a transfer of permit because of a change of ownership of the land, as permitted under Clause 7(1)(h) of the Act, the application shall be made in the form prescribed by Schedule "B" of this By- law and shall include: (a) the following information on the prescribed application form: i. the names and addresses of the previous and new land owner; ii. the date that the land ownership change took place; and iii. a description of the permit that is being transferred. (b) the required fee(s) and deposit(s) as described in Schedule "A". (7) Where application is made for occupancy of an unfinished building as provided for in Division C Articles 1.3.3.1 and 1.3.3.2 of the Building Code, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: (a) complete plans and specifications, documents and other information as required by Section 3 and as described in Schedule "B" of this by-law to identify, to the satisfaction of the Chief Building Official, the portion of the building intended to be occupied; Building By-law By-law 2019-83 Township of West Lincoln Page 6 (b) a description and clear indication of the part of the building for which occupancy is requested; and (c) the required fee(s) and deposit(s) as described in Schedule "A". 2.4 INCOMPLETE APPLICATIONS 2.4.1 An application is deemed to be incomplete if it does not contain the prescribed information or is not accompanied by plans, certificates and documents specified in this by-law. 2.4.2 Where an application is found to be incomplete, except as permitted under Article 2.4.3, the application shall be refused. 2.4.3 An incomplete application may be accepted if the applicant acknowledges the application is incomplete by completing the "Acknowledgement of Incomplete Application" form as may be amended from time to time, provided by the Township, thus declaring the application exempt of the timelines stipulated by the Building Code until the application is deemed to be complete. 2.5 CONDITIONAL PERMITS 2.5.1 The Chief Building Official may, upon being satisfied that as many of the requirements of this by-law, the Building Code Act, 1992, S.O. 1992, c. 23, as amended, and the Building Code as amended, as practicable have been complied with, execute an agreement that includes the terms described in Article 8(3)(c) of the Building Code Act, 1992, S.O. 1992, c. 23, as amended. 2.5.2 The delegation of authority set out in Subsection 2.5.1 above is effective as of the date of enactment of this by-law. 2.6 TRANSFER OF PERMITS 2.6.1 In any case wherein the ownership of the land is transferred after a permit is issued, the ownership of that permit may be transferred if the new land owner completes the permit application form in accordance with the requirements of Section 2 of this by- law. 2.6.2 Once the permit is transferred, the new owner shall be the permit holder for the purpose of the Act and the Building Code, thus assuming any responsibility for outstanding inspections. 2.7 PARTIAL PERMITS 2.7.1 Where feasible, the Chief Building Official may consider approval of a portion of the building or project prior to the issuance of a permit for the entire building of project, by way of issuance of a partial permit. 2.7.2 Where application is made for a partial permit, the application shall be made in the form prescribed by Schedule "B" of this By-law and shall include: Building By-law By-law 2019-83 Township of West Lincoln Page 7 (1) complete plans and specifications, documents and other information as required by the Building Code and described in Schedule "B" of this by-law for the work to be covered by the partial permit; and (2) the required fee(s) and deposit(s) as described in Schedule "A" for the complete project. 2.7.3 Where a partial permit is requested, the application is deemed to be incomplete. 2.7.4 Where the Chief Building Official elects to grant a partial permit it shall be in the form of a conditional permit and shall be subject to all of the same terms and conditions as identified in Sentence 2.3.1(4), as well as the prescribe fees of Schedule "A" of this by-law for conditional permits. 2.7.5 Where a permit is issued for part of a building or project, this shall not be construed to authorize construction beyond the plans for which approval was given, nor that approval will be necessarily granted for the entire building or project. 2.8 REVOCATION OF PERMITS 2.8.1 Prior to revoking a permit under Subsection8(10) of the Act, the Chief Building Official may serve a notice by personal service or by mail sent to the last known address of the permit holder. 2.8.2 A permit holder may, within thirty (30) days from the date of service of the notice described in Article 2.8.1 of this by-law, request in writing the Chief Building Official to defer the revocation by stating reasons why the permit should not be revoked. 2.8.3 The Chief Building Official shall consider the reasons provided and decide to revoke or extend the permit. 2.8.4 Notice of the decision of the Chief Building Official under Article 2.8.3 shall be mailed to the last known address of the permit holder when, after consideration of the reasons provided, the decision is made to proceed with the revocation of the permit. 2.8.5 Where the permit is extended, the permit holder shall have one hundred eighty (180) days to show progress and to have the next required inspection completed or the subject permit may be revoked with no further notice other than written confirmation of revocation given in the same manner as identified in Article 2.8.4. 2.8.6 A request for deferral of revocation shall be subject to payment of a non-refundable fee as set out in Schedule "A" of this by-law. 2.9 INACTIVE PERMIT APPLICATION 2.9.1 Where an application for a permit remains incomplete or inactive for thirty (30) days after it is submitted, the application may be deemed by the Chief Building Official to have been abandoned and the application shall be returned to the applicant along with a notice of abandonment. Building By-law By-law 2019-83 Township of West Lincoln Page 8 2.9.2 Where the application for permit has been deemed abandoned and returned to the applicant, it shall be accompanied by a refund of the applicable fees in accordance with the provisions for refund of fees described in Schedule "A" of this by-law. 2.9.3 Once an application is deemed to be abandoned and the applicant is notified, a new application shall be filed for the proposed work. 2.10 LIMITING DISTANCE AGREEMENTS 2.10.1 An applicant may enter into a Limiting Distance Agreement with the Township as provided for in Sentence (8) of Division B - Article 3.2.3.1 or in Sentence (5) of Division B - Article 9.10.14.12 of the Building Code. SECTION 3 PLANS AND SPECIFICATIONS 3.1 INFORMATION SUFFICIENT TO DETERMINE CONFORMITY 3.1.1 Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official to determine whether or not the proposed construction, demolition, change of use or transfer of permit will comply with the requirements of the Act, the Building Code and any other applicable law. 3.2 COMPLETE SETS 3.2.1 Each application shall, unless otherwise specified by the Chief Building Official, be accompanied by one complete set of plans and specifications as described herein as well as in Schedule "B" of this by-law. 3.3 REQUIREMENTS FOR PLANS 3.3.1 Plans shall be drawn to scale to a minimum of 1:75 or 3/16" = 1'. 3.3.2 Plans shall be legible and provided in an electronic media format approved by the Chief Building Official. 3.3.3 Where paper submission is accepted by the Chief Building Official the paper submission shall be in a format no larger than 279mm x 432mm [11" x 17"]. 3.3.4 Where paper submission is accepted by the Chief Building Official in a format larger than that prescribed in Article 3.3.3, any and all costs to convert the paper submission to electronic media format shall be borne in full by the permit applicant. 3.4 SURVEYS 3.4.1 Site plans shall be referenced to an up-to-date plan of survey and provided in a manner as prescribed in Schedule "B" of this by-law. 3.5 LOT GRADING PLANS Building By-law By-law 2019-83 Township of West Lincoln Page 9 3.5.1 Each application for permit for the construction of a single detached, semi-detached, duplex, triplex, fourplex, row house, and any additions thereto shall be accompanied by a lot grading plan bearing the signature and seal of a practicing Engineer, Landscape Architect, Architect or Ontario Land Surveyor who certifies thereon that the drainage scheme depicted by the plan: (1) conforms to Division B - Subsection 9.14.6 of the Building Code for all projects on lands not governed by a registered plan of subdivision; or (2) conforms to Division B - Subsection 9.14.6 of the Building Code as well as the Master Grading Plan approved with the registered plan of subdivision or plan of condominium for all projects on lands governed by a registered plan of subdivision or plan of condominium. 3.5.2 Where a lot grading plan is required to be submitted with the permit application in accordance with Sentence 3.5.1(1), above, the lot grading of the lot shall be completed and an as built lot grading plan bearing the signature and seal of the chosen professional certifying that the finished elevations and grading of the land conforms with the lot grading plan accepted through the issuance of the permit shall be submitted within seven (7) months of the issuance of the occupancy permit of the associated dwelling unit. 3.5.3 Where a lot grading plan is required to be submitted with the permit application in accordance with Sentence 3.5.1(2), above, the lot grading of the lot shall be completed and an as built lot grading plan bearing the signature and seal of the chosen professional certifying that the finished elevations and grading of the land conforms with the lot grading plan accepted through the issuance of the permit shall be required as a condition of occupancy of the associated dwelling unit. 3.5.4 Where occupancy of a dwelling unit is sought prior to the satisfaction of the requirements stipulated in Article 3.5.3, the applicant may request an extension for the completion of lot grading and submission of the required as built lot grading plan whereby a deposit in the amount specified in Schedule "A" shall be submitted to the Township. 3.5.5 Where an extension has been applied for under the provisions of Article 3.6.4, the lot grading of the lot shall be completed and an as built lot grading plan bearing the signature and seal of the chosen professional certifying that the finished elevations and grading of the land conforms with the lot grading plan accepted through the issuance of the permit shall be submitted within seven (7) months of issuance of the occupancy permit of the associated dwelling unit. 3.6 AS CONSTRUCTED PLANS 3.6.1 On completion of the construction of a building, the Chief Building Official may require a set of as constructed plans, including a plan of survey showing the location(s) of the building(s). 3.7 PLANS PROPERTY OF CORPORATION Building By-law By-law 2019-83 Township of West Lincoln Page 10 3.7.1 Plans and specifications furnished according to this by-law or otherwise required by the Building Code and the Act, become the property of the Corporation and will be dealt with, including both disposal and retention, in accordance with relevant legislation and applicable municipal policies and procedures. SECTION 4 REGISTERED CODE AGENCIES 4.1 DELEGATION OF AUTHORITY 4.1.1 The Director is authorized to enter into and sign contracts for service agreements with Registered Code Agencies and appoint them to perform specified functions from time to time, in order to maintain the time periods for permits prescribed in Division C - Article 1.3.1.3 of the Building Code. Building By-law By-law 2019-83 Township of West Lincoln Page 11 4.2 FUNCTIONS OF REGISTERED CODE AGENCY 4.2.1 The Registered Code Agency may be appointed to perform one or more of the specified functions described in Section 15.15 of the Act. SECTION 5 FEES AND REFUNDS 5.1 FEES - SCHEDULE "A" 5.1.1 The Chief Building Official shall determine the required fees for the work proposed, calculated in accordance with Schedule "A" of this by-law and the applicant shall pay such fees. 5.1.2 If a fee cannot be calculated using the stipulated fees provided in the table of Schedule "A", the Chief Building Official shall calculate the fee using the value of construction method and the applicant shall pay such fee. 5.1.3 The fee shall be calculated by the Chief Building Official through the review of the application for permit process and shall be due for payment prior to the issuance of the permit. Notwithstanding the provisions of subsection 2.3 for submission of the required fee(s) and deposit(s) as described in Schedule "A", the calculation of the fee is conducted through the review process and therefore the submission of the fee is not considered a component of a complete application and does not impede the acceptance of an application for permit submitted without the fee. 5.1.4 A permit shall not be issued until the fees thereof have been paid in full. 5.2 REVISIONS TO PERMITS 5.2.1 Where the applicant for a permit makes material changes to plans, specifications or calculations after submission to the Chief Building Official for approval, the Chief Building Official may increase the required permit fee or fees by applying the rates in Schedule "A" to these changes and require payment of such increased fees before the permits or approvals are issued. 5.2.2 Where the applicant for a permit makes material changes to plans, specifications or calculations after a permit is issued, the Chief Building Official may request an additional permit fee or fees by applying the rates in Schedule "A" to those changes and require payment of such additional fees before the occupancy permit is issued. 5.3 PLANS EXAMINATION 5.3.1 The initial plans examination of a complete application, as well as the preparation of the plans examination report shall be included as a component of services provided for the permit fee as identified in Schedule "A" of this by-law. 5.3.2 In addition to the initial plans examination of a complete application as identified above, a single follow up plans examination with regard to addressing items identified in the plans examination deficiency report shall also be included as a Building By-law By-law 2019-83 Township of West Lincoln Page 12 component of services provided for the permit fee as identified in Schedule "A" of this by-law. 5.3.3 Notwithstanding subsections 5.3.1 and 5.3.2, any subsequent plans examination review beyond those identified as included in the permit fee shall be subject to a secondary plans examination fee based on a rate per hour of plans examination beyond those provided for in the cost of the permit. This additional hourly rate shall be calculated by the Chief Building Official in accordance with the fee established in Schedule "A" of this by-law. 5.4 CONDITIONAL PERMITS 5.4.1 Where the applicant for a permit requests and is granted a conditional permit, additional fees shall be applicable as detailed in Schedule "A" to this by-law. 5.4.2 In addition to the additional fees described above in Article 5.4.1 for a conditional permit, a security deposit shall also be required as part of the Conditional Permit Agreement in an amount as detailed in Schedule "A" to this by-law. Building By-law By-law 2019-83 Township of West Lincoln Page 13 5.5 BUILDING WITHOUT A PERMIT 5.5.1 Any person or corporation who commences construction, demolition or changes the use of a building before receiving a permit to commence such work, shall in addition to any other penalty under the Act, Building Code or this by-law pay an additional fee equal to 100% of the amount calculated as the full permit fee for the entire project but in no case shall the additional fee exceed $25,000, in order to compensate the Township for the additional work incurred by such early commencement of work. 5.5.2 Where a project receives multiple partial or conditional permits, the additional fee described above shall be based on the overall permit fee and will not exceed $10,000 per occurrence for each state of construction. 5.5.3 The additional fee outlined in this Section shall not relieve any person or other corporate entity from complying with the Building Code and other applicable law or from any penalty prescribed by the Act, for commencing construction prior to obtaining a permit. 5.6 LIMITING DISTANCE AGREEMENTS 5.6.1 Where the applicant for a permit requests entering into a Limiting Distance Agreement, additional fees shall be applicable as detailed in Schedule "A" to this by- law. 5.7 REFUNDS 5.7.1 Where there is a written request for a refund of permit fees paid due to the abandonment of all or a portion of the work or the non-commencement of any project, the Chief Building Official shall determine the amount of paid permit fees that may be refunded to the applicant, if any, in accordance with Schedule "A" of this by-law. 5.7.2 Fees collected for Administrative fees as detailed in Schedule "A" to this by-law shall not be refundable. 5.7.3 Notwithstanding subsection 5.7.1, no refund will be made which shall result in the retention by the Township of a sum less than the minimum permit fee payable as detailed in Schedule "A" to this by-law. 5.7.4 "Where monies paid under a deposit remain unclaimed for a period of not less than seven (7) years, the Township may send notice to the permit applicant's last known address advising such applicant that the Township holds unclaimed funds in the form of a building permit deposit and such funds may be subject to forfeiture. The applicant may within forty-five (45) days of receiving the notice provide in writing claims to such deposit and provide proof and evidence of completion of work for which the deposits were taken to the satisfaction of the Chief Building Official. The Township shall also advertise a general notice on the Township's website and through applicable local newspapers where available and social media that, in the opinion of the Chief building official or Director of Planning and Building Or the Township Treasurer that sufficient general circulation throughout the Township, Building By-law By-law 2019-83 Township of West Lincoln Page 14 stating that permit deposits being held by the Township for a period of more than seven (7) years or more will be considered forfeit by the applicants if such deposits have not been claimed within forty-five (45) days. If through no fault of the Township, the deposit has not been refunded after the expiry of the forty-five (45) day period, the Township may without further notice declare the deposit forfeited, whereupon the deposit shall become the property of the Township free of all claims. (amended by By-law 2024-23) SECTION 6 INSPECTIONS 6.1 NOTICE REQUIREMENTS 6.1.1 The permit holder shall notify the Chief Building Official or a Registered Code Agency, where one is appointed, of each stage of construction for which a mandatory notice is required under Division C - Subsection 1.3.5 of the Building Code. 6.1.2 The permit holder shall provide the notice of completion as prescribed by Section 11 of the Act, or where occupancy is required prior to completion, notice of inspection to ensure that the requirements of Section 11 of the Act and Division C - Subsection 1.3.3 of the Building Code are complied with. 6.1.3 A notice pursuant to this part of the by-law is not effective until notice is actually received by the Chief Building Official or the Registered Code Agency, if one is appointed. 6.1.4 Notice shall be deemed to have been received when the Chief Building Official makes a written or electronic record of the request for inspection. 6.1.5 Upon receipt of proper notice, the inspector or Registered Code Agency, if one is appointed, shall make a written or electronic record of the time notice is received and undertake a site inspection of the building to which the notice relates, in accordance with the time periods stated in Division C - Article 1.3.5.3 of the Building Code and Section 11 of the Act. 6.2 UNPREPAREDNESS FOR SCHEDULED INSPECTION 6.2.1 A permit holder shall be subject to a fee, as prescribed in Schedule "A" to this by- law, for each inspection which is cancelled less than twenty-four (24) hours prior to the time of the scheduled inspection or where an inspection is conducted on work which is not substantially completed as required for the requested inspection. 6.2.2 Inspections may be cancelled and the applicable fee waived where the inspection was cancelled for reasons due to natural causes, at the discretion of the Chief Building Official. 6.2.3 The fees assessed for the instances described in subsections 6.2.1 and 6.2.2 above shall be required to be paid in full prior to the issuance of an occupancy permit and / or the closing of the permit file and the release of any applicable deposits. Building By-law By-law 2019-83 Township of West Lincoln Page 15 SECTION 7 ADMINISTRATION 7.1 SEVERABILITY 7.1.1 In the event that any provision of this by-law is declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of the remaining provisions of the by-law. 7.2 CHIEF BUILDING OFFICIAL DISCRETION 7.2.1 The Chief Building Official may waive the requirements of Part 2 or Schedule "B" of this by-law with respect to any application submitted with respect to this by-law where at their sole discretion it is deemed appropriate to do so. 7.2.2 Where the Chief Building Official exercises their discretion as set out in this section, the requirements of this by-law are deemed to be modified accordingly. 7.3 BY-LAWS TO BE REPEALED 7.3.1 By-law No. 2017-15 of The Corporation of the Township of West Lincoln, and any amendments made thereto, are hereby repealed as of October 1st, 2019. 7.4 DATE OF ENACTMENT 7.4.1 This by-law shall come into force and effect October 1st, 2019. READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 23RD DAY OF SEPTEMBER, 2019. CONSOLIDATED VERSION - ORIGINAL SIGNED ____________________________ MAYOR DAVE BYLSMA CONSOLIDATED VERSION - ORIGINAL SIGNED ____________________________ JOANNE SCIME, CLERK Building By-law By-law 2019-83 Township of West Lincoln Page 16 Schedule "A" By-law No. 2019-83 (As amended by By-law 2021-48 & 2022-33) SECTION 1 FEE CALCULATION 1.1 FORMULA 1.1.1 All permit fees provided in the tables below shall be considered to be per square metre for the purpose of the prescribed formula unless otherwise noted. 1.1.2 Permit fees shall be calculated based on the formula given below, unless otherwise specified by this schedule. Permit Fee = Prescribed Fee x Area Where the prescribed fee is that specified in the schedule for classification of the proposed work; and Where Area is the calculated gross floor area of the proposed work in square metres (sq. m.) for each class of permit 1.2 MINIMUM PERMIT FEE 1.2.1 A minimum permit fee of $168.00 shall be charged for all work, unless otherwise indicated or prescribed "flat fee" has been assigned within the tables below 1.2.2 The minimum permit fee shall be a non-refundable fee. SECTION 2 PERMIT FEES 2.1 NEW CONSTRUCTION AND ADDITIONS Group A - Assembly Occupancies Class of Permit Fee school, church, restaurant over 30 seats, library, theatre, educational or recreational facility and occupancies of a similar nature $19.24 outdoor public swimming pool $380 flat Group B - Institutional Occupancies Class of Permit Fee hospital, nursing home, reformatory, prison and occupancies of a similar nature $21.09 Building By-law By-law 2019-83 Township of West Lincoln Page 17 Group C - Residential Occupancies Class of Permit Fee single detached, semi-detached, duplex dwellings $14.69 triplex, fourplex, townhouse dwellings $14.69 apartment building $14.69 hotel / motel $12.50 Repeat Plans for single detached, etc. - m2 $12.49 garage, carport, deck, porch, shed (accessory building) $3.70 finish basement in dwelling unit $7.35 sunroom / solarium (not heated) $8.08 Group D - Business and Personal Service Occupancies Class of Permit Fee office or medical building, financial institution and occupancies of a similar nature - FINISHED $18.78 office or medical building, financial institution and occupancies of a similar nature - ARCHITECTURAL SHELL $15.39 Group E - Mercantile Occupancies Class of Permit Fee low rise retail store, strip plaza, small restaurant or 30 seats or less and occupancies of a similar nature - FINISHED $17.39 low rise retail store, strip plaza, small restaurant or 30 seats or less and occupancies of a similar nature - ARCHITECTURAL SHELL $13.83 Group F - Industrial Occupancies Class of Permit Fee factory, plant, warehouse, industrial building and occupancies of a similar nature $12.50 Building By-law By-law 2019-83 Township of West Lincoln Page 18 Class of Permit Fee parking garage $13.75 service station and / or car wash $8.78 canopies including gas station canopies and those intended for the parking and loading or unloading of vehicles $5.60 solar collectors for swimming pools $191 flat Private Sewage Systems Class of Permit Fee new application and/or replacement of existing CLASS IV system $1300 flat minor sewage system repair or septic tank replacement $600 flat CLASS V installation $600 flat building addition / alteration $350 flat comment on consent applications $350 flat subdivision for each lot $350 flat Investigate complaint/site visit $350 flat Follow-up/site visit (non-routine inspections) $350 flat Analysis/report $350 flat Farm Buildings Class of Permit Fee Greenhouse $1.08 barn or agricultural building other than a greenhouse $2.53 Mobile / Portable Buildings Class of Permit Permit Fee trailer (construction trailer / sea container) $275 flat Building By-law By-law 2019-83 Township of West Lincoln Page 19 Class of Permit Permit Fee relocatable building / portable (support structure included) $409 flat CSA certified mobile home (foundation not included) $302 flat uncertified mobile home (foundation included) $9.16 mobile home foundation $3.70 Tents and Air Supported Structures Class of Permit Permit Fee air supported structure, tent, temporary fabric structure (use aggregate area for multiple tents) - under 250 m2 $235 flat air supported structure, tent, temporary fabric structure (use aggregate area for multiple tents) - 250 m2 or more $2.08 per sq. m over 250 sq. m. Signs Class of Permit Permit Fee signs - under 10m2 $300 flat signs - 10m2 or more $450 flat Designated Structures Class of Permit Permit Fee communication tower $352 flat Retaining wall, pedestrian bridge, crane, runway $18.49/$1,000 construction satellite dish with structural pedestal anchored to solid concrete pier and or building structure $18.49/$1,000 construction other designated structures as listed in Division A 1.3.1.1 of the Ontario Building Code $288 flat Building By-law By-law 2019-83 Township of West Lincoln Page 20 Miscellaneous Works Class of Permit Fee roof structure (replace, modify or alter structure) $201 flat Racking system $18.49/$1,000 construction installation of drainage layer & weeping tile system $230 flat minor alterations and repairs (not requiring plans) $168 flat underpinning / shoring $18.49/$1,000 construction temporary stages $316 flat demising wall / party wall installation $174 flat fireplace / woodstove $150 flat Fire Systems Class of Permit Fee Electromagnetic Locks $285.00 commercial kitchen hood & fire suppression system $352 flat fire alarm system upgrades / installations $468 flat sprinkler system upgrades / installations $468 flat standpipe system upgrades / installations $468 flat Energy Projects Class of Permit Fee industrial wind turbines subject to Renewable Energy Approval in accordance with the Green Energy and Green Economy Act $12,325 flat Solar panels $302 flat solar collector - swimming pool $150 flat solar collector - ground mounted $402 flat Building By-law By-law 2019-83 Township of West Lincoln Page 21 Class of Permit Fee solar collector - roof mounted $288 flat 2.2 ALTERATIONS AND REPAIRS Group A - Assembly Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $11.55 including plumbing OR mechanical (55% of full rate) $10.58 excluding plumbing AND mechanical (50% of full rate) $9.62 Group B - Institutional Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $12.65 including plumbing OR mechanical (55% of full rate) $11.60 excluding plumbing AND mechanical (50% of full rate) $10.55 Group C - Residential Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $8.82 including plumbing OR mechanical (55% of full rate) $8.08 excluding plumbing AND mechanical (50% of full rate) $7.35 foundation only - m2 $3.70 Group D - Business and Personal Service Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $11.27 including plumbing OR mechanical (55% of full rate) $10.33 Building By-law By-law 2019-83 Township of West Lincoln Page 22 Class of Permit Fee excluding plumbing AND mechanical (50% of full rate) $9.39 Group E - Mercantile Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $10.37 including plumbing OR mechanical (55% of full rate) $9.51 excluding plumbing AND mechanical (50% of full rate) $8.64 Group F - Industrial Occupancies Class of Permit Fee including plumbing AND mechanical (60% of full rate) $7.50 including plumbing OR mechanical (55% of full rate) $6.88 excluding plumbing AND mechanical (50% of full rate) $6.25 FARM ALTERATIONS Class of Permit Fee Farm buildings up to 116 sq m gross floor area-per building-m2 $6.40 Farm buildings over 116 sq m gross floor area - m2 $5.84 2.3 DEMOLITION Class of Permit Fee buildings less than 100m2 in gross floor area $168 flat all other demolitions $0.83 2.4 PLUMBING AND SEWER 2.4.1 Construction work related to plumbing and sewer installation when conducted as a component of other construction covered by a permit shall be included in the permit fee charged for that construction. Building By-law By-law 2019-83 Township of West Lincoln Page 23 2.4.2 Where plumbing or sewer works are done as standalone projects the following fees shall be applicable: Single, Semi-Detached, Duplex, Triplex, Fourplex, and Row House The fee shown below shall include all plumbing contained inside the building Class of Permit Fee first six (6) fixtures $218 flat each additional fixture $9.86 per fixture All Other Buildings The fee shown below shall include all plumbing contained inside the building Class of Permit Fee first five (5) fixtures $285 flat each additional fixture $9.86 per fixture Sewer and Water Main Installations The fee shown below shall include all buried pipe on private property outside the building Class of Permit Fee first fifteen (15) metres $168 flat each additional fifteen (15) metres $43.14 flat Specialized Plumbing Fixtures and Appurtenances The fee shown below shall include all plumbing contained inside the building Class of Permit Fee back flow preventer installation (water line) $168 flat back water valve (sewer) $168 flat Building By-law By-law 2019-83 Township of West Lincoln Page 24 Class of Permit Fee sump pump installation (weeping tile installation included) $352 flat grease / oil interceptor installation $352 flat 2.5 OTHER FEES Administration Class of Permit Fee transfer of permit $168 flat moving a building (all alterations & repairs subject to applicable charges as stipulated above) $168 flat deferral of permit revocation (per instance) $168 flat limiting distance agreement (registered on title) $1263 flat research request - Building Division Records search $107 / hour 911 house number - sign, post and installation (rural lots) $168 flat 911 house number - replacement of sign only $72 flat Permits Class of Permit Fee change of use (under 400m2) $168 flat change of use (400m2 or more) $0.93 change of use (no construction required) $89.96 flat partial occupancy permit for unfinished buildings $187 flat Inspections Class of Permit Fee non routine inspection $134 / hour illegal grow operation - general inspection $748 Building By-law By-law 2019-83 Township of West Lincoln Page 25 Class of Permit Fee illegal grow operation - occupancy inspection $898 off hours inspection $201 / hour unprepared for inspection $134 flat Plans Examination Class of Permit Fee stock plans examination (model plans reviewed without building permit application) $589.45 flat off hours plans examination requests (min. 4 hours) $201 per hour review of alternative solution (min. 4 hours) $168 per hour secondary plans examination $168 per hour review of revisions / amendments to permits $168 engineer review as determined by Chief Building Official actual cost plus 10% admin. costs 2.6 CONDITIONAL / PARTIAL PERMITS Class of Permit Percentage of Permit Fee conditional building permit agreement, in addition to all applicable building permit fees - the conditional building permit fee shall be a nonrefundable fee $898 flat Building Foundation - complete to grade including all underground services 15% Completed Structural Shell - complete exterior shell without any interior finishes 55% Completed Architectural Shell - complete exterior shell including interior finishes on exterior and structure walls 80% Building By-law By-law 2019-83 Township of West Lincoln Page 26 Class of Permit Percentage of Permit Fee Complete Building - includes all tenant improvements and complete interior finishes 100% 2.7 FEE BASED ON VALUE OF CONSTRUCTION Class of Permit Fee for categories of construction not listed above (minimum permit fee identified in subsection 1.2 of this schedule shall apply) $18.49 per $1,000 of valuated construction cost or portion thereof SECTION 3 DEPOSITS 3.1 PERFORMANCE / SECURITY 3.1.1 The performance / security deposit is collected by the Township to provide securities for any potential damage that may occur to municipal property through the course of the permitted construction. Furthermore, the deposit is also held for the assurance that all necessary inspections are completed through the duration of construction and finally to ensure that the permit file can be appropriately closed at the conclusion of the works. 3.1.2 An applicant shall be required to submit the applicable deposit(s) as specified below for each permit application submitted. 3.1.3 Where fees are incurred by the applicant through the course of the construction process, these fees shall be deducted from the submitted deposit and upon the close of the permit, any deposit funds remaining will be refunded to the applicant. Performance / Security Deposits Class of Permit Fee single, semi, duplex, triplex, fourplex, townhome $1,150 per dwelling unit addition(s) to buildings described above where excavation is required $863 flat buildings accessory to the buildings above w/ construction value greater than $3,500 $575 flat construction projects other than those described above (Site Plan Agreement IS required) $1,438 flat Building By-law By-law 2019-83 Township of West Lincoln Page 27 Class of Permit Fee construction projects other than those described above (Site Plan Agreement IS NOT required) $2,875 flat demolition project $863 flat moving a building $1,150 flat 3.2 LOT GRADING 3.2.1 The lot grading deposit is collected by the Township to provide securities to ensure compliance with the proposed lot grading plan submitted with the application. 3.2.2 An applicant shall be required to submit the applicable deposit(s) as specified below for each permit application submitted. Lot Grading Deposit Class of Permit Fee each dwelling on property in a plan of subdivision that HAS NOT already been assumed by the Township $1,150 per dwelling unit each dwelling on property other than those listed above $1,725 per dwelling unit 3.2.3 Where an applicant requests an extension for the completion of lot grading to allow occupancy of the dwelling in a plan of subdivision or plan of condominium to occur prior to the completion of lot grading in accordance with Article 3.6.4 of this by-law, any such request shall be accompanied by the following applicable deposit(s) as specified below for each dwelling having occupancy being requested. Occupancy despite Incomplete Lot Grading Deposit Class of Permit Fee single detached, semi-detached, duplex dwellings $4,000 per dwelling unit triplex, fourplex, street townhouse dwellings $3,450per dwelling unit condominium townhouse dwellings $2,875 per dwelling unit any dwelling type other than those listed above $2,300 per dwelling unit Building By-law By-law 2019-83 Township of West Lincoln Page 28 3.3 CONDITIONAL PERMIT 3.3.1 In the case of a conditional permit the applicant shall submit a conditional permit deposit which shall be calculated by the Chief Building Official to be a percentage of the value of construction as prescribed below. 3.3.2 The conditional permit deposit shall be submitted as a condition of a Conditional Permit Agreement whereby the agreement shall establish a limitation to the extent of permitted construction. 3.3.3 Where an applicant exceeds the limitations set out by the Conditional Permit Agreement, the Applicant shall be deemed to be in breach of the said agreement and as such the conditional permit deposit, in its entirety, shall be forfeited to the Township. Conditional Permit Deposit Class of Permit Fee conditional building permit deposit 10% of construction value (minimum $5,000) SECTION 4 REFUNDS 4.1 FEES 4.1.1 Pursuant to the provisions of Subsection 5.7 of this by-law, the fees that may be refunded shall be a percentage of the eligible applicable fees assessed by this Schedule of Fees, calculated by the Chief Building Official as follows: Stage of Permit Refund where the permit has been issued and field inspections have yet to be performed, subsequent to permit issuance 50% for each inspection conducted after issuance of the permit 5% 4.1.2 If the calculated refund is less than the minimum permit fee applicable to the work as described in Subsection 1.2 of this Schedule, no refund shall be made of the fees paid. 4.1.3 No fee shall be eligible for a refund where the request for refund is made twelve (12) months or more after the issuance of the permit. 4.2 DEPOSITS 4.2.1 The Performance / Security deposit identified in this Schedule shall be held by the Township until the work for which the permit has been issued has been completed in Building By-law By-law 2019-83 Township of West Lincoln Page 29 accordance with the stipulated requirements of the permit to the satisfaction of the Chief Building Official. The applicant shall be responsible for any damage to municipal property or any restriction and associated costs of any such damage or repair may be deducted by the Township in addition to any other available remedy or penalty. 4.2.2 Should the cost of repairs exceed the value of the deposit held, the Township shall invoice the applicant for the amount in excess of the deposit, and if such invoice is not paid by the stipulated due date, the Township may recover the costs by action or by adding the costs to the tax roll of the property to which the permit relates, and collecting them in the same manner as taxes according to Section s.1 (2.1) of the Municipal Act. 4.2.3 Should the Performance / Security deposit not be required to be called upon during the duration of the project, it will be released upon successful completion of the project in accordance with the approved permit documents which results in closure of such permit file unless the provisions of subsection 5.8 for the forfeiture of deposits has been applied. 4.2.4 The Lot Grading deposit and Occupancy despite Incomplete Lot Grading deposit identified in this Schedule shall be held by the Township until the lot grading of the lot is complete and the as built lot grading plan complying with the provisions of Article 3.6.1 of this by-law has been submitted to the satisfaction of the Chief Building Official. 4.2.5 In situations where the lot grading of the lot is not completed within the given timeline of seven (7) months from the date of issuance of the occupancy permit of the associated dwelling, the Lot Grading deposit and / or the Occupancy despite Incomplete Lot Grading deposit may be drawn upon to have the necessary lot grading works completed to conform to the original lot grading plan submitted and accepted through the issuance of the permit. 4.2.6 Should the cost to complete the lot grading work exceed the value of the deposit(s) held, the Township shall invoice the applicant for the amount in excess of the deposit(s) and if such invoice is not paid by the stipulated due date, the Township may recover the costs by action or by adding the costs to the tax roll of the property to which the permit relates, and collecting them in the same manner as taxes according to Section s.1 (2.1) of the Municipal Act. 4.2.7 Should the Lot Grading deposit and / or Occupancy despite Incomplete Lot Grading deposit not be required to be called upon during the duration of the project, it will be released upon the successful completion of the lot grading and the submission of the as built lot grading plan complying with the provisions of Article 3.6.1 of this by-law to the satisfaction of the Chief Building Official unless the provisions of subsection 5.8 for the forfeiture of deposits has been applied. SECTION 5 EXPLANATORY NOTES 5.1 AREA OF CALCULATION 5.1.1 The area to be used in the calculation of fees shall be the total area of all floors, including those below grade, measured between the outside surfaces of the exterior Building By-law By-law 2019-83 Township of West Lincoln Page 30 walls or between the outside surfaces of exterior walls and the centre line of firewalls. Area shall be calculated in square metres (m2) for the purpose of this schedule. 5.1.2 Where there are no floor or exterior walls for the project, area is to be calculated as the greatest horizontal area of the structure 5.1.3 No deductions shall be made in the calculation of floor area for openings such as stairs, elevators, shafts or ramps. 5.1.4 Unfinished or unoccupied basements and crawlspaces are not to be included in the calculation of area in fee calculations for new construction and additions. 5.2 INTERPRETATION 5.2.1 Major occupancy is based upon the classifications as provided in the Ontario Building Code. 5.2.2 A multiple unit (apartment) building is a building which consists of five (5) or more individual residential units in the same building. 5.2.3 An Alternative Solution is as defined in the Ontario Building Code. 5.2.4 The fee prescribed for and Alternative Solution shall be in addition to any other applicable fee prescribed by this Schedule. Should any additional fees be incurred by the Township in relation to the review of such a submission, but not limited to consultant fees, these costs shall be added to the calculated permit fee at 100% of its value. 5.2.5 Where multiple conditional permits are requested for the same property due to the construction of multiple buildings on the same property, the Chief Building Official may assign a value for the conditional building permit deposit that differs from that specified in the table above. This process may be utilized to collect a deposit for the property for the removal of the requested construction collectively as opposed to individually with each permit and shall be reflective of the cost associated with the removal of the requested construction. This deposit shall be associated and available to be drawn upon by each of the individual conditional building permits that it is assigned to represent. 5.3 DISPUTE 5.3.1 The permit fee shall be determined by the Chief Building Official or designate, on the basis of this Schedule. If the applicant disagrees with the fee so determined, then the prescribed fee shall be paid as a deposit and after the works are complete, a refund shall be made based on the actual work done and inspection performed, at the discretion of the Chief Building Official. Building By-law By-law 2019-83 Township of West Lincoln Page 31 Schedule "B" By-law No. 2019-83 SECTION 1 REQUIRED DRAWINGS AND SPECIFICATIONS 1.1 GROUP C OCCUPANCIES 1.1.1 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for each residential unit of a Single Detached, Semi- Detached, Triplex, Fourplex, and Townhouse type dwelling. 1.1.2 Required information for works identified in Article 1.1.1 shall include: (1) Site Plan(s) referenced to a legal plan of survey providing for: (a) Lot grading; (b) Drainage; and (c) Site servicing; (2) Architectural drawings and specifications providing: (a) Floor Plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Building sections, minimum one building section and one detailed wall section; (3) Mechanical drawings and specifications providing for heat loss/heat gain calculations; and (4) Structural drawings and specifications providing for product layout, confirmation of compliance with pre-engineered product specifications, and engineered sealed drawings for all point loaded and unique unspecified members where used within the proposed project for the following items: (a) pre-engineered lumber beams, lintels or columns; (b) pre-engineered lumber joists, and floor framing members; (c) pre-engineered lumber wall framing members; (d) pre-engineered lumber roof framing members and (e) pre-engineered roof truss systems. 1.1.3 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for any additions or alterations to a single detached, semi- detached, triplex, fourplex, and rowhouse type dwelling. 1.1.4 Required information for works identified in Article 1.1.3 shall include: (1) Where the proposed works extend outside of the existing building envelope, site plan(s) referenced to a legal plan of survey providing for: Building By-law By-law 2019-83 Township of West Lincoln Page 32 (a) Lot grading; and (b) Drainage; (2) Architectural drawings and specifications providing modification to: (a) Floor Plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Where new exterior walls or interior fire separations are to be constructed, building sections, minimum one detailed wall section; (3) Where additional interior tempered space is proposed to be added to the existing building, mechanical drawings and specifications providing for modifications to heat loss/heat gain calculations; and (4) Structural drawings and specifications providing for product layout, confirmation of compliance with pre-engineered product specifications, and engineered sealed drawings for all point loaded and unique unspecified members where used within the proposed project for the following items: (a) pre-engineered lumber beams, lintels or columns; (b) pre-engineered lumber joists, and floor framing members; (c) pre-engineered lumber wall framing members; (d) pre-engineered lumber roof framing members and (e) pre-engineered roof truss systems; 1.1.5 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for all Group C occupancies other than those specified in Article 1.1.1 or Subsection 1.3. 1.1.6 Required information for works identified in Article 1.1.5 shall include: (1) Site Plan(s) referenced to a legal plan of survey providing for: (a) Lot grading; (b) Drainage; and (c) Site servicing; (2) Geotechnical Investigation Report (two copies only); (3) Architectural drawings and specifications providing: (a) Floor plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Building sections, minimum one building section and one detailed wall section; (d) Architectural details; and (e) Schedules, including window, door and hardware; (4) Structural drawings and specifications providing for: Building By-law By-law 2019-83 Township of West Lincoln Page 33 (a) Foundation design(s); (b) Roof design(s); and (c) Structural framing design(s); (5) Mechanical drawings and specifications providing for: (a) Plumbing design(s); (b) HVAC design(s); (c) Sprinkler design(s); and (d) Standpipe design(s); (6) Electrical drawings and specifications providing for: (a) General lighting design(s); (b) Emergency and Exit lighting design(s); (c) Fire alarm design(s); and (d) Any other emergency life safety system design(s); 1.1.7 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for any additions or alterations to all Group C Occupancies other than those specified in Article 1.1.1 or Subsection 1.3. 1.1.8 Required information for works identified in Article 1.1.7 shall include: (1) Where the proposed works extends outside of the existing building envelope, site plan(s) referenced to a legal plan of survey providing for: (a) Lot grading; (b) Drainage; and (c) Site Servicing (2) Architectural drawings and specifications providing for modification to: (a) Floor plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Where new exterior walls or interior fire separations are to be constructed, building sections, minimum one detailed wall section; (3) Structural drawings and specifications providing for modification to: (a) Foundation design(s); (b) Roof design(s); and (c) Structural framing design(s); (4) Mechanical drawings and specifications providing for modification to: (a) Plumbing design(s); (b) HVAC design(s); (c) Sprinkler design(s); and (d) Standpipe design(s); Building By-law By-law 2019-83 Township of West Lincoln Page 34 (5) Electrical drawings and specifications providing for modifications to: (a) General lighting design(s); (b) Emergency and Exit lighting design(s); (c) Fire alarm design(s); and (d) Any other emergency life safety system design(s); 1.2 GROUP A, B, D, E and F OCCUPANCIES 1.2.1 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for Group A, B, D, E and F occupancies. 1.2.2 Required information for works identified in article 1.2.1 shall include: (1) Site Plan(s) referenced to a legal plan of survey providing for: (a) Lot grading; (b) Drainage; and (c) Site servicing; (2) Geotechnical Investigation Report (two copies only); (3) Architectural drawings and specifications providing: (a) Floor Plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Building sections, minimum one building section and one detailed wall section; (d) Architectural details; and (e) Schedules, including window, door and hardware; (4) Structural drawings and specifications providing for: (a) Foundation design(s); (b) Roof design(s); and (c) Structural framing design(s); (5) Mechanical drawings and specifications providing for: (a) Plumbing design(s); (b) HVAC design(s); (c) Sprinkler design(s); and (d) Standpipe design(s); (6) Electrical drawings and specifications providing for: (a) General lighting design(s); (b) Emergency and Exit lighting design(s); (c) Fire alarm design(s); and (d) Any other emergency life safety system design(s); Building By-law By-law 2019-83 Township of West Lincoln Page 35 1.2.3 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for any additions or alterations to all Group A, B, D, E and F Occupancies. 1.2.4 Required information for works identified in Article 1.2.3 shall include: (1) Where the proposed works extends outside of the existing building envelope, Site Plan(s) referenced to a legal plan of survey providing for: (a) Lot grading; (b) Drainage; and (c) Site Servicing (2) Architectural drawings and specifications providing for modification to: (a) Floor plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Where new exterior walls or interior fire separations are to be constructed, building sections, minimum one detailed wall section; (3) Structural drawings and specifications providing for modification to: (a) Foundation design(s); (b) Roof design(s); and (c) Structural framing design(s); (4) Mechanical drawings and specifications providing for modification to: (a) Plumbing design(s); (b) HVAC design(s); (c) Sprinkler design(s); and (d) Standpipe design(s); (5) Electrical drawings and specifications providing for modifications to: (a) General lighting design(s); (b) Emergency and Exit lighting design(s); (c) Fire Alarm design(s); and (d) Any other emergency life safety system design(s); 1.3 ACCESSORY USES TO GROUP C OCCUPANCIES 1.3.1 Unless otherwise specified by the Chief Building Official or stated below one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for structures such as decks, porches and other accessory buildings intended to be used complimentary to a Single Detached, Semi-Detached, Triplex, Fourplex, and Townhouse type dwelling. 1.3.2 Required information for works identified in Article 1.3.1 shall include: (1) Site Plan(s) referenced to a legal plan of survey providing for: Building By-law By-law 2019-83 Township of West Lincoln Page 36 (a) Lot grading; and (b) Drainage; (2) Architectural drawings and specifications providing: (a) Floor plan(s), minimum one per floor; (b) Elevations, minimum all sides affected by proposed work; (c) Building sections, minimum one detailed wall section; (3) Structural drawings and specifications providing for product layout, confirmation of compliance with pre-engineered product specifications, and engineered sealed drawings for all point loaded and unique unspecified members where used within the proposed project for the following items: (a) pre-engineered lumber beams, lintels or columns; (b) pre-engineered lumber joists, and floor framing members; (c) pre-engineered lumber wall framing members; (d) pre-engineered lumber roof framing members and (e) pre-engineered roof truss systems; 1.4 SPECIAL CATAGORIES / DESIGNATED STRUCTURES 1.4.1 Unless otherwise specified below, one (1) set or copy of all required information determined by the Chief Building Official on a case by case basis shall be submitted as part of a complete permit application submission for the following special categories of construction or designated structures: (1) Agricultural buildings; (2) Air supported structures, tents, temporary fabric structures (three sets); (3) Signs; (4) Trailers / Relocatable buildings; (5) Communication towers; (6) Wind turbine structures, on ground or roof mounted solar panels; and (7) Mobile homes. 1.5 DEMOLITION 1.5.1 Unless otherwise specified by the Chief Building Official or stated below, one (1) set or copy of all required information shall be submitted as part of a complete permit application submission for the demolition in part or in whole of any building. 1.5.2 Required information for works identified in Article 1.5.1 shall include: Building By-law By-law 2019-83 Township of West Lincoln Page 37 (1) Site Plan(s) referenced to a legal plan of survey providing for the location of the building or portion thereof to be demolished; and (2) A description of the structural design characteristics of the building and method of demolition prepared by a professional engineer where deemed necessary by the Chief Building Official and / or the Building Code. 1.6 MISCELLANEOUS WORKS AND PLUMBING 1.6.1 Unless otherwise specified below, one (1) set or copy of all required information determined by the Chief Building Official on a case by case basis shall be submitted as part of a complete permit application submission for the following miscellaneous works: (1) Underpinning; (2) Stages (three sets); (3) Demising wall / party wall Installation; (4) Fireplace / wood stove; (5) Commercial kitchen hood & fire suppression system (three sets); (6) Fire alarm system upgrades / installations; and (7) Sprinkler and / or standpipe system upgrades / installations. 1.6.2 Unless otherwise specified below, one (1) set or copy of all required information determined by the Chief Building Official on a case by case basis shall be submitted as part of a complete permit application submission for the following plumbing installation and / or modification projects: (1) Additions to an existing plumbing system; (2) Backflow preventer installation; (3) Back water valve installation (no drawings required); (4) Sump pit installation (no drawings required); and (5) Grease / oil interceptor installation; SECTION 2 DRAWING REQUIREMENTS 2.1 SITE DRAWINGS Building By-law By-law 2019-83 Township of West Lincoln Page 38 2.1.1 Unless otherwise specified by the Chief Building Official, site drawings required to accompany applications for permit shall be provided in accordance with the following table. Residential Dwellings Project Type Size Required Site Drawing new all sizes grading plan addition less than 50m2 survey sketch addition 50m2 and greater grading plan Buildings Accessory to Residential Dwellings Project Type Size Required Site Drawing new or addition less than 15m2 site sketch new or addition 15m2 to 100m2 survey sketch new or addition 100m2 and greater legal survey decks any size site sketch Agricultural Buildings Project Type Size Required Site Drawing new or addition less than 15m2 site sketch new or addition 15m2 to 100m2 survey sketch new or addition 100m2 and greater legal survey Other Buildings Project Type Size Required Site Drawing new all sizes legal survey addition all sizes legal survey Building By-law By-law 2019-83 Township of West Lincoln Page 39 Buildings Accessory to Other Buildings Project Type Size Required Site Drawing new or addition less than 15m2 site sketch new or addition 15m2 to 100m2 survey sketch new or addition 100m2 and greater legal survey Note: In all above tables, the size for additions refers to the aggregate area of the proposed construction only and not that of the completed building the addition is being added to and will be a part of. 2.1.2 Unless otherwise specified by the Chief Building Official where a legal survey is required it shall: (1) Be a legal plan of survey sealed and signed by an Ontario Land Surveyor or Engineer; (2) Be up to date and accurately illustrate the location, use, height and dimensions of any existing and proposed building(s) including, but not limited to, front, side and rear yard dimensions and relationships to adjoining property lines, Condominium Corporation lines and buildings, common element lines (where applicable); (3) Identify and include all easements and legal lot information including the legal description of the lot as well as survey property boundaries and dimensions, all bearing of metes and bounds and compass orientation; (4) Identify the relation of buildings and finished grade to existing elevations to identify general lot drainage and any storm water drainage control plan on site, where applicable; (5) Be drawn to scale in metric units; (6) Identify all existing and proposed parking layouts, retaining walls, swimming pools, accessory buildings and any other such physical additions necessary to the site; (7) Identify the location of all fire access routes with regard to the building, including all fire hydrants, siamese connections, and sources of water supply for firefighting (where applicable); (8) Identify the location of any and all existing / proposed private sewage systems and their components; and Building By-law By-law 2019-83 Township of West Lincoln Page 40 (9) Provide the total lot coverage of the property. 2.1.3 Unless otherwise specified by the Chief Building Official where a grading plan is required it shall: (1) Be a legal plan of survey sealed and signed by an Ontario Land Surveyor or Engineer; (2) Be up to date and accurately illustrate the location, use, height and dimensions of any existing and proposed building(s) including, but not limited to, front, side and rear yard dimensions and relationships to adjoining property lines, Condominium Corporation lines and buildings, common element lines (where applicable); (3) Identify and include all easements and legal lot information including the legal description of the lot as well as survey property boundaries and dimensions, all bearing of metes and bounds and compass orientation; (4) Include sufficient lot grading information to confirm compliance with the requirements for lot grading provided in the Ontario Building Code with regard to the proposed building as well as the master lot grading plan for the development where applicable; (5) Be drawn to scale in metric units; (6) Identify all existing and proposed parking layouts, retaining walls, swimming pools, accessory buildings and any other such physical additions necessary to the site; (7) Identify the location of all fire access routes with regard to the building, including all fire hydrants, siamese connections, and sources of water supply for firefighting (where applicable); (8) Identify the location of any and all existing / proposed private sewage systems and their components; and (9) Provide the total lot coverage of the property. 2.1.4 Unless otherwise specified by the Chief Building Official where a survey sketch is required it shall: (1) Be referenced to a legal plan of survey and include all easement information; (2) Be prepared using an acceptable electronic media drawing platform; Building By-law By-law 2019-83 Township of West Lincoln Page 41 (3) Be pertinent to the area of the property subject to the proposed construction (easements should be identified if pertinent to building location); (4) Be drawn to scale in metric units; (5) Identify the location of any and all existing / proposed private sewage systems and their components; and (6) Provide the total lot coverage of the property. 2.1.5 Unless otherwise specified by the Chief Building Official where a site sketch is required it shall: (1) Be prepared in a clear and concise manner; (2) Be pertinent to the area of the property subject to the proposed construction (easements should be identified if pertinent to building location); (3) Be drawn to scale in metric units; (4) Identify the location of any and all existing / proposed private sewage systems and their components; and (5) Provide the total lot coverage of the property. 2.2 ARCHITECTURAL DRAWINGS 2.2.1 Unless otherwise specified by the Chief Building Official, where architectural drawings are required they shall consist of: (1) Building Code matrix, foundation and grade details; (2) Each floor plan with exact dimensions of the layout of all proposed areas and identified with room names; (3) All wall thicknesses and type of construction, window and door openings and schedules, elevator, sections and details of all walls, stairs and exits, fire walls, fire separations, shaft and duct openings and other related pertinent information; (4) Building elevations, cross sections and wall sections showing all floor to floor heights, materials and thickness, etc.; and (5) Specifications where applicable. Building By-law By-law 2019-83 Township of West Lincoln Page 42 2.3 STRUCTURAL DRAWINGS 2.3.1 Unless otherwise specified by the Chief Building Official, where structural drawings are required they shall consist of: (1) All foundation, floor, roof and wall structural elements indicating sizes, shapes and proper locations, and all dead and live design loads and conditions of loading; (2) All reinforced concrete work indicating thickness and strength of concrete, as well as size, spacing, minimum cover and type of reinforcing steel; (3) All lintels, column and beam locations, and their size and snowdrift loading; (4) Where applicable, de-watering report and shoring or pile driving information; (5) Flow control roof drainage declaration to be completed; and (6) Specifications where applicable. 2.4 MECHANICAL AND ELECTRICAL DRAWINGS 2.4.1 Unless otherwise specified by the Chief Building Official, where mechanical drawings are required they shall consist of: (1) All plumbing, heating, ventilation and air conditioning including legends and schedules for compliance with the Building Code; (2) If space permits on drawing submissions for small buildings and dwellings, the information required from sentence (1) can be shown on the same plans as the architectural; (3) All ventilation and fire protection systems required for the installation of commercial cooking equipment; (4) Sprinkler and standpipe drawings are to include floor plans and riser diagrams to locate the entire system including connections and sprinkler heads as well as hydraulic calculations; and (5) Specifications where applicable. 2.4.2 Unless otherwise specified by the Chief Building Official, where electrical drawings are required they shall consist of: Building By-law By-law 2019-83 Township of West Lincoln Page 43 (1) Electrical drawings are to show lighting, emergency lighting, exit signs, fire alarms systems and their legends and schedules for compliance with the Building Code; (2) If space permits on drawing submissions for small buildings and dwellings, the information required from sentence (1) can be shown on the same plans as the architectural; and (3) Specifications where applicable. SECTION 3 REQUIRED FORMS 3.1 APPLICATION FORMS 3.1.1 The permit application form, provided by the Township of West Lincoln or the Ministry of Municipal Affairs and Housing shall be used for submission of all applications for a permit. 3.1.2 The permit for partial occupancy, transfer of permit and change of use application form shall be used by applicants in various types of applications. This form provides applicants with a form to submit the necessary information to the Chief Building Official for submission of applications for consideration for partial occupancy, change of use permits and requests for the transfer of permits. This form replaces the standard building permit application form in the change of use permit process. 3.1.3 The conditional building permit application form shall be used subsequent to the submission of an application for building permit to initiate a request for issuance of a conditional building permit. 3.2 SUPPLEMENTARY DATA FORMS 3.2.1 The Building Permit Supplementary Data form shall be submitted with all applications for a permit. The purpose of the form is to obtain the necessary supplemental data to allow for the issuance of a permit. 3.2.2 The Demolition Permit Supplementary Data form shall be submitted with all applications for a permit. The purpose of the form is to obtain the necessary supplemental data to allow for the issuance of a permit. 3.2.3 The Applicable Law checklist shall be completed for each application for permit regardless of type of permit being applied for to provide verification of compliance of the proposed construction with the applicable law requirements of the Building Code. 3.3 COMMITMENT FORMS 3.3.1 The General Review by Architects and Engineers form shall be completed and submitted as part of a complete application for every project where drawings are required by the Building Code to be prepared by an Architect or Engineer. Building By-law By-law 2019-83 Township of West Lincoln Page 44 3.3.2 The Authorized Agent form shall be completed and submitted as part of a complete application where an owner wishes to permit another party to act on their behalf for the purpose of application for permit and administration thereof. 3.3.3 If permitted to be accepted, an applicant shall complete and submit the Acknowledgement of Incomplete Application form to submit an application that does not satisfy the requirements of a complete application. 3.4 ENERGY CONSERVATION FORMS 3.4.1 The Energy Efficiency Design Summary form(s) shall be completed and submitted as a component of a complete application for the applicable type of construction for each application where works are required to satisfy Building Code requirements for energy efficiency.