| permit required for | Construction, demolition, change of use of buildings, and sewage systems | s. 3.1; s. 4.5.1 |
| fee basis | As set out in Schedule "A" (fee per square foot or per unit; minimum fee $250.00). | s. 5.1; Schedule "A" |
| authority | Chief Building Official and Building Inspectors | s. 2.1.6; s. 7.4; Schedule "D" |
scout note
Township of Wilmot's Building Code Act by-law respecting construction, demolition, change of use, conditional permits, sewage systems and inspections; appoints CBO, sets classes of permits (Schedule A), plan requirements (Schedule C), and a CBO/inspector code of conduct (Schedule D). Scanned PDF, confirmed via OCR.