By-law 14-2024 - Building By-law (Consolidated, revised Feb 19, 2025)

Woolwich, Ontario · No. 14-2024 · adopted 2024-03-19 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 977acac6f2bf · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

By-law No. 14-2024 Building By-law Consolidated Version Revised and Verified February 19, 2025 Revision History: Passed On: 14-2024 (Original) March 19, 2024 09-2025 February 18, 2025 Consolidated for Convenience Only This consolidated copy of a Woolwich Township By-law is for convenient information. While every effort is made to ensure the accuracy of this copy, the original By-law must be consulted for all legal interpretations and applications. For more information or to view By-laws please contact the Clerks Division. This document is available in alternate formats on request. Table of Contents Part I. Short Title, Purpose, and Scope ..................................................... 1 Short Title ............................................................................................ 1 Purpose ................................................................................................ 1 Scope .................................................................................................. 1 Part II. Interpretation .............................................................................. 2 Headings .............................................................................................. 2 References to Applicable Law ................................................................... 2 Definitions ............................................................................................ 2 Part III. Classes of Permits ...................................................................... 4 Set out ................................................................................................. 4 Part IV. Permits ....................................................................................... 4 File Application ...................................................................................... 4 Information Submitted to CBO ................................................................. 4 Conditional Permits ................................................................................ 7 Inactive Permit Application ...................................................................... 7 Part V. Plans and Specifications ............................................................... 7 Information Sufficient to Determine Conformity .......................................... 7 Two Complete Sets Required Unless Specified ............................................ 7 Plans Drawn to Scale on Durable Material .................................................. 7 Site Plans Referenced to Plan of Survey ..................................................... 8 As Constructed Plans .............................................................................. 8 Changes to Plans ................................................................................... 8 Alternative Solutions .............................................................................. 8 Plans - Property of Township ................................................................... 8 Part VI. Registered Code Agencies ........................................................... 9 Agreement with Registered Code Agency ................................................... 9 Appointment of Registered Code Agency .................................................... 9 Part VII. Fees and Refunds ...................................................................... 9 Due and Payable Upon Permit Issuance ..................................................... 9 Work Without Permit .............................................................................. 9 Revocation of Permit .............................................................................. 9 Part VIII. Transfer of Permits ................................................................ 10 Application Completed by New Owner ..................................................... 10 Fee for Transfer of Permit ..................................................................... 10 New Owner Permit Holder Upon Transfer ................................................. 10 Part IX. Revocation of Permits ............................................................... 10 Notice of Revocation ............................................................................. 10 Deferral of Revocation .......................................................................... 10 Fee for Deferral of Revocation ................................................................ 10 Reduction of Refund ............................................................................. 10 Part X. Notice Requirements for Inspections .......................................... 11 Notice Prior to Each Stage ..................................................................... 11 Effective When Received by CBO ............................................................ 11 Time Period - Inspections ..................................................................... 11 Part XI. Code of Conduct ........................................................................ 11 Code of Conduct for Building Officials ...................................................... 11 Part XII. Fencing .................................................................................... 11 Requirements for Construction Sites ....................................................... 11 Part XIII. Contravention of By-law ......................................................... 12 Offense .............................................................................................. 12 Part XIV. Conflict and Transition ............................................................ 12 Terms Severable .................................................................................. 12 Transition ........................................................................................... 13 Part XV. Enactment ................................................................................ 13 By-law Previous ................................................................................... 13 Schedule A - Refund of Permit Fees .......................................................... 14 Terms of Refund .................................................................................. 14 Schedule B - Schedule of Forms ................................................................ 15 Schedule of Forms ............................................................................... 15 Schedule C - Schedule of drawings, specifications and documents required for construction, demolition and change of use permits ............................ 16 Schedule D - Code of Conduct ................................................................... 24 Purpose: ............................................................................................ 24 Building Officials Shall: ......................................................................... 24 Breaches of the Code of Conduct: ........................................................... 24 Disciplinary Action: .............................................................................. 24 Schedule E - Fees and Charges .................................................................. 25 The Corporation of the Township of Woolwich By-law No. 14-2024 A By-law to provide for the construction, demolition, change of use and transfer of permits and inspections WHEREAS, Subsection 3(1) of the Building Code Act, 1992, S.O. 1992, c. 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992 in the municipality, except as otherwise provided in the Act; WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, c. 23 as amended authorizes a municipal council to pass By-laws respecting classes of building permits, permit application documents, forms, setting and refunding of fees, interest and penalties, inspections, establishing and governing prescribed Inspection Programs, and other related matters; AND WHEREAS Subsection 3(2) of the Building Code Act, 1992, S.O. 1992, c. 23, as amended, provides that the council of each municipality shall appoint a Chief Building Official and such inspectors as are necessary for the enforcement of the Building Code Act, 1992 in the areas in which the municipality has jurisdiction; NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWNSHIP OF WOOLWICH HEREBY ENACTS AS FOLLOWS: Part I. Short Title, Purpose, and Scope Short Title 1. This By-law shall be known as the "Building By-law". Purpose 2. This By-law has been enacted to regulate the construction, renovation, or any change of use of buildings and designated structures to promote safety and uniform standards. Scope 3. This By-law applies to all construction, demolition, or material alteration to a building, as defined in Section 1(1) of the Building Code Act, within the Township. Page 2 By-law No. 14-2024 Part II. Interpretation Headings 4. The division of this By-law into parts and the insertion of headings are for convenient reference only and shall not affect interpretation of the By-law. References to Applicable Law 5. All references to applicable law are ambulatory and apply as amended from time to time. Definitions 6. For the purposes of this By-law: Act means The Building Code Act, 1992, S.O. 1992, c. 23, as amended. Applicant means the owner of a building or property who applied for a permit, or any person authorized by the owner to apply for a permit on the owner's behalf, or any person or Corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or Corporation. Architect means the holder of a license, certificate of practice or a temporary license issued under the Architects Act as defined in the Ontario Building Code. As Constructed Plans means as-built (construction plans) as defined by Division A, Part 1 Article 1.4.1.2 of The Ontario Building Code. The Building Code means the regulation made under Section 34 of the Act. Building means Building as defined in Subsection 1(1) of the Building Code Act Plumbing means Plumbing as defined in Subsection 1(1) of the Building Code Act Building Official means a Chief Building Official, Deputy CBO, Building Official or Inspector appointed by the Municipality. CBO means the Chief Building Official appointed by the Township for the purposes of enforcement of the Act. Construct means construct as defined in subsection 1(1) of the Act. Demolish means demolish as defined in Subsection 1(1) of the Act. Designated Structure means a designated structure as described in Article 1.3.1.1. Division A, Part 1 The Ontario Building Code. Farm building means a farm building as defined in Article 1.4.1.2. Division A, Part 1, The Ontario Building Code. Page 3 By-law No. 14-2024 Inspector means an inspector appointed by the Township for the purposes of enforcement of the Act. Owner means the registered owner of the property and includes a lessee, mortgagee in possession, and the authorized agent in lawful control of the property. Permit means permission or authorization given in writing from the CBO to perform work, demolish, change the use of a building or part thereof, or to occupy a building or part thereof, as regulated by the Act and The Ontario Building Code. Permit Holder means the owner to whom a permit has been issued or where a permit has been transferred, the owner to whom the permit has been transferred. Person includes a corporation and a partnership and the heirs, executors, administrators and other legal representatives of a person to whom the context can apply according to law. Professional engineer or engineer means a person who holds a license or temporary license under the Professional Engineers Act, as defined in The Ontario Building Code. Registered Code Agency means a registered code agency as defined in subsection 1(1) of the Act. Sewage System means a sewage system as defined in Article 1.4.1.2. Division A, Part 1, The Ontario Building Code. Township means the Corporation of the Township of Woolwich. Work means construction or demolition of a building or part thereof, as the case may be and has the same meaning as construct as defined in Subsection 1(1) of the Act. Words/Terms Not Defined 7. Any word or term, not defined in this By-law, that is defined in the Act or The Ontario Building Code shall have the meaning ascribed to it in the Act or The Ontario Building Code. Page 4 By-law No. 14-2024 Part III. Classes of Permits Set out 8. Classes of permits, with respect to construction, demolition and change of use of buildings and permit fees shall be set out in Schedule E attached to this by-law. Part IV. Permits File Application 9. To obtain a permit, the owner or an agent authorized in writing by the owner shall file an application in writing, in person or via email by completing a prescribed form available from the CBO or from the Township or Ministry's website. Additional application forms prescribed by the CBO or the Township under clause 7(1)(f) of the Act are set out in Schedule B of this By-law. Information Submitted to CBO 10. Every application for a permit shall be submitted to the CBO, and contain the following information: a. Where an application is made for a construction permit under Subsection 8(1) of the Act, the application shall include: i. Completed Provincial application form, "Application for a Permit to Construct or Demolish" as authorized under subsection 8(1.1) of the Building Code Act, 1992, S.O. 1992, c. 23 ii. Complete plans and specifications, documents and other information as required by and as described in Schedule B of this By-law and Article 1.3.1.3. Division C, Part 1, The Ontario Building Code for the work to be covered by the permit; iii. Include completed forms as set out in Schedule B of this By-law, where applicable; and, iv. Include, where applicable, the registration number of the builder or vendor as provided in the Ontario New Home Warranties Plan Act, R.S.O. 1990, c.0.31 as amended. b. Where an application is made for a demolition permit under subsection 8(1) of the Act, the application shall include: i. The Provincial application form "Application for a Permit to Construct or Demolish"; as authorized under subsection 8(1.1) of the Building Code Act, 1992, S.O. 1992, c. 23 ii. Complete plans and specifications, documents and other information as required by Articles 1.2.2.3. & 1.3.1.1. and 1.3.1.3. Division C, Part 1, The Ontario Building Code and as Page 5 By-law No. 14-2024 described in Schedule C of this By-law for the work to be covered by the permit; and, iii. Completed forms as set out in Schedule B of this By-law, where applicable and include proof satisfactory to the CBO that arrangements have been made with the proper authorities for the cutting off and capping of all water, sewer, gas, electric, telephone or other utilities and services. c. Where application is made for a conditional permit under subsection 8(3) of the Act, the application shall: i. Include the complete Provincial application form, "Application for a Permit to Construct or Demolish"; as authorized under subsection 8(1.1) of the Building Code Act, 1992, S.O. 1992, c. 23 ii. Include complete plans and specifications, documents, and other information as required by Article 1.3.1.5. Division C, Part 1, The Ontario Building Code and as described in Schedule C of this By-law for the work to be covered by the permit; and additional information, including but not limited to, information supporting compliance with zoning and interim control By-laws, and the feasibility and cost of returning the site to its original condition; iii. State the reasons why the applicant believes that unreasonable delays in construction would occur if a conditional permit is not granted; iv. State the necessary approvals which must be obtained in respect of the proposed building and the time in which such approvals will be obtained; v. State the time in which an application, plans and specifications of the complete building will be filed with the CBO; vi. Be accompanied with a completed Conditional Permit Agreement and security deposit as prescribed by the CBO; and, vii. Include completed forms as set out in Schedule B of this By-law, where applicable. d. Where application is made for a change of use permit issued under subsection 10.(1) of the Act, the application shall: i. Use the Provincial application, "Application for a Permit to Construct or Demolish"; as authorized under subsection 8(1.1) of the Building Code Act,1992 ii. Include completed forms as set out in Schedule B of this By-law, where applicable; Page 6 By-law No. 14-2024 iii. Describe the building in which the occupancy is to be changed, with a description that will readily identify and locate the building; iv. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; and, v. Using Part 10 of The Ontario Building Code, include complete plans and specifications showing the current and proposed occupancy of all parts of the building, and which contain sufficient information to establish compliance with the requirements of The Ontario Building Code, including floor plans, details of wall, ceiling and roof assemblies, identifying required fire separations/fire resistance ratings and load bearing capacities, and details of the existing sewage system, if any. e. Where application is made for a sewage system permit issued under subsection 8(1) of the Act, the application shall: i. Use the Provincial application form, "Application for a Permit to Construct or Demolish"; as authorized under subsection 8(1.1) of the Building Code Act,1992 ii. Include complete plans and specifications, documents, and other information as required under Article 1.3.5.4. Division C, Part 1, The Ontario Building Code and as described in Schedule C of this By-law for the work to be covered by the permit; and. iii. Include completed forms as set out in Schedule B of this By-law, where applicable. f. Where application is made for a transfer of permit because of a change of ownership of the land, as permitted under clause 7.(1)(h) of the Act, the application shall: i. Provide the names and addresses of the previous and new owner; ii. Provide the date that the land ownership change took place; and, iii. Describe the permit that is being transferred. g. Where an application is found to be incomplete and does not comply with Article 1.3.1.3. Division C, Part 1 of The Building Code, the application may be accepted for processing at the discretion of the CBO, if the applicant acknowledges that the application is incomplete and therefore is not entitled to the time periods prescribed in Column 3 of Table 1.3.1.3. Division C, Part 1 of The Building Code. Page 7 By-law No. 14-2024 Conditional Permits 11. When, in order to expedite work, approval of a portion of the building or project is desired prior to the issuance of a permit for the complete building or project: a. An application shall be made, and all applicable fees associated with the scope of the partial permit, as well as for the complete project, shall be paid; and, b. Complete plans and specifications covering the portion of the work for which immediate approval is desired shall be filed with the CBO. c. Where a partial permit is requested the full building or project application is deemed to be incomplete. 12. Where a permit is issued for part of a building or project, this shall not be construed to authorize construction beyond the plans for which approval was given nor that approval will necessarily be granted for the entire building or project. Inactive Permit Application 13. Where an application for a permit remains incomplete or inactive for six months after it is made, the application may be deemed by the CBO to have been abandoned and notice thereof shall be given to the applicant. If an application is deemed to be abandoned, a new application must be filed and new drawings submitted for the proposed work. Part V. Plans and Specifications Information Sufficient to Determine Conformity 14. Sufficient information shall be submitted with each application for a permit to enable the CBO to determine whether or not the proposed construction, demolition, change of use or transfer of permit will conform with the Act, The Ontario Building Code and any other Applicable Law. Two Complete Sets Required Unless Specified 15. Each application shall, unless otherwise specified by the CBO, be accompanied by two complete sets of plans and specifications as described in Schedule C of this By-law. Plans Drawn to Scale on Durable Material 16. Plans shall be drawn to scale on paper, electronic media approved by the CBO and shall be legible. When requested by the Municipality, plans shall be submitted by electronic media approved by the CBO. Page 8 By-law No. 14-2024 Site Plans Referenced to Plan of Survey 17. Site plans shall be referenced to an up-to-date plan of survey, completed by an Ontario Land Surveyor and, when required to demonstrate compliance with the Act, The Ontario Building Code or other Applicable Law, a copy of the survey shall be submitted to the CBO. As Constructed Plans 18. On completion of the construction of a building, the CBO may require a set of as constructed plans, including a plan of survey showing the location of the building. Changes to Plans 19. After issuance of a permit under the Act, notice of any material change to a plan, specification, document, or other information on the basis of which a permit was issued, must be given in writing to the CBO together with the details of such change which is not to be made without the CBO written authorization. Alternative Solutions 20. Where an application for a permit or for authorization to make a material change to a plan, specification, document, or other information on the basis of which a permit was issued, contains equivalent materials, techniques and systems for which authorization under Clause 1.2.1.1.(1)(b) Division A, Part 1, The Ontario Building Code is requested, the following information shall be provided: a. A description of the proposed material, system or building design for which authorization under Clause 1.2.1.1.(1)(b) Division A, Part 1, The Ontario Building Code is requested including drawings and written description; b. Any applicable provisions and functional & objective statements of The Ontario Building Code. c. Evidence that the proposed material, system or building design will provide the level of performance required by The Ontario Building Code; and, d. Completed forms set out in Schedule B of this By-law, where applicable. Plans - Property of Township 21. Plans and specifications furnished according to this By-law or otherwise required by the Act become the property of the Township and will be disposed of or retained in accordance with the Municipal File Retention By- law as amended. Page 9 By-law No. 14-2024 Part VI. Registered Code Agencies Agreement with Registered Code Agency 22. Where the Township enters into an agreement with the registered code agency, the Township may appoint the agency to perform specified functions in respect of the construction of a building or class of buildings. Appointment of Registered Code Agency 23. The registered Code Agency may be appointed to perform one or more of the specified functions described in Section 15.15 of the Act. Part VII. Fees and Refunds Due and Payable Upon Permit Issuance 24. The CBO shall determine the required fees for the work proposed calculated in accordance with, Schedule E attached to this by-law, and where the fees payable are based on the prescribed value of the proposed work, the prescribed value of the proposed work shall mean the total cost of all work regulated by the permit, including the cost of all material, labour, equipment, overhead and professional and related services, but does not include the cost of the land. 25. The applicant shall pay the required fees at time of issuance of the permit and no permit shall be issued until the fees, therefore, have been paid in full. 26. Where the CBO has determined that the prescribed value to construct a building has been underestimated, the CBO will recalculate the permit fee to the revised prescribed value and the adjustment to the permit fee will be collected when the building permit is issued. Work Without Permit 27. Any person or Corporation who commences construction, demolition or changes the use of a building before submitting an application for a permit or receiving a permit, may, at the discretion of the CBO, be subject to all fines and penalties imposed under the Act., and Schedule E attached to this by- law. 28. In the case of withdrawal of an application, the abandonment of all or a portion of the work, refusal of a permit, or the non-commencement of any project, the CBO shall determine the amount of paid permit fees that may be refunded to the applicant, if any, in accordance with Schedule A of this By- law. Revocation of Permit 29. There shall be no refund of permit fees where a permit has been revoked under 8(10)(a) or 8(10)(f) of the Act. Page 10 By-law No. 14-2024 Part VIII. Transfer of Permits Application Completed by New Owner 30. A permit may be transferred if the new landowner provides the information in accordance with the requirements of Part 4, 10. f. of this By-law. Fee for Transfer of Permit 31. A fee shall be payable on an application for a transfer of permit as provided in Schedule E attached to this by-law. New Owner Permit Holder Upon Transfer 32. The new owner shall, upon a transfer of a permit, be the permit holder for the purpose of the Act and The Ontario Building Code. Part IX. Revocation of Permits Notice of Revocation 33. Prior to revoking a permit under subsection 8(10) of the Act, the CBO may serve a notice by personal service or registered mail at the last known address to the permit holder, and following a thirty (30) day period from the date of service the CBO may revoke the permit if grounds to revoke still exist without any further notice and all submitted plans and other information may be disposed of. Deferral of Revocation 34. A permit holder may within thirty (30) days from the date of service of a notice under this Part, request in writing to the CBO to defer the revocation by stating reasons why the permit should not be revoked. The CBO having regard to any changes to the Act, The Ontario Building Code or other Applicable Law may allow the deferral, in writing. Fee for Deferral of Revocation 35. A request for deferral shall be accompanied by the non-refundable fee therefore set out in Schedule E attached to this by-law. Reduction of Refund 36. A request for deferral of revocation is subject to an additional 5% refund reduction in accordance with section (1) of Schedule A of this By-law when a permit is subsequently revoked. Page 11 By-law No. 14-2024 Part X. Notice Requirements for Inspections Notice Prior to Each Stage 37. The permit holder shall notify the CBO of each stage of construction for which a mandatory notice is required under Article 1.3.5.1. Division C, Part 1, The Ontario Building Code and for additional notices as permitted under Article 1.3.5.2. Division C, Part 1, The Ontario Building Code. In addition, the permit holder shall provide the notice of completion as prescribed by Section 11 of the Act and 1.3.3.3. Division C, Part 1, The Ontario Building Code, or where occupancy is required prior to completion, notice of inspection to ensure that the requirements of Section 11 of the Act and Articles 1.3.3.1. & 1.3.3.2. Divisions C, Part 1, The Ontario Building Code are complied with. Effective When Received by CBO 38. A notice pursuant to this Part of the By-law is not effective until notice is actually received by the CBO. Time Period - Inspections 39. Upon receipt of proper notice, the Inspector shall undertake a site inspection of the building to which the notice relates in accordance with the time periods stated in Article 1.3.5.3. Division C, Part 1, The Ontario Building Code and Section 11 of the Act. Part XI. Code of Conduct Code of Conduct for Building Officials 40. The Code of Conduct and associated policies, as required under Section 7.1 of the Act, are set out in Schedule D of this By-law. Part XII. Fencing Requirements for Construction Sites 41. In addition to the requirements pertaining to Public Way Protection as set out in the Construction Project Regulations under the Occupational Health and Safety Act, the permit holder shall comply, and shall not cause or permit the builder or constructor under the permit to fail to comply with the provisions of this section. 42. Where a permit is issued on or after the date of enactment of this By-law, fencing sufficient to enclose the site of construction shall be maintained or erected and maintained, in compliance with the requirements of this section. 43. Every fence required under this section shall be a minimum 1.2 metres and a maximum of 1.8 metres in height, as measured from the highest adjacent grade. Page 12 By-law No. 14-2024 44. Every fence required under this section shall be located on the perimeter of the construction site as determined by the CBO and constructed as follows: a. If of chain link construction, a minimum 38mm diamond mesh chain link securely fastened to at least 38mm diameter metal tube or pipe or the same thickness T-bar posts. Such metal posts shall not be more than 3.048m on centre and embedded into the ground, providing a secure and rigid support. b. If of wood construction, the exterior face shall be at least 12.7mm thick exterior- grade plywood, particle board or equivalent material constructed so as not to provide footholds for climbing. The fencing shall be supported by at least 38mm wide by 89mm thick posts spaced at not greater than 2.438m on centre and embedded into the ground, providing a secure and rigid support. c. If the fence is of snow fence or heavy gage plastic mesh type, the fencing shall be securely fastened to T-bar posts at not greater than 2.438m on centre and embedded into the ground, providing a secure and rigid support, and that a 38mm x 89mm top rail be secured to the posts and fencing secured to 38mm x 89mm rail. d. Other materials or methods may be substituted, provided that there is an equivalent barrier between properties and an equivalent degree of safety and support provided. e. The use of barbed wire and razor wire are prohibited. 45. The fence may be provided with openings sufficient to accommodate construction vehicles, machines and any other equipment providing services to the construction site provided that these openings are closed off when no construction is being carried out on site, including daily shutdowns. Part XIII. Contravention of By-law Offense 46. Every person who contravenes any provision of this By-law is guilty of an offence and on conviction is liable to any penalties provided for under Section 36 of the Act. Part XIV. Conflict and Transition Terms Severable 47. In the event that any provision of this By-law is declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of the remaining provisions of this By-law. Page 13 By-law No. 14-2024 Transition 48. By-law Number 27-2017, as it read on the day of its repeal, is deemed to continue in force with respect to complete applications submitted pursuant to By-law Number 14-2024, as amended, before the day of this By-law coming into force. 49. This By-law shall apply to any application submitted on or after the day of this By-law coming into force, despite any such application being related to a previous application or to a subject matter dealt with under a previous application under By-law Number 27-2017, as amended. Part XV. Enactment By-law Previous 50. By-law #27-2017 and all of its amendments are hereby repealed and replaced with this By-law. FINALLY PASSED AND ENACTED this 19th day of March, 2024. Signature on file Mayor Signature on file Clerk Page 14 By-law No. 14-2024 Schedule A - Refund of Permit Fees Terms of Refund 1. The Permit Fees that may be refunded under Part 7 of this By-law are to be a percentage of the permit fees payable under this By-law subject to Sections 1 & 2 of this Schedule, as follows: a. 85% if, in the opinion of the CBO, administrative functions only have been performed; b. 75% if, in the opinion of the CBO, administrative and zoning functions only have been performed; c. 55% if, in the opinion of the CBO, administrative, zoning and plan examination functions only have been performed; d. 45% if the permit has been issued and no inspections have been performed subsequent to permit issuance; and e. An additional 5% of the original permit fee shall be deducted for each field inspection that has been performed after the permit has been issued. 2. Notwithstanding Section 1, hereof, no refund is to be made of an amount less than the minimum permit fee as per Schedule E attached to this by-law. Page 15 By-law No. 14-2024 Schedule B - Schedule of Forms Schedule of Forms 1. Application for a Permit to Construct or Demolish 2. Township of Woolwich Permit Application Appendix A 3. Demolition - Utility Sign off Form 4. Commitment to General Reviews by Architect and Engineers 5. Energy Efficiency Design Summary (Part 9 Residential) 6. Energy Efficiency Certification Form (Other than Part 9 Residential) 7. Ontario Building Code Data Matrix 8. Residential Mechanical Ventilation and Heating/Cooling Design Summary (HVAC) 9. Alternative Solution Form 10. Ontario Building Code Matrix - Part 10/Part 11 11. Flow Control Roof Drainage Declaration Page 16 By-law No. 14-2024 Schedule C - Schedule of drawings, specifications and documents required for construction, demolition and change of use permits 1. Two sets/copies of the following list of drawings, specifications and documents are required to be submitted in order for the various types of Building Permit Applications listed to be considered a complete application pursuant to Section 1.3 Division C, Part 1, The Ontario Building Code. a. Demolition (Full or Partial) i. Proof that arrangements have been made with the proper authorities for the cutting off and plugging of all water, sewer, gas, electric, telephone or other utilities and services. ii. Description of the structural design characteristics of the building and a method of demolition prepared by a Professional Engineer, where deemed necessary by the CBO - Article 1.2.2.3. Division C, Part 1, The Ontario Building Code. iii. Site/grading plan prepared by a Professional Engineer (P.Eng), Certified Engineering Technologist (CET) or Ontario Land Surveyor (OLS). iv. Site plan must locate all existing building(s) and delineate the building(s) to be demolished including the last known use of the building and list the floor area for each floor including all mezzanine(s) and basement. v. Complete Demolition Utility Sign off Form. b. Residential Deck or Porch Permit i. Site plan or survey and Grading Plan where required (See 2.b) ii. Floor plan, footing/foundation and framing plan iii. Elevation(s) iv. Section or detail of guard v. Connection details engineered stamped report/manufacturers specifications for railing system. c. Residential Accessory Buildings i. Site Plan or survey and Grading Plan where required (See 2.b) ii. Footing/Foundation plan/Engineered Floor Slab iii. Floor Plan (framing) Roof framing plan including all openings and exterior cladding. iv. Building Elevations (4) v. Building Section (min. 1) Page 17 By-law No. 14-2024 d. Residential Addition or Renovation Permit i. Site Plan or survey and Grading Plan where required (See 2.b) ii. Grading Plan prepared by a Professional Engineer (P.Eng.), Certified Engineering Technologist (CET) or Ontario Land Surveyor (OLS) as applicable. iii. Footing/Foundation Plan iv. Floor Plan (1 per floor and include framing, all dimensions, room names and indicate any new plumbing facilities) Roof framing plan including all openings and exterior cladding. v. Building Elevations (4) vi. Building Section (min. 1) vii. Letter of verification from heating designer of the capacity of the existing heating system viii. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable ix. Energy Efficiency Summary e. New Residential House, Semi-Detached, Townhouse or Duplex i. Approved Site Development Plan and Agreement ii. Site Plan iii. Grading Plan where required (See 2.b) iv. TARION (ONHWP) Registration Form v. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable vi. Verification of potable water supply if applicable vii. Footing/Foundation Plan viii. Floor Plan (1 per floor, and indicate all dimensions, room names and proposed plumbing fixtures) ix. Floor and Roof Framing Plans (include floor and roof truss drawings) x. Building Elevations (4) xi. Building Section (min. 2) xii. Details of construction of masonry fireplaces (if applicable) xiii. Mechanical Ventilation form xiv. Heat Loss/ Heat Gain Calculations and Furnace make/model Page 18 By-law No. 14-2024 xv. Energy Efficiency Summary xvi. Copy of Deed (if applicable) f. New Residential apartment building i. Approved Site Development Plan and Agreement ii. Geotechnical Investigation Report (2 copies) including verification of potable water supply, if applicable iii. Site Plan iv. Grading Plan where required (See 2.b) v. Verification of on-site water supply for firefighting vi. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable vii. Architectural Drawings viii. Floor Plan (one per floor) ix. Foundation Plan & Details x. Floor, Framing and Roof Structural Plan xi. Building Elevations xii. Building Sections xiii. Window & Door/Hardware Schedules xiv. Room Finish Schedules xv. Structural Drawings xvi. Mechanical Drawings xvii. Electrical Drawings xviii. Sprinkler and Standpipe Drawings, where applicable xix. Energy Efficiency Summary g. New Non-Residential Building or Addition (Part 3 or 9 Building) i. Approved Site Development Plan and Agreement ii. Geotechnical Investigation Report (2 copies) including verification of potable water supply, if applicable iii. Site Plan iv. Grading Plan where required (See 2.b) v. Verification of on-site water supply for firefighting vi. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable Page 19 By-law No. 14-2024 vii. Architectural Drawings viii. Structural Drawings ix. Mechanical Drawings x. Electrical Drawings xi. Sprinkler and Standpipe Drawings, where applicable xii. Energy Efficiency Summary h. Non-Residential Alteration/Renovation (Part 3 or 9 Building) i. Site Plan or Key Plan ii. Architectural Drawings iii. Structural Drawings iv. Mechanical Drawings v. Electrical Drawings vi. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable vii. Energy Efficiency Summary i. Designated Structures The following plans prepared and stamped by a Professional Engineer: i. Site Plan ii. Grading Plan, where applicable iii. Architectural Drawings Elevations, where applicable Sections and Detail, where applicable j. Farm Building i. Site Plan ii. Architectural, Structural, Mechanical & Electrical Drawings iii. MDS calculations, if applicable iv. Nutrient Management Strategy or Plan, if applicable v. Complete On-Site Sewage System Permit application or evaluation of existing private sewage system where applicable k. On-Site Sewage Systems i. Site evaluation report prepared by a Professional Engineer including soil permeability and soils conditions. Page 20 By-law No. 14-2024 ii. Site plan and grading/drainage plan(s) iii. Sewage system design and drawings iv. The CBO may require an Engineered plan and review on lots less that 2 acres (.8 ha). l. Swimming Pools i. Site Plan (note on the plan: the fence type and location plus pool size and setback from property lines and private sewage system where applicable) Grading Plan where required (See 2.b) m. Commercial Exhaust Hood (NFPA 96) i. Floor Plan ii. Mechanical Plan, Details and Section n. Electro-Magnetic Locking Devices i. Floor Plan ii. Electrical Plan, Details of connection with fire alarm system o. Plumbing or Backflow Prevention Device i. Plumbing Floor Plan ii. Where applicable, a company letter describing proposed work p. Wood stoves i. Manufactures specifications. ii. Wood Energy Technology Transfer (WETT) certification upon completion 2. Unless specified by the CBO, the following information shall be shown on plans or working drawings that accompany applications for permits: a. The Site Plan shall show: i. Survey property boundaries and dimensions, all building lines, bearings of metes and bounds and compass orientation (legal description); ii. The location, use, height and dimensions of any existing and proposed buildings including front, side and rear yard dimensions and relationships to adjoining property lines and buildings and the proposed lot coverage; iii. Existing and finished ground levels or grades, and first floor elevations referenced to an established datum at or adjacent to the site in respect of which an application is made; Page 21 By-law No. 14-2024 iv. Existing rights-of-way, easements, and municipal services; and, v. All existing and proposed parking layout, fire access routes, retaining walls, swimming pools, accessory buildings, septic systems, wells and any other such physical additions to the site. b. Grading Plan and Site Servicing Plan(s) shall: i. Be completed by a Professional Engineer (P.Eng.) for new construction of residential, industrial, institutional, or commercial buildings. ii. Be completed by an Ontario Land Surveyor (OLS), Certified Engineering Technologist (CET) or P.Eng. for all other projects. iii. Include information and details in accordance with the Township of Woolwich Engineering Development and Infrastructure Manual (EDIM) to sufficiently demonstrate that: iv. The proposed works are not untoward any Development Agreement registered on the lands (if applicable); v. that the works will not have a negative impact on the subject property or any other property; and, vi. that grading or servicing works associated with the project will be completed in accordance with Township Standards and good engineering practices. Lands that are subject to a Development Agreement registered on the title of the lands must have final lot grading acceptance by the Township Manager of Development Engineering (Lot Grading Certification) prior to the issuance of a Building Permit for any works on the land that could alter the lot surface or impact the grading, servicing, or stormwater design, as determined by the Township Manager of Development Engineering. This includes but is not limited to projects that require the removal of topsoil and/or sod, additions to existing structures, and the installation of retaining walls, walkways, decks, patios, pools, and sheds. The property owner shall be responsible for contracting the home builder to verify that Final Certification has been issued. The Township, Manager of Development Engineering at its discretion, may waive the requirement for Grading or Servicing Plans after considering the nature and scale of the proposed work and the anticipated impact on the site and surrounding environment. Page 22 By-law No. 14-2024 c. The Architectural Drawings shall show: i. Ontario Building Code Matrix; ii. Each floor plan with exact dimensions of the layout of all proposed areas and identify each with room names; iii. All wall thicknesses and type of construction, window and door openings, locations, size and schedules, elevator, sections and details of all walls, stairs and exits, fire walls, fire separations, shaft and duct openings and other related pertinent information;. iv. Building elevations, cross sections and wall sections showing all floor-to-floor heights, materials, and thickness etc.; and, v. Specifications where applicable. d. The Structural Drawings shall show: i. All foundation, floor, roof and wall structural elements indicating sizes shapes and proper location and all dead and live design loads and condition of loading; ii. All reinforced concrete work, indicating thickness and strength of concrete, size spacing minimum cover and type of reinforcing steel; iii. All lintels, column and beam locations and their size and snow drift loading; and, iv. Where applicable de-watering report and shoring or pile driving. e. The Mechanical and Electrical Drawings shall show: i. Mechanical drawings are to show the plumbing, heating, ventilation, and air conditioning, including legends and schedules for compliance with OBC. For Part 9 buildings, if room allows this information can be shown on the same plan as the architectural; ii. Electrical drawings are to show lighting, emergency lighting, exit signs, fire alarm systems and their legends and schedules for compliance with the OBC. For Part 9 buildings, if room allows, this information can be shown on the same plan as the architectural; and, iii. Sprinkler and Standpipe drawings are to include floor plans and riser diagrams to locate the entire system including connections, and sprinkler heads. f. The On-Site Sewage System Report shall include the following: i. The name, mailing address and telephone numbers of the person who prepared the report; ii. The date the evaluation was completed; Page 23 By-law No. 14-2024 iii. A scaled map of the site showing; 1. Legal description, lot size, property dimensions, existing rights- of-way, easements or municipal/utility corridors 2. The locations of items listed in Tables 8.2.1.6.A, 8.2.1.6.B and 8.2.1.6.C Division B - Part 8 The Ontario Building Code 3. The location of the proposed sewage system 4. The location of any unsuitable, disturbed or compacted areas; and, 5. The CBO may require an Engineered plan and review on lots less than one acre (0.40ha). iv. Soil investigation including: 1. Depth of bedrock 2. Depth to zones of soil saturation 3. Soil properties and permeability 4. Potential for flooding g. The following supporting documentation shall accompany applications for a permit, unless otherwise waived by the CBO: i. Real Property Report (Survey Plan) prepared by an Ontario Land Surveyor; ii. Driveway access permit approved by the authority having jurisdiction as may be applicable; iii. Copy of Deed, if applicable; iv. Where applicable, approvals by the Ontario Ministries of Labour, Energy & Natural Resources, Industry & tourism, Environment, the Ontario Liquor Control Board, Ontario Fire Marshall's Office, Conservation Authorities; and, v. Such other approvals as may be required to demonstrate compliance with applicable Law. The Township CBO, at its discretion, may waive any of the requirements noted above considering the nature and scale of the project. Page 24 By-law No. 14-2024 Schedule D - Code of Conduct Purpose: 1. To promote appropriate standards of behaviour by Building Officials (CBO Deputy CBO and Inspectors) in the exercise of their powers and the performance of their duties; 2. To prevent practices which may constitute an abuse of power; and 3. To promote appropriate standards of honesty and integrity. Building Officials Shall: 4. Act in the public interest, particularly with regard to the safety of buildings and structures. 5. Apply all relevant By-laws, codes, and standards in an impartial, consistent, fair and professional manner, independent of any external influence and without regard to any personal interests. 6. Abide with the provisions of the Building Code Act, The Building Code and other applicable Acts and Laws that regulate or govern Building Officials or their functions. 7. Not permit personal feelings, prejudices, animosities, or friendships to influence decisions. 8. Perform their duties and responsibilities impartially and in accordance with the highest professional standards. 9. Extend professional courtesy to all at all times. Breaches of the Code of Conduct: 10. Allegations made against the CBO shall be reviewed by the Senior Management Team or designate. 11. Allegations made against an Inspector shall be reviewed by the CBO and the Department Head or designate. Disciplinary Action: 12. Disciplinary Action arising from violations of the Code of Conduct is the responsibility of the Municipal employer and will be based on the severity and frequency of the violation in accordance with relevant employment standards. Page 25 By-law No. 14-2024 Schedule E - Fees and Charges BUILDING DIVISION SCHEDULE "E" By-law 14-2024 Group "A" Assembly Fee/sq.ft. Minimum/Flat Rate New and Additions $2.52 $130.00 Alterations/Renovation $0.52 $130.00 Portable Classroom/Temporary Buildings $422.00 / unit Group "B" Institutional Fee/sq.ft. Minimum/Flat Rate New and Additions $2.76 $130.00 Alterations/Renovation $0.52 $130.00 Group "C" Residential Fee/sq.ft. Minimum/Flat Rate New Single Family Dwellings (Detached, Semi, Townhouse, Row House, Detached Additional Dwelling Unit) $1.42 $130.00 Residential Additions $1.42 $130.00 Alterations/Renovations (all residential classifications) $0.52 $130.00 Basement Accessory Apartment Residential Attached Garage (Additions and New) $0.49 $130.00 New Apartment Building/ Triplex/ Multi-Residential $1.51 $130.00 Mobile Homes $0.56 $130.00 New Hotel/Motel $2.32 $130.00 Group "D" Business and Personal Services (Offices) Fee/sq.ft. Minimum/Flat Rate New and Additions - Shell Only $1.82 $130.00 New and Additions - Finished $1.91 $130.00 Alterations/ Renovations/ Finishing $0.52 $130.00 Group "E" Mercantile (Stores) Fee/sq.ft. Minimum/Flat Rate New and Additions - Shell Only $1.82 $130.00 New and Additions - Finished $1.91 $130.00 Alterations/ Renovations/ Finishing $0.52 $130.00 Group "F" Industrial Fee/sq.ft. Minimum/Flat Rate New and Additions - Shell Only $0.76 $130.00 New and Additions - Finished $1.01 $130.00 Alterations/ Renovations/ Finishing $0.52 $130.00 Group "G" Agricultural Fee/sq.ft. Minimum/Flat Rate Div. 1 - High-Hazard Agricultural Occupancies Livestock Facilities with below-floor liquid manure $0.53 $130.00 Feed Mills $0.53 $130.00 2025 Fees $350.00 plus $0.52/ft² BUILDING DIVISION SCHEDULE "E" By-law 14-2024 Grain Elevators $0.53 $130.00 Div. 2 - Agricultural Occupancies Livestock Facilities $0.53 $130.00 Farm Workshops $0.53 $130.00 Farm Storage Buildings $0.53 $130.00 Div. 3 - Greenhouse Agricultural Occupancies Greenhouses $0.06 $130.00 Div. 4 - Agricultural Occupancies with No Human Occupants Grain Bins (Flat Rate) -- $106.00 Silos (Flat Rate) -- $217.00 Storage Bins (Flat Rate) -- $106.00 Uncovered Manure Yard (Flat Rate) -- $325.00 Manure Tank (Flat Rate) -- $325.00 On-site Sewage Systems Fee/sq.ft. Minimum/Flat Rate Installation of a New Septic System (Flat Rate) -- $700.00 Replacement of Septic Tile Bed Only (Flat Rate) -- $700.00 Septic System Tank Replacement (Flat Rate) -- $350.00 Septic System Minor Repairs (Flat Rate) -- $350.00 Other Structures Fee/sq.ft. Minimum/Flat Rate Accessory Buildings (carport, detached garage, shed, etc.) $0.49 $130.00 Decks, Porches, Gazebo (Flat Rate) -- $130.00 Decks and Porches with Roof (Flat Rate) -- $248.00 Demolition (Flat Rate per Structure) -- $155.00 Elevator, Lift (per unit) -- $400.00 Fireplace, Wood Stove, Chimney -- $106.00 New Roof Structure $0.48 $130.00 Reclad Wall $0.11 / linear foot $130.00 Swimming Pool and Hot-Tub (above or below ground) -- $106.00 Underground Fire Reservoir (Flat Rate) -- $370.00 Below Grade Entrance Door on Existing Building (Interior and Exterior) -- $206.00 Retaining Wall or Underpinning $2.47 / linear foot $130.00 Foundation Only Permit $0.20 $130.00 Ceiling (new or replace) $0.14 $130.00 BUILDING DIVISION SCHEDULE "E" By-law 14-2024 Manufactured Structures Fee/sq.ft. Minimum/Flat Rate Air Supported Structure $0.33 $130.00 Other Designated Structures as per Ontario Building Code (Flat Rate) -- $248.00 Signs - Ground, Roof or Wall Mounted (Flat Rate Per Sign) -- $106.00 Signs - Temporary (Flat Rate Per Sign) -- $95.00 Solar Collector (Flat Rate) -- $403.00 Temporary Tent (Flat Rate per Tent) -- $202.00 Building/Site Services (per linear ft.) Commercial Kitchen, spray booth, dust collector (each) Connect to municipal water and/or sewer Electromagnetic Locks and Hold Open Devices (per device) Fire Alarm System Grease Interceptor HVAC permit (residential per suite) HVAC (non-residential) Plumbing fixture - all buildings (per fixture) Plumbing Permit Only Sprinkler System Standpipe and hose systems Alternative Solution for PART 9 Buildings Alternative Solution for PART 3 Buildings Conditional Permit, as per 8(3) of the B.C.A. Additional Inspection Fee Plumbing, Mechanical and Electrical Other Fees $800.00 10% of Building Permit Fee $130.00 inspection fee collected for each new inspection performed after 12 months of the Municipality issuing occupancy Minimum $130.00 or $10.00 per $1,000 construction value Minimum $130.00 or $10.00 per $1,000 construction value $450.00 Minimum $130.00 or $10.00 per $1,000 construction value $9.00 $130.00 Minimum $130.00 or $10.00 per $1,000 construction value $130.00 $130.00 $281.00 $148.00 $100.00 / device Minimum $130.00 or $0.80 per linear foot. BUILDING DIVISION SCHEDULE "E" By-law 14-2024 Registering and Un-Registering Orders on Title, as per B.C.A. Commencing Construction Without a Permit - Only applied if an Order under the Building Code Act has been issued. Change of Use Permit (no construction is required) Fee for transfer of permit Final Inspection Deposit for Single Family, Duplex, Semi- Detached, Townhouse, and Triplex Dwelling Units (see note below) Infill Grading Deposit fee - (Per Residential Dwelling Unit) File Search Fee (applied when file search is over 20 minutes of staff time). Liquor License Inspection (A.G.C.O. Letter) Minimum fee for any permit not listed Requested Inspection more than 5 years after last inspection. Re-Inspection Fee (At the discresion of the Chief Building Official) Interpretation Final Inspection Deposit: Revision to Permit Fee: Grading Deposit: A refundable deposit of $1500.00 shall be collected for the following buildings; Single Family dwelling, Duplex, Semi-Detached, Townhouse and Triplex dwelling units, and shall be refunded less any re-inspection fees or unpaid invoices upon completion of the final inspection clearing off any outstanding items within 12 months of the Municipality issuing occupancy. Final inspection fee is in regards to the structure only. The deposit is not to be applied for permits to construct accessory dwelling units A fee of $0.04 per square foot of the revised floor area shall be paid for examination of revised plans. A minimum fee of $130.00 shall be paid. A refundable Grading Deposit shall be collected for each building permit application for a Single Family, Duplex, Semi- Detached, Townhouse and Triplex dwelling unit, in accordance with the Development Engineering Fees and Charges By-Law or a Development Agreement. $130.00 $130.00 per each re-inspection of previous failed inspection $100.00 Flat Rate of $100.00 Minimum $130.00 or $10.00 per $1,000 construction value $130.00 $1,500 each Dwelling $3,000.00 $300 each 2 x permit fee Flat Rate of $276.00 BUILDING DIVISION SCHEDULE "E" By-law 14-2024 The following guidelines are to be applied in the calculation of permit fees: 10. Where demolitions of partitions or alterations to existing ceilings are part of an alteration or renovation permit, no additional fee is applicable. 11. Corridors, lobbies, washrooms, lounges, etc. are to be included and classified according to the major classification for the floor area on which they are located. 12. The classes of building permits and occupancy categories in the schedule correspond with the definitions of major occupancy classifications in the Ontario Building Code. For mixed occupancies, the permit fees for each of the applicable occupancy categories may be used. 13. 2 times the Building Permit fee can only be applied when construction starts without a Building Permit and an Order has been issued under the authority of the Building Code Act. 14. The Chief Building Official shall determine fees for classifications of permits not described or included in the schedule. 1. Floor area of the proposed work is to be measured to the outer face of exterior walls and to the center line of party walls or demising walls. 3. Mechanical penthouses and floors, mezzanines, lofts, habitable attics and interior balconies are to be included in all floor area calculations. 6. Finished basements for single detached dwellings (including semis, duplexes and townhouses, etc.) are to be charged the interior finishing fee in Schedule 'A'. 7. Fireplaces, HVAC, electrical, woodstoves, site services are included in the permit fee for single family dwellings. 8. Where interior alterations and renovations require relocation of sprinkler heads or fire alarm components, no additional charge is applicable. 9. Ceilings are included in both new and finished (partitioned) buildings. The permit fees for ceilings apply only when alterations occur in existing buildings. Minor alterations to existing ceilings to accommodate lighting of HVAC improvements are not chargeable fees. 2. In the case of interior alterations or renovations, area of proposed work is the actual space receiving the work, e.g. tenant sui 4. Except for interconnected floor spaces, no deduction is made for openings within the floor area (e.g. stairs, elevators, escalators, shafts, ducts, etc). 5. Unfinished basements for single detached dwellings (including semis, duplexes and townhouses, etc.) are not included in the floor area.