This is the exact embedded text of the captured official document.
Snapshot 99f5d6bd27de · verified 2026-09-25 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
BUILDING DIVISION
SCHEDULE "E"
By-law 14-2024
Group "A" Assembly
Fee/sq.ft.
Minimum/Flat Rate
New and Additions
$2.52
$130.00
Alterations/Renovation
$0.52
$130.00
Portable Classroom/Temporary Buildings
$422.00 / unit
Group "B" Institutional
Fee/sq.ft.
Minimum/Flat Rate
New and Additions
$2.76
$130.00
Alterations/Renovation
$0.52
$130.00
Group "C" Residential
Fee/sq.ft.
Minimum/Flat Rate
New Single Family Dwellings (Detached, Semi, Townhouse, Row
House, Detached Additional Dwelling Unit)
$1.42
$130.00
Residential Additions
$1.42
$130.00
Alterations/Renovations (all residential classifications)
$0.52
$130.00
Basement Accessory Apartment
Residential Attached Garage (Additions and New)
$0.49
$130.00
New Apartment Building/ Triplex/ Multi-Residential
$1.51
$130.00
Mobile Homes
$0.56
$130.00
New Hotel/Motel
$2.32
$130.00
Group "D" Business and Personal Services (Offices)
Fee/sq.ft.
Minimum/Flat Rate
New and Additions - Shell Only
$1.82
$130.00
New and Additions - Finished
$1.91
$130.00
Alterations/ Renovations/ Finishing
$0.52
$130.00
Group "E" Mercantile (Stores)
Fee/sq.ft.
Minimum/Flat Rate
New and Additions - Shell Only
$1.82
$130.00
New and Additions - Finished
$1.91
$130.00
Alterations/ Renovations/ Finishing
$0.52
$130.00
Group "F" Industrial
Fee/sq.ft.
Minimum/Flat Rate
New and Additions - Shell Only
$0.76
$130.00
New and Additions - Finished
$1.01
$130.00
Alterations/ Renovations/ Finishing
$0.52
$130.00
Group "G" Agricultural
Fee/sq.ft.
Minimum/Flat Rate
Div. 1 - High-Hazard Agricultural Occupancies
Livestock Facilities with below-floor liquid manure
$0.53
$130.00
Feed Mills
$0.53
$130.00
2025 Fees
$350.00 plus $0.52/ft²
BUILDING DIVISION
SCHEDULE "E"
By-law 14-2024
Grain Elevators
$0.53
$130.00
Div. 2 - Agricultural Occupancies
Livestock Facilities
$0.53
$130.00
Farm Workshops
$0.53
$130.00
Farm Storage Buildings
$0.53
$130.00
Div. 3 - Greenhouse Agricultural Occupancies
Greenhouses
$0.06
$130.00
Div. 4 - Agricultural Occupancies with No Human Occupants
Grain Bins (Flat Rate)
--
$106.00
Silos (Flat Rate)
--
$217.00
Storage Bins (Flat Rate)
--
$106.00
Uncovered Manure Yard (Flat Rate)
--
$325.00
Manure Tank (Flat Rate)
--
$325.00
On-site Sewage Systems
Fee/sq.ft.
Minimum/Flat Rate
Installation of a New Septic System (Flat Rate)
--
$700.00
Replacement of Septic Tile Bed Only (Flat Rate)
--
$700.00
Septic System Tank Replacement (Flat Rate)
--
$350.00
Septic System Minor Repairs (Flat Rate)
--
$350.00
Other Structures
Fee/sq.ft.
Minimum/Flat Rate
Accessory Buildings (carport, detached garage, shed, etc.)
$0.49
$130.00
Decks, Porches, Gazebo (Flat Rate)
--
$130.00
Decks and Porches with Roof (Flat Rate)
--
$248.00
Demolition (Flat Rate per Structure)
--
$155.00
Elevator, Lift (per unit)
--
$400.00
Fireplace, Wood Stove, Chimney
--
$106.00
New Roof Structure
$0.48
$130.00
Reclad Wall
$0.11 / linear foot
$130.00
Swimming Pool and Hot-Tub (above or below ground)
--
$106.00
Underground Fire Reservoir (Flat Rate)
--
$370.00
Below Grade Entrance Door on Existing Building (Interior and
Exterior)
--
$206.00
Retaining Wall or Underpinning
$2.47 / linear foot
$130.00
Foundation Only Permit
$0.20
$130.00
Ceiling (new or replace)
$0.14
$130.00
BUILDING DIVISION
SCHEDULE "E"
By-law 14-2024
Manufactured Structures
Fee/sq.ft.
Minimum/Flat Rate
Air Supported Structure
$0.33
$130.00
Other Designated Structures as per Ontario Building Code (Flat
Rate)
--
$248.00
Signs - Ground, Roof or Wall Mounted (Flat Rate Per Sign)
--
$106.00
Signs - Temporary (Flat Rate Per Sign)
--
$95.00
Solar Collector (Flat Rate)
--
$403.00
Temporary Tent (Flat Rate per Tent)
--
$202.00
Building/Site Services (per linear ft.)
Commercial Kitchen, spray booth, dust collector (each)
Connect to municipal water and/or sewer
Electromagnetic Locks and Hold Open Devices (per device)
Fire Alarm System
Grease Interceptor
HVAC permit (residential per suite)
HVAC (non-residential)
Plumbing fixture - all buildings (per fixture)
Plumbing Permit Only
Sprinkler System
Standpipe and hose systems
Alternative Solution for PART 9 Buildings
Alternative Solution for PART 3 Buildings
Conditional Permit, as per 8(3) of the B.C.A.
Additional Inspection Fee
Plumbing, Mechanical and Electrical
Other Fees
$800.00
10% of Building Permit Fee
$130.00 inspection fee collected for each new
inspection performed after 12 months of the
Municipality issuing occupancy
Minimum $130.00 or $10.00 per $1,000
construction value
Minimum $130.00 or $10.00 per $1,000
construction value
$450.00
Minimum $130.00 or $10.00 per $1,000
construction value
$9.00
$130.00
Minimum $130.00 or $10.00 per $1,000
construction value
$130.00
$130.00
$281.00
$148.00
$100.00 / device
Minimum $130.00 or $0.80 per linear foot.
BUILDING DIVISION
SCHEDULE "E"
By-law 14-2024
Registering and Un-Registering Orders on Title, as per B.C.A.
Commencing Construction Without a Permit - Only applied if an
Order under the Building Code Act has been issued.
Change of Use Permit (no construction is required)
Fee for transfer of permit
Final Inspection Deposit for Single Family, Duplex, Semi-
Detached, Townhouse, and Triplex Dwelling Units (see note
below)
Infill Grading Deposit fee - (Per Residential Dwelling Unit)
File Search Fee (applied when file search is over 20 minutes of
staff time).
Liquor License Inspection (A.G.C.O. Letter)
Minimum fee for any permit not listed
Requested Inspection more than 5 years after last inspection.
Re-Inspection Fee (At the discresion of the Chief Building Official)
Interpretation
Final Inspection Deposit:
Revision to Permit Fee:
Grading Deposit:
A refundable deposit of $1500.00 shall be collected for the following buildings; Single Family dwelling, Duplex, Semi-Detached,
Townhouse and Triplex dwelling units, and shall be refunded less any re-inspection fees or unpaid invoices upon completion of
the final inspection clearing off any outstanding items within 12 months of the Municipality issuing occupancy. Final inspection
fee is in regards to the structure only. The deposit is not to be applied for permits to construct accessory dwelling units
A fee of $0.04 per square foot of the revised floor area shall be paid for examination of revised plans. A minimum fee of
$130.00 shall be paid.
A refundable Grading Deposit shall be collected for each building permit application for a Single Family, Duplex, Semi-
Detached, Townhouse and Triplex dwelling unit, in accordance with the Development Engineering Fees and Charges By-Law
or a Development Agreement.
$130.00
$130.00 per each re-inspection of previous failed
inspection
$100.00
Flat Rate of $100.00
Minimum $130.00 or $10.00 per $1,000
construction value
$130.00
$1,500 each Dwelling
$3,000.00
$300 each
2 x permit fee
Flat Rate of $276.00
BUILDING DIVISION
SCHEDULE "E"
By-law 14-2024
The following guidelines are to be applied in the calculation of permit fees:
10. Where demolitions of partitions or alterations to existing ceilings are part of an alteration or renovation permit, no additional
fee is applicable.
11. Corridors, lobbies, washrooms, lounges, etc. are to be included and classified according to the major classification for the
floor area on which they are located.
12. The classes of building permits and occupancy categories in the schedule correspond with the definitions of major
occupancy classifications in the Ontario Building Code. For mixed occupancies, the permit fees for each of the applicable
occupancy categories may be used.
13. 2 times the Building Permit fee can only be applied when construction starts without a Building Permit and an Order has
been issued under the authority of the Building Code Act.
14. The Chief Building Official shall determine fees for classifications of permits not described or included in the schedule.
1. Floor area of the proposed work is to be measured to the outer face of exterior walls and to the center line of party walls or
demising walls.
3. Mechanical penthouses and floors, mezzanines, lofts, habitable attics and interior balconies are to be included in all floor
area calculations.
6. Finished basements for single detached dwellings (including semis, duplexes and townhouses, etc.) are to be charged the
interior finishing fee in Schedule 'A'.
7. Fireplaces, HVAC, electrical, woodstoves, site services are included in the permit fee for single family dwellings.
8. Where interior alterations and renovations require relocation of sprinkler heads or fire alarm components, no additional
charge is applicable.
9. Ceilings are included in both new and finished (partitioned) buildings. The permit fees for ceilings apply only when alterations
occur in existing buildings. Minor alterations to existing ceilings to accommodate lighting of HVAC improvements are not
chargeable fees.
2. In the case of interior alterations or renovations, area of proposed work is the actual space receiving the work, e.g. tenant sui
4. Except for interconnected floor spaces, no deduction is made for openings within the floor area (e.g. stairs, elevators,
escalators, shafts, ducts, etc).
5. Unfinished basements for single detached dwellings (including semis, duplexes and townhouses, etc.) are not included in
the floor area.