Building permits — Candle Lake, Saskatchewan

Do I need a building permit? What does it cost?

In the Resort Village of Candle Lake, Saskatchewan, building permit rules are set by Building Bylaw 05-2024, verified 2026-09-27. Permit fees: Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any deposit. Fees set in: A fee bylaw. Administered by: Building Official.

Building Bylaw 05-2024 adopted bylaw
permit required for Any construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building. s. 3, definition of 'Work'; s. 6(6)
exemptions Accessory structures used for storage less than 10 m2; decks where walking surface not more than 600 mm above adjacent ground; buildings exempted by Act/regulations. s. 5(3); s. 5(4)
fee basis Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any deposit. s. 6(7)
fees location A fee bylaw s. 6(7)(a)
authority Building Official s. 6(2)
scout note

Resort Village of Candle Lake Building Bylaw 05-2024.

Machine-readable: building-permits.json · Official website: https://candlelake.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities