{
 "answer": "In the Town of Leroy, Saskatchewan, building permit rules are set by Building Bylaw No. 5-2020, verified 2026-09-27. Exemptions: Accessory buildings with a building area not more than 10 m2, provided they do not create a hazard. Administered by: Local Authority (Town of LeRoy).",
 "municipality_id": "gx-000719",
 "municipality": "Leroy",
 "status_type": "Town",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://www.leroy.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw No. 5-2020",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://leroy.ca/wp-content/uploads/2021/08/Bylaw-5-2020-Building-Bylaw.pdf",
   "summary": "Town of LeRoy Bylaw 5-2020 respecting buildings, adopting the National Building Code under The Uniform Building and Accessibility Standards Act.",
   "capture_sha256": "3aafa6416065a1327341e74898926a2752df2ba2061f530ee7c6248f1aa79e71",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "5-2020",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/3aafa6416065a1327341e74898926a2752df2ba2061f530ee7c6248f1aa79e71.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "New building construction, structural changes, RTM buildings, demolition, repair, relocation, alteration, addition, change of occupancy, accessory buildings larger than 10 sq. m, decks over 1200mm, basement development.",
    "exemptions": "Accessory buildings with a building area not more than 10 m2, provided they do not create a hazard.",
    "fee_basis": "Building permit: $100 administration fee plus service fees for plan review, field inspection of construction and enforcement, plus flat fee(s) charged by Saskatchewan Assessment Management Agency; demolition/removal permit: $50.00.",
    "authority": "Local Authority (Town of LeRoy)"
   },
   "fact_citations": {
    "permit_required_for": "s. 5(1)(a)-(h)",
    "exemptions": "s. 5(9)",
    "fee_basis": "s. 7(5)(a)-(c); s. 8(1)(a)",
    "authority": "s. 6(1); s. 6(3)"
   },
   "transcript_url": "/ca/sk/leroy/building-permits/bylaw-5-2020/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/sk/leroy/building-permits/"
}