Building permits — Ogema, Saskatchewan

Do I need a building permit? What does it cost?

In the Town of Ogema, Saskatchewan, building permit rules are set by Bylaw No. 2023-07 — The Building Bylaw (A Bylaw Respecting Buildings), verified 2026-09-27. Fees set in: service provider agreement. Administered by: Building Official; local authority (Town of Ogema).

Bylaw No. 2023-07 — The Building Bylaw (A Bylaw Respecting Buildings) adopted bylaw
permit required for Construction, addition, erection, placement, alteration, repair, renovation, reconstruction, use, occupancy or change of occupancy of a building; demolition, relocation or removal; retaining walls greater than 600 mm differential grade. s. 5(1); s. 5(2); s. 7(3)
exemptions Accessory buildings not greater than 10 m2 (107.6 ft2) if no hazard/sleeping accommodations; decks under 600 mm (2 ft) differential grade on residential land; qualifying farm buildings. s. 4(4); s. 4(5); s. 6(2)
fee basis For construction etc.: $20.00 plus building official service fee, SAMA fee, and applicable taxes; demolition/removal: $50.00 plus refundable deposit; relocation: $50.00 plus building permit fee. s. 5(1); s. 5(2)
fees location service provider agreement s. 5(1); s. 5(3)
authority Building Official; local authority (Town of Ogema) s. 3(3); s. 8(5); s. 8(6); s. 14(1)
scout note

GOVSK-model building bylaw: permit required for work on buildings (farm buildings partly exempt); fee = admin fee + plan review/inspection per service-provider agreement + SAMA fee; flat demolition/relocation fees ($50) plus refundable deposits ($2,500-$10,000). Repeals bylaws #270, #279, #2022-10, #2023-01, #2023-03.

Town of Ogema — Bylaws (index)

Bylaws index listing Town of Ogema bylaws including Bylaw 2023-07 The Building Bylaw and a separate Building Permit Application form.