| permit required for | Work, including construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building, must not commence before a permit is issued. | s. 3; s. 6(6) |
| exemptions | Farm buildings meeting definition, but residential occupancies cannot be exempt. | s. 5(5) |
| fee basis | Value of construction, as established by local authority/building official; permit deposit $100. | s. 6(7); s. 6(10) |
| authority | Building Official and local authority. | s. 6(2); s. 6(3) |
scout note
Bylaw No. 5-2022 respecting buildings, administering and enforcing the building code within the RM of Antler No. 61.